ML20134M683

From kanterella
Jump to navigation Jump to search
Partially Withheld Insp Rept 70-0036/96-203 on 961021-25. Violations Noted.Details Withheld,Per 10CFR2.790
ML20134M683
Person / Time
Site: 07000036
Issue date: 11/22/1996
From: Eckfeld E, Schwink W, Whaley D
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To:
Shared Package
ML19353E003 List:
References
70-0036-96-203, 70-36-96-203, NUDOCS 9611250231
Download: ML20134M683 (1)


Text

__ _

. . - , DECONTROLLED WHEN 2.7C0 INFORMATION ENCLOSURES ARE REMOVED The information on this page is considered appropriate for public disclosure pursuant to 10 CFR 2.790(d) I 1

U. S. NUCLEAR REGULATORY COMMISSION

, 0FFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS i Report h).: 70-36/96-203 l

License No.: SNM-33 l l

Safeguards Group: III

~

Licensee: ABB Combustion Engineering, Inc.

Hematite, M0 i Inspection Conducted: October 21 - 25, 1996 J

i Inspectors: b D. L. Whaley, Physical Sc3entist

/I!19 Datle Si'gned

Inspection Section, Operations Branch I

..a hc) llfllf?/S E. L. Eckfelp, Physical Scientist Date Signec Inspection Section, Operations Branch I Approved by: ](

W. S. Schwink, Section Chief

//[22/f6 Date Signed Inspection Section, Operations Branch l

SUMMARY

l Scope: The areas examined during this routine material control and accounting safeguards inspection included the Measurement Control l Program, Physical Inventory, the Resolution Program and licensee l action with regard to previously identified follow-up items. I Results: Within the scope of the inspection, three new inspector follow-up items (IFI) were opened. Two previous violations were closed during the inspection, but three IFIs from a previta inspection remain open.

Enclosure 1 9611250231 961122 PDR- ADOCK 07000036 C PDR DECONTROLLED WHEN 2.790 INFORMATION

. ENCLOSURES ARE REMOVED l DOCUMENT TRANSMITTED HEREWITH CONTAINS 2.790 INFORMATION

.