NOTICE OF VIOLATION ABB Combustion Engineering, Inc.
Docket No. 070-00036 Hematite, Missouri License No. SNM-S3 During an NRC inspection conducted from March 1 through 5,1999, one violation of NRC requirements was identified. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," (Enforcement Policy) NUREG-1600, Revision 1, the violation is listed below:
' icense No. SNM-33, Safety Condition S-1 states, in part, that the license b authorized for use in, ccordance with the statements and representations in Chapters 1 through 8 of the application.
Chapter 1.6(e), " Exemptions and Special Authorizations," requires, in part, that ABB Combustion Engineering, Inc., shall perform integrated Safety Assessments / Hazard Analysis
'or plant processes. For equipment important to safety, programs for testing, calibration, and inspection of all instrumentation and control systems (important to safety) are required to be included in the hazard analyses o assure the equipment reliability.
Chapter 2.6 " Operating Procedures," states, in part, that operations which affect licensed material shall be conducted in accordance with approved written procedures. Suitable control measures are prescribed, and pertinent control procedures relatise to nuclear criticality safety and radiological safety are followed.
Integrated Safety Analysis for tne Oxide Conversion Facility, dated March 27,1996, defined the scale / load cell for the uranium hexafluoride cold trap system in the vaporization room as equipment important to radiological safny and required that the scale / load cell be calibrated.
Operation Sheet Procedure No. 4101.65, Vxide inspection and Alarm Calibration / Testing,"
prescrit'9d the implementation of the program for testing, calibration, and inspection of all instrumentation ar;d control systems important to safety, relative to the uranium hexafluoride cold trap system, to assure the equipment reliability.
Contrary to the above, prior to March 3,1999, the licensee's operating procedures failed to prescribe control measures for the programs to test, calibrate, and inspect instrumentation and control systems important to safety for the uranium hexafluoride cold trap syste, as identified m
in the Integrated Safety Analysis. Specifically, Procedure No. 4101.00, " Oxide Inspection and Alarm Calibration / Testing," failed to prescribe a program for the testing, calibration, and inspection for the scale / load cell of the uranium hexafluoride cold trap system, equipment defined as important to radiological safety in the Oxide Conversion Facility Integrated Safety Assessment.
This is a Severity Level IV violation (Supplement VI). (VIO 070-00036/99001-01) 9903300056 990323 PDR ADOCK 07000036 C
p l
Notice of V,olation (
Pursuant to the provisions of 10 CFR 2.201, ABB Combustion Engineering, Inc., is hereby required io submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555 with a copy to the Re;;!onal Administrator, Region Ill, within 30 days of the date of the letter transmitting this Notice of Violation (Notice). This reply should be clearly marked as a " Reply to a Notice of Violation" and should include for ersch violation: (1) the reason for the violation, or, if contested,
- the basis for disputing the violation, (2) the corrective steps that have been taken and the l
results achieved. (3) the corrective steps that will be take:. to avoid further violations, and j
(4) the date when full compliance will be achieved. Your response may reference or include prei!ously docketed correspondence, if the correspondence adequately addresses the required l
response if an adequate reply is not received within the time specified in this Notice, an Order i
or a Demand for information may be issued as to why the certificate should not be modified, l
suspended, or revoked, or why such other action as may be proper should not be taken.
Where good cause is shown, consideration will be given to extending the response time.-
If you contest this enforcement action, you should also provide a copy of your response, with the basis for your denial, to the Director, Office of Enforcement, United States Nuclear l
Regulatory Commission, Washington, D.C. 20555-0001.
Because your response will be placed in the NRC Public Document Room (PDR), to the extent possible, it should not include any personal privacy, proprietary, or safeguards information so that it can be placed in the POR without redaction. If personal privacy or proprietary information l
is necessary to provide an acceptable response, then please provide a bracketed copy of your response that identifies the information that should be protected and a redacted copy of your response that deletes such iMormation. If you request withholding of such material, you myal specifically identify the portions of your response that you seek to have withheld and rovide in detail the bases for your claim of withholding,(e.g., explain why the disclosure of infomaion will c:aate an unwarranted invasion of personal privacy or provide the information requirm Jy 10 CFR 2.790(b) to support a request for withholding confidential commercial or financial information). If safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21 in accordance with 10 CFR 19.11, you may be required to post this Notice within two working j
days.
Dated this 23d day of March 1999 i