ML20134M683

From kanterella
Jump to navigation Jump to search
Partially Withheld Insp Rept 70-0036/96-203 on 961021-25. Violations Noted.Details Withheld,Per 10CFR2.790
ML20134M683
Person / Time
Site: 07000036
Issue date: 11/22/1996
From: Eckfeld E, Schwink W, Whaley D
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To:
Shared Package
ML19353E003 List:
References
70-0036-96-203, 70-36-96-203, NUDOCS 9611250231
Download: ML20134M683 (1)


Text

__

, DECONTROLLED WHEN 2.7C0 INFORMATION ENCLOSURES ARE REMOVED The information on this page is considered appropriate for public disclosure pursuant to 10 CFR 2.790(d)

U. S. NUCLEAR REGULATORY COMMISSION 0FFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS Report h).:

70-36/96-203 License No.:

SNM-33 Safeguards Group:

III

~

Licensee:

ABB Combustion Engineering, Inc.

Hematite, M0 Inspection Conducted:

October 21 - 25, 1996 J

Inspectors:

b

/I!19 D. L. Whaley, Physical Sc3entist Datle Si'gned i

Inspection Section, Operations Branch

..a hc) llfllf?/S E. L. Eckfelp, Physical Scientist Date Signec Inspection Section, Operations Branch Approved by:

](

//[22/f6 W. S. Schwink, Section Chief Date Signed Inspection Section, Operations Branch

SUMMARY

Scope:

The areas examined during this routine material control and accounting safeguards inspection included the Measurement Control Program, Physical Inventory, the Resolution Program and licensee action with regard to previously identified follow-up items.

Results: Within the scope of the inspection, three new inspector follow-up items (IFI) were opened. Two previous violations were closed during the inspection, but three IFIs from a previta inspection remain open.

9611250231 961122 PDR-ADOCK 07000036 C

PDR DECONTROLLED WHEN 2.790 INFORMATION ENCLOSURES ARE REMOVED DOCUMENT TRANSMITTED HEREWITH CONTAINS 2.790 INFORMATION

.