IR 07100117/2011021

From kanterella
Revision as of 11:23, 8 September 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Partially Withheld Insp Rept 70-0036/97-203 on 971117-1121. Violations Noted.Details Withheld,Per 10CFR2.790
ML20198G248
Person / Time
Site: 07000036, 07100117
Issue date: 12/24/1997
From:
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To:
Shared Package
ML20070L124 List:
References
70-0036-97-203, 70-36-97-203, NUDOCS 9801120283
Download: ML20198G248 (2)


Text

._-- -_ _ __ _ . .

' *

,

!

.

'

l

,

,

', DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED

'

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS Docket No.: 70 36

'

License No.: SNM 33 Report No.: 70 36/97 203 Safeguards Group; lli Licensee: ABB Cory:bustion Engineering, In Fuel 0,*,3ratione Manufacturing Facility Location: Hematite, MO

Dates: November 17 21,1997  ;

'

Inspectors: C. Collins, MC&A Physical Scientist, inspection Section O. Whaley, MC&A Physical Scientist, inspection Section D. McGowan, Pacific Northwest Nat'onal Lab, provided technical assistance

' Approved by: P. Ting, Chief Operations Branch Division of Fuel Cycle Safety and Safeguards, NMSS Enclosure DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED DOCUMENT TRANSMITTED HEREWITH CONTAINS 2,790 INFORMATION E* *E NM36 C PDR

.. - _. - _

,

_~_ _ .. . -.__ ..- . - .

. ,

.

.

.

,

-

,

', CONTAINS 10 CFR 2.790 INFORMATION-2-

.

EXECUTIVE SUMMARV ABB Combustion Engineoring, In Fuel Operations M:mufacturing Facility inspection Report No. 70 30/97 203 MODO The programs examined during this routine and announced material control aM ar, counting (MC&A) safeguards inspection included: MC&A Management Structure Measurement, Measurement Control, Physical inventory, Item Control, and the Assessment Progra Edlull5 Within the scope of the inspection, one non-cited violation (NCV) was identified, and six inspecie. followup items (IFis) and one violation from prior inspections were close MR&A. Management Structure Operator response to the overflow de lonized water tank event on November 17,1997, was noted as a performance weaknes The review of the ABB MC&A organization indicated that the MC&A group is in transition, while new individuals become familiar with their MC&A respocsibilities and a ststistician is secured for the group. No discrepancies with the organizational structure Were identifie With regard to the computer systems and year 2000 (Y2K) issues, no current items, findings, or issues were found in any area. Mtential issues with the need for a clear and implemented definition of revision do exist with regard to new systems and future upgrades to existing systems. This also involves creating a central repository for life cycle documentation, as well as separating development personnel from those individuals overseeing configuration management .

- Meaturement Program and Me.asurement ContCol The inspectors reviewed the licensee's key measurement systems and measurement control program relative to the vertical slice, and nc discrepancies were identifie CONTAINS 10 CFR 2.790 INFORMATION

,

n , y - - - . , . ~ ,