ML23150A171

From kanterella
Revision as of 22:45, 8 June 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Form 5.1-1 Post Exam Check Sheet
ML23150A171
Person / Time
Site: Byron  Constellation icon.png
Issue date: 05/30/2023
From:
NRC/RGN-III/DORS/OB
To:
NRC/RGN-III
Bruce Bartlett
References
Download: ML23150A171 (1)


Text

Form 5.1-1 Post examination Check Sheet Post examination Check Sheet Facility: Byron Dates of Examination: December 12, 2023 Date Activity Description Complete

1. *Received post examination package from facility licensee and 01/03/2023 verified complete. (ES-4.4)
2. *Reviewed and incorporated any necessary facility and applicant 01/23/2023 written examination comments. NRC grading of written examination completed. (ES-4.4)
3. *Reviewed and incorporated any necessary facility and applicant 01/11/2023 operating test comments. NRC grading of operating test completed.

(ES-3.6)

4. *Completed NRC chief examiner review of operating test and written 02/01/2023 examination grading. (ES-3.6 and ES-4.4) 01/06/2023
5. Completed licensing official review.
6. Mailed licenses, preliminary results, and pass letters. 02/27/2023 02/27/2023
7. Notified facility licensee of results.
8. Issued the examination report (refer to Operator Licensing Manual 03/07/2023 Chapter (OLMC) 510, Operator Licensing Examination Reports).
9. Returned reference material after final resolution of any informal 04/18/2023 NRC staff reviews, hearing demands, or both. [Excess Material deleted]
10. Performed examination recordkeeping activities (refer to OLMC 520, 05/30/2023 Operator Licensing Examination Records and Documentation, and Management Directive 3.53, NRC Records and Document Management Program).
  • Activity may not be applicable for a retake examination. If this activity does not apply, place an N/A in the Date Complete column.