ML17262A059
From kanterella
Revision as of 05:08, 26 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML17262A059 | |
Person / Time | |
---|---|
Site: | Robinson ![]() |
Issue date: | 09/18/2017 |
From: | Sherman C E Duke Energy Progress |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
RNP-RA/17-0065 | |
Download: ML17262A059 (19) | |
Similar Documents at Robinson | |
---|---|
Category:Inservice/Preservice Inspection and Test Report
MONTHYEARRA-23-0064, Inservice Testing Program Plan and Snubber Program Plan for Sixth 10-Year Inservice Testing (1ST) Program Interval2023-04-24024 April 2023
[Table view]Inservice Testing Program Plan and Snubber Program Plan for Sixth 10-Year Inservice Testing (1ST) Program Interval RA-20-0329, Proposed Alternative for Inservice Inspection of the Containment Metallic Liner and Moisture Barriers2021-09-0707 September 2021 Proposed Alternative for Inservice Inspection of the Containment Metallic Liner and Moisture Barriers RA-21-0056, Refueling Outage 32 Steam Generator Tube Inspection Report2021-05-26026 May 2021 Refueling Outage 32 Steam Generator Tube Inspection Report RA-19-0393, Refuel 32 (R2R32) Inservice Inspection Program Ninety Day Owner'S Activity Report2021-03-0808 March 2021 Refuel 32 (R2R32) Inservice Inspection Program Ninety Day Owner'S Activity Report RA-19-0138, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Vessel Cold Leg Dissimilar Metal Weld Inspections2019-07-23023 July 2019 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Vessel Cold Leg Dissimilar Metal Weld Inspections RA-19-0106, Relief Requested in Accordance with 10 CFR 50.55a(z)(1) for Volumetric or Surface Examination of Code Case N-729-4 Examinations of the Reactor Pressure Vessel Upper Head2019-07-10010 July 2019 Relief Requested in Accordance with 10 CFR 50.55a(z)(1) for Volumetric or Surface Examination of Code Case N-729-4 Examinations of the Reactor Pressure Vessel Upper Head RA-19-0094, Refuel 31 (R231) Owner'S Activity Report, Fifth 10-Year Inservice Inspection Interval2019-02-20020 February 2019 Refuel 31 (R231) Owner'S Activity Report, Fifth 10-Year Inservice Inspection Interval RNP-RA/17-0065, Refueling Outage 30 Steam Generator Tube Inspection Report2017-09-18018 September 2017 Refueling Outage 30 Steam Generator Tube Inspection Report RNP-RA/17-0051, Submittal of Nine Day Inservice Inspection Summary Report2017-06-29029 June 2017 Submittal of Nine Day Inservice Inspection Summary Report RNP-RA/15-0081, Submittal of Ninety-Day Inservice Inspection Summary Report2015-09-17017 September 2015 Submittal of Ninety-Day Inservice Inspection Summary Report RNP-RA/15-0063, Submittal of Ninety Day Inservice Inspection Summary Report - Supplement2015-07-0808 July 2015 Submittal of Ninety Day Inservice Inspection Summary Report - Supplement RNP-RA/14-0061, Submittal of Snubber Examination and Testing Program2014-05-29029 May 2014 Submittal of Snubber Examination and Testing Program RNP-RA/14-0040, Relief Request (RR)-10 for Expanded Applicability for Use of ASME Code Case N-532-4, Repair/Replacement Activity Documentation Requirements and Inservice Summary Report Preparation and Submission, Per 10 CFR 50.55(a)(3)(i)2014-05-0909 May 2014 Relief Request (RR)-10 for Expanded Applicability for Use of ASME Code Case N-532-4, Repair/Replacement Activity Documentation Requirements and Inservice Summary Report Preparation and Submission, Per 10 CFR 50.55(a)(3)(i) RNP-RA/14-0014, Submittal of Ninety Day Inservice Inspection Summary Report2014-01-30030 January 2014 Submittal of Ninety Day Inservice Inspection Summary Report RNP-RA/12-0119, Supplemental Response to Request for Additional Information Related to Relief Request (RR)-07 from Immediate ASME Code Repair of Refueling Water Storage Tank Drain Valve (SI-837) for Fifth Ten-Year Inservice Inspection Program...2012-11-11011 November 2012 Supplemental Response to Request for Additional Information Related to Relief Request (RR)-07 from Immediate ASME Code Repair of Refueling Water Storage Tank Drain Valve (SI-837) for Fifth Ten-Year Inservice Inspection Program... RNP-RA/12-0067, Response to the NRC Request for Additional Information Regarding Inservice Inspection Program Plan for the Fifth Ten-Year Interval2012-06-19019 June 2012 Response to the NRC Request for Additional Information Regarding Inservice Inspection Program Plan for the Fifth Ten-Year Interval RNP-RA/12-0063, Submittal of 90 Day Inservice Inspection Summary Report2012-06-15015 June 2012 Submittal of 90 Day Inservice Inspection Summary Report RNP-RA/12-0064, Response to NRC Request for Additional Information Related to Relief Requests (RR)-2 for the Fifth Ten-Year Interval Inservice Testing Program Plan2012-06-0404 June 2012 Response to NRC Request for Additional Information Related to Relief Requests (RR)-2 for the Fifth Ten-Year Interval Inservice Testing Program Plan RNP-RA/12-0056, Response to NRC Request for Additional Information for the Fifth Ten-Year Interval Inservice Testing Program Plan2012-05-10010 May 2012 Response to NRC Request for Additional Information for the Fifth Ten-Year Interval Inservice Testing Program Plan RNP-RA/12-0017, Inservice Testing Program Plan for the Fifth-Ten Year Interval2012-03-16016 March 2012 Inservice Testing Program Plan for the Fifth-Ten Year Interval RNP-RA/12-0023, Inservice Inspection Program for the Fifth Ten-Year Interval2012-03-14014 March 2012 Inservice Inspection Program for the Fifth Ten-Year Interval ML1103300852011-01-27027 January 2011 H. B. Robinson, Unit 2 - Request for Relief from ASME Boiler and Pressure Vessel Code, Section Xi, for the Fourth Ten-Year Inservice Inspection Program Program Interval (Relief Request No. RR-23) RNP-RA/10-0091, Submittal of 90 Day Inservice Inspection Summary Report2010-09-22022 September 2010 Submittal of 90 Day Inservice Inspection Summary Report RNP-RA/09-0010, Submittal of 90 Day Inservice Inspection Summary Report for Refueling Outage 252009-02-11011 February 2009 Submittal of 90 Day Inservice Inspection Summary Report for Refueling Outage 25 RNP-RA/08-0047, Response to NRC Request for Additional Information on the Steam Generator Inservice Inspection Results2008-04-30030 April 2008 Response to NRC Request for Additional Information on the Steam Generator Inservice Inspection Results RNP-RA/07-0077, Submittal of 90 Day Inservice Inspection Summary Report2007-08-0202 August 2007 Submittal of 90 Day Inservice Inspection Summary Report RNP-RA/06-0001, Submittal of 90 Day Inservice Inspection Summary Report2006-01-16016 January 2006 Submittal of 90 Day Inservice Inspection Summary Report RNP-RA/04-0110, Submittal of 90 Day Inservice Inspection Summary Report2004-08-26026 August 2004 Submittal of 90 Day Inservice Inspection Summary Report RNP-RA/03-0034, Revision to Inservice Testing Program Relief Request IST-RR-3 for Containment Spray Pump Comprehensive Pump Test Requirements2003-04-15015 April 2003 Revision to Inservice Testing Program Relief Request IST-RR-3 for Containment Spray Pump Comprehensive Pump Test Requirements RNP-RA/03-0018, Submittal of 90 Day Inservice Inspection Summary Report2003-02-11011 February 2003 Submittal of 90 Day Inservice Inspection Summary Report RNP-RA/02-0065, Relief Request Number RR-12 for the Fourth Ten-Year Interval Inservice Inspection Program2002-05-14014 May 2002 Relief Request Number RR-12 for the Fourth Ten-Year Interval Inservice Inspection Program ML0205703112002-02-20020 February 2002 Revision 1 to Inservice Testing Program Plan - Fourth Interval. 2023-04-24 Category:Letter MONTHYEARIR 05000261/20230042024-01-31031 January 2024
[Table view]Integrated Inspection Report 05000261/2023004 ML24009A2432024-01-25025 January 2024 Unit, No. 2 - Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0047 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24009A2712024-01-24024 January 2024 Revision to Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML23354A0052024-01-0808 January 2024 Request for Withholding Information from Public Disclosure, H. B. Robinson Steam Electric Plant, Unit No. 2 ML23342A0902023-12-0808 December 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000261/20234202023-11-30030 November 2023 Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) IR 05000261/20230102023-11-28028 November 2023 Fire Protection Team Inspection Report 05000261/2023010 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000261/20230032023-11-0707 November 2023 Integrated Inspection Report 05000261 2023003 and 07200060 2023001 ML23226A0862023-10-12012 October 2023 Issuance of Amendment No. 277 Regarding Revision of TSs to Add High-High Steam Generator Level Function to Table 3.3.2-1 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML23235A0552023-08-23023 August 2023 Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI) IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) IR 05000261/20230022023-08-0707 August 2023 Integrated Inspection Report 05000261/2023002 IR 05000261/20234022023-05-30030 May 2023 Cyber Security Inspection Report 05000261/2023402 ML23145A1602023-05-25025 May 2023 Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality IR 05000261/20230012023-05-0202 May 2023 Integrated Inspection Report 05000261/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) ML23047A4512023-02-21021 February 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000261/2023402 ML23041A2272023-02-13013 February 2023 2022 Q4 Robinson_Workflow Final ML22329A2982023-01-19019 January 2023 Issuance of Amendment No. 274 Regarding Revision of Technical Specification 3.8.1 Surveillance Requirement 3.8.1.16 ML22294A0922022-12-15015 December 2022 Issuance of Amendment No. 273 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML22339A1362022-12-0101 December 2022 2023 Requalification Program Inspection - H.B. Robinson Nuclear Plant ML22322A1322022-11-18018 November 2022 301, NRC Operator License Examination Report & Cover Letter Merged ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000261/20220032022-11-0303 November 2022 Integrated Inspection Report 05000261 2022003 IR 05000261/20224022022-10-19019 October 2022 Security Baseline Inspection Report 05000261/2022402 IR 05000261/20220102022-09-26026 September 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 IR 05000261/20223012022-09-23023 September 2022 301 Operator License Exam Approval Letter (05000261/2022301) ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports IR 05000261/20220052022-08-26026 August 2022 Updated Inspection Plan for the H.B Robinson Steam Electric Plant - Report 05000261/2022005-Final IR 05000261/20214042022-08-10010 August 2022 Reissue - H.B. Robinson Steam Electric Plant Security Baseline Inspection Report 05000261/2021404 IR 05000261/20220022022-08-0909 August 2022 Integrated Inspection Report 05000261 2022002, 07200060 2022001 and Exercise of Enforcement Discretion ML22213A0682022-08-0505 August 2022 Request for Withholding Information from Public Disclosure for H. B. Robinson Steam Electric Plant, Unit 2 ML22193A2122022-08-0404 August 2022 Request of Alternatives to ASME Code Section XI Subsection IWE Requirements for Containment Inspections ML22159A2952022-08-0303 August 2022 Issuance of Amendment No. 271 Regarding Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/Temperature Limit Cooldown Curves IR 05000261/20220112022-07-19019 July 2022 Biennial Problem Identification and Resolution Inspection Report 05000261/2022011 ML22167A1702022-07-14014 July 2022 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML22125A1942022-05-12012 May 2022 Request for Withholding Information from Public Disclosure for H.B. Robinson Steam Electric Plant, Unit 2 IR 05000261/20220012022-05-0202 May 2022 Integrated Inspection Report 05000261/2022001 IR 05000261/20224012022-04-19019 April 2022 Security Baseline Inspection Report 05000261/2022401 ML22098A2262022-04-11011 April 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22083A0032022-03-29029 March 2022 Closeout of Bulletin 2012 01, Design Vulnerability in Electric Power System IR 05000261/20210062022-03-0202 March 2022 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 (Report No. 05000261/2021006) 2024-01-08 |
Retrieved from "https://kanterella.com/w/index.php?title=ML17262A059&oldid=356540"