Monthly Operating Rept for May 1983
ML20072A264
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 06/03/1983
From: Jackie Cook, Corbin McNeil
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
JAFP-83-0583, JAFP-83-583, NUDOCS 8306100017
Download: ML20072A264 (7)


Text

.

OPERATING DATA REPORT DOCKET NO. 50-333 DATE June 1983 COMPLETED BY 1. Cook TELEPHONE (315)342-3840 OPERATING STATUS FitzPatrick Notes

1. Unit Name:
2. Reporting Period: 830501-830531 2436
3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe): 821 0
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Gise Reasons:

None

9. Power Level To Which Restricted,if Any (Net MWe):
10. Reasons For Restrictions,if Any:

This Month Yr.-to-Date Cumulatise

'lI. Hours In Reporting Period 744 3623 68760

12. Number Of Hours Reactor Was Critical 744 3317.5 49573.2
13. Reactor Reserve Shutdown Hours 0 0 0
14. Hours Generator On-Line 744 3287.6 48302.8
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 1726344 7588680 101112538
17. Gross Electrical Energy Generated (MWH) 585990 2572980 35007760
18. Net Electrical Energy Generated (MWH) 568515 2494270 33358655
19. Unit Service Factor

. O.2%

20. Unit Availability Factor 100% 90.7% 70.2%
21. Unit Capacity Factor (Using MDC Net) 94.3% 84.9% 63.8%
22. Unit Capacity Factor (Using DER Net) 93.1% 83.9% 59.1%

0 9.3% 15.3%

l 23. Unit Forced Outage Rate

24. Shutdowns Scheduled Over Next 6 Months (Type. Date and Duration of Each):

Refuel Outage scheduled to conunence June 3,1983 lasting approximately 84 days.

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIA L ELECTRICITY l COMMERCIAL OPERATION l

' 8306100017 830603 PDR ADOCK 05000 R j

AVER AGE DAILY UNIT POWER LEVEL

~

DOCKET NO.

50-333 l

, FitzPatrick DATE June 1983

. COMPLETED BY e

T'ELEPilONE (315)342-3840 MONDI May 1983 DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (M We-Net) (MWe Net) 670 17 777 733 gg 790 2

-3 775 19 789 796 87 4 20 .

5 800 21 787 796 22 785 6

799 784 7 23 8

798 24 781 800 25 780 9

10 796 26 779 gg 795 27 775 79l 12 28 13 798 29 773 g4 607 772 30 571 743

. 15 31 685 16

SUMMARY

The FitzPatrick Plant operated at near full thermal power for this 1

i reporting period with one power reduction for Control Rod Withdrawals.

l i

o DOCKET NO. 50-333 UNIT SIIUTDOWNS AND POWER REDUCTIONS FitzPatrick UNIT N AM E DATE June 1983 May 1983 COMPLETED BY J. Cook REPORT MONT11 TELEPilONE (3151142-1840 r.

- E c

, .I E 3ii; jYE Licensee Eg *g g" Cause & Currective

%. Date g g yg5 Event gj gg Action to H yE $ 35g e.

Report a mV o v

Prevent Recurrence Q

7 830514 s 0 4 4 N/A N/A N/A Reduced power for Control Rod Withdrawals.

1 I 2 3 4 F: Forced Reason: Method: Exlubit G . Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2 ManualScram. Entry Sheets for Licensee C. Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 01611 -

E Operator Training & License Examination F-Administ rative 5 G Opersiional Error (Explain) Esinbit I- Same Souree ll Other ( E xplain) -

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT .

SAFETY RELATED ELECTRICAL 8 MECHANICAL MAINTENANCE

SUMMARY

MAY 1983 8

DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T 5/5 12 24806 AIRBORNE Blown packing Repacked 30 MOV-18 ACTIVITY 5/14 24 25700 OPERATIONS Defective K-13 relay Replaced relay 6 EOD-2 5/31 03 16290 INSPECTION Normal use Rebuilt CRD ._

18 CRD S/N 3125 5/27 03 16289 INSPECTION Normal use Rebuilt CRD 24 CRD S/N 472f 5/26 03 22789 INSPECTION Normal use Rebuilt CRD 18 CRD S/N 305C 5/23 03 16287 INSPECTION Manufacturing defect Replaced cooling water orifice 39 CRD S/N 792E bolt per GE instructions 5/24 03 16276 INSPECTION Normal use Rebuilt CRD 18 CRD S/N 4595 5/23 23 25743 OPS Packing leak Electrically backseated 1 MOV-15 5/24 23 25746 OPS Packing leak Electrically backseated 1 MOV-15 5/21 66 25718 OPS Piston seperated from Rebuilt piston 130 A0V-100B rod 5/24 71 16266 OPS Normal use Replaced light bulbs 3 1BC-1,2,3,4

POWER AUTHORITY OF THE STATE OF NEW YORK -

JAMES A. FITZPATRICK NUCLEAR POWER PLANT .

MAINTENANCE

SUMMARY

I&C May 1983 WORK REQUEST # CAUSE OF RESULTS OF ACTION TAKEN , REPAIR DATE SYSTEM DUECTED TO PRECLUDE TIME COMPONENT # MALFUNCTION MALFUNCTION RECURRENCE HOURS 5/2/83 02-3 024383 OPS Out of Calibration Reading 15 Inches Recalibrated 4 LIS-58B High Broken Light Light Does Not Replaced Light 2 5/3/83 03 024931 OPS RPIS Work 5/24/83 05 025561 OPS Broken Connector Switch Not Replaced PS-14C Functioning Connector 8 5/1/83 07 024927 OPS Cold Solder Joint Flux Amp Has a ' Resolder Board 19 TIP MACH Non-Zero Output Connections 5/23/83 09 025618 OPS Cold Solder Joint Alarms Spuriously Replaced-Card 4 ANNUN on Card 5/16/83 17 024951 OPS Out of Does Not Read Recalibrated 4 RR-433B Calibration Correctly 5/16/83 23 025613 OPS Screw Hissing Does Not Roll Up Replaced Reel 4 LR-202B the Chart Mount Screw 5/2/83 66 017191 OPS Nozzle Out of Flow Not Proper Realigned Gain 49 DPC-112 Alignment Adj Wheel 5/11/83 71 018958 OPS Rad Protect Mixing Alarms Spuriously Tested ANNUN Sat 4 ANNUN Solution h > _ _ _ _ _ _ .

.t .f

~*

James A. FitzPatrick

,: Nuclear Power Plant P.O. Bon 41 Lycoming, New Wrk 13093 315 342.3840

  1. > NewYorkPbwer 4# Authority June 3, 1983 JAFP 83-0583 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commissi-on Washington, D.C. 20555 Attention: Document Control Desk

Reference:

Docket No. 50-333

Dear Sir:

The Operating Status Report for the month of May, 1983 is enclosed. The refueling information remains the same as previously submitted.

If there are any questions concerning this report, contact John Cook at (315)342-3840, Ext 439.

Very truly yours, N'

CORBIN A. McNEILL, Jr.

l CAM:JPC:rv

! Enclosures i

cc: Internal Distribution l

4 9'

! di l

,o POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE

! MAY, 1983 The unit operated at mear full thermal power for this entire reporting period. On 830514 Power was reduced for Control Rod Withdrawal.

At the end of the reporting period the unit is operating at approxi-mately 743 MWe.