MONTHYEARML22179A2912022-10-27027 October 2022 Withdrawal of Proposed Alternative to Use ASME Code Case N-921 for the Sixth Inservice Inspection Intervals ML22076A2362022-03-23023 March 2022 Acceptance of Requested Licensing Action Amendment to Expand the Use of Prime Methods ML21342A3402021-12-0808 December 2021 Acceptance Review: License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times ML21322A3112021-11-18018 November 2021 Acceptance Review: Quad Cities Units 1 and 2 - License Amendment Request New Fuel Vault Storage and Spent Fuel Pool Criticality Methodologies ML21294A0032021-10-26026 October 2021 Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request Regarding Transition to GNF3 Fuel ML21139A1722021-05-19019 May 2021 Acceptance Review Memo Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Pressure Retaining Bolting Requirements ML21103A0082021-04-12012 April 2021 Acceptance Review (Exemption Request): Dresden Nuclear Power Station, Units 1, 2, and 3-Request for Exemption from Portions of 10 CFR 50.47 and 10 CFR 50, Appendix E ML21105A0002021-04-12012 April 2021 Acceptance Review (LAR)-Dresden Nuclear Power Station, Units 1, 2, and 3, Proposed Changes to the Dresden Nuclear Power Station Emergency Plan and Emergency Action Level Scheme for the Permanently De-fueled Condition ML21077A1772021-04-0808 April 2021 Withdrawal of Requested Exemption from Certain Requirement in 10 CFR 50.55a (Epids L-2021-LLE-0014, 0015, & 0016) ML21081A0222021-03-19019 March 2021 Acceptance Review for Dresden Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation ML20343A1372020-12-0707 December 2020 Acceptance Review Dresden, Units 2 and 3, LAR for Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition ML20317A3112020-10-30030 October 2020 Acceptance of Requested Licensing Action: Certified Fuel Handler Training and Retraining Program ML20295A5572020-10-19019 October 2020 Status of Acceptance Review for Dresden Administrative LAR Dated 9/24/2020 ML19340A0952019-12-0505 December 2019 Rc Acceptance Review Dresden, Units 2 and 3 - Request for Relief (RR-I5R-04, R2) ML19324F4812019-11-20020 November 2019 Increase Allowable MSIV Leakage Rates ML19164A1502019-06-13013 June 2019 Acceptance for Review of Application to Increase Technical Specification Allowable MSIV Leakage Rates and Revise Secondary Containment Surveillance Requirement ML16307A3662016-12-0202 December 2016 Acceptance Review Concerning the Permanent Extension of Type a and Type C Leak Rate Test Frequencies (CAC Nos. MF8387 and MF8388) (Pid L-LA-2016-29559) (RS-16-187) ML16335A0552016-11-30030 November 2016 Acceptance of Requested Licensing Action Concerning Proposed Changes Revise Loss of Voltage Relay Settings (CAC Nos. MF8381 and MF8382) (Pid L-LA-2016-29555) (RS-16-162) ML16320A0202016-11-15015 November 2016 Acceptance Concerning Proposed Changes to Section 5.0 Administrative Controls (CAC Nos. MF8509 and MF8510) (Pid L-LA-2016-0004) (RS-16-201) ML16231A3902016-09-0606 September 2016 Acceptance of Requested Licensing Action Request for Exemption Related to Security Measures in an Emergency or During Severe Weather (CAC MF8275 - MF8278) ML16243A4892016-09-0101 September 2016 Acceptance of Requested Licensing Action Inservice Inspection Interval Proposed Alternative (I5R-08) ML16202A0712016-07-21021 July 2016 Acceptance of Requested Licensing Action Regarding Certified Fuel Handler Training Program ML16048A4552016-02-18018 February 2016 Acceptance Review Concerning Criticality Methodology for Fuel Channel Bow/Bulge (CAC Nos. MF7160 and MF7161)(RS-15-326) ML15149A3852015-06-25025 June 2015 Acceptance of License Amendment Request Regarding Spent Fuel Storage Pool Criticality Methodology and Proposed Change to Technical Specification 4.3.1, Criticality ML1116804112011-06-17017 June 2011 Acceptance Review for Exelon Threshold Determination Request (TAC ME6269 - ME6287) ML1110504592011-04-27027 April 2011 Acceptance Review Amendment Concerning Reactor Coolant System Leakage Instrumentation ML1008800852010-07-21021 July 2010 Fleet - Acceptance Review Implementation of Emergency Action Level Schemes Developed from NEI 99-01m Rev. 5 ML0927900022009-10-0606 October 2009 RCS Leakage Detection Instrumentation - Acceptance Review Results ML0506604352005-03-17017 March 2005 Fuel Amendment Request Acceptance Review 2022-03-23
[Table view] Category:Letter
MONTHYEARIR 05000254/20230042024-02-0505 February 2024 Integrated Inspection Report 05000254/2023004 and 05000265/2023004 IR 05000237/20230042024-02-0202 February 2024 Integrated Inspection Report 05000237/2023004 and 05000249/2023004 IR 05000010/20230012024-01-17017 January 2024 NRC Inspection Report 05000010/2023001 (Drss) ML24004A0052024-01-17017 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0042 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23354A2812024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0031 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) RS-24-001, Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2024-01-0303 January 2024 Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval IR 05000254/20234032023-12-22022 December 2023 Public- Quad Cities Nuclear Power Station Security Baseline Inspection Report 05000254/2023403 and 05000265/2023403 IR 05000254/20230102023-12-20020 December 2023 Comprehensive Engineering Team Inspection Report 05000254/2023010 and 05000265/2023010 ML23349A1622023-12-17017 December 2023 Issuance of Amendment Nos. 298 and 294 Increase Completion Time in Technical Specification 3.8.1.B.4 (Emergency Circumstances) RS-23-128, Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-15015 December 2023 Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days RS-23-123, Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-13013 December 2023 Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23339A1762023-12-0505 December 2023 Notification of NRC Baseline Inspection and Request for Information (05000265/2024001) RS-23-121, Sixth Ten-Year Interval Inservice Testing Program2023-11-30030 November 2023 Sixth Ten-Year Interval Inservice Testing Program SVPLTR 23-0037, Core Operating Limits Report for Cycle 292023-11-29029 November 2023 Core Operating Limits Report for Cycle 29 ML23319A3342023-11-20020 November 2023 Regulatory Audit in Support of License Amendment Requests to Adopt TSTF 505, Revision 2 and 10 CFR 50.69 RS-23-104, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-119, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000254/20230032023-11-0909 November 2023 Integrated Inspection Report 05000254/2023003 and 05000265/2023003 RS-23-107, Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2023-11-0808 November 2023 Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-113, Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 262023-10-20020 October 2023 Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 26 RS-23-102, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-16016 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23285A2342023-10-13013 October 2023 Confirmation of Initial License Examination RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans ML23279A0712023-10-0606 October 2023 Response to NRC Dresden Nuclear Power Station, Units 2 and 3 - Comprehensive Engineering Team Inspection Report 05000237/2023011 and 05000249/2023011 ML23269A0662023-09-28028 September 2023 Proposed Alternative Request RV-23H Associated with the Sixth 10-Year Inservice Testing Interval ML23265A1322023-09-27027 September 2023 Proposed Alternative Request RV-03 Associated with the Sixth 10-Year Inservice Testing Interval ML23206A0382023-09-21021 September 2023 Proposed Alternative to the Requirements of the ASME Code IR 05000254/20230112023-09-20020 September 2023 Safety-Conscious Work Environment Issue of Concern Team Inspection Report 05000254/2023011 and 05000265/2023011 ML23205A1362023-09-20020 September 2023 Proposed Alternative Request RV-02D Associated with the Sixth IST Interval IR 05000237/20230112023-09-0606 September 2023 Comprehensive Engineering Team Inspection Report 05000237/2023011 and 05000249/2023011 RS-23-089, Sixth Ten-Year Interval Inservice Testing Program2023-09-0505 September 2023 Sixth Ten-Year Interval Inservice Testing Program RS-23-071, Application to Adopt TSTF-564, Safety Limit MCPR2023-08-30030 August 2023 Application to Adopt TSTF-564, Safety Limit MCPR RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs IR 05000237/20234022023-08-29029 August 2023 Security Baseline Inspection Report 05000237/2023402 and 05000249/2023402 RS-23-086, Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2023-08-28028 August 2023 Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval SVP-23-038, Owner'S Activity Report Submittal Fifth 10-Year Interval 2023 Refueling Outage Activities2023-08-14014 August 2023 Owner'S Activity Report Submittal Fifth 10-Year Interval 2023 Refueling Outage Activities IR 05000254/20230022023-08-0808 August 2023 Integrated Inspection Report 05000254/2023002 and 05000265/2023002 IR 05000237/20230022023-08-0808 August 2023 Integrated Inspection Report 05000237/2023002 and 05000249/2023002 ML23178A0742023-08-0707 August 2023 Issuance of Amendment Nos. 296 and 292 Adoption of TSTF-416 Low Pressure Coolant Injection (LPCI) Valve Alignment Verification Note Location ML23216A0362023-08-0707 August 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI ML23216A0562023-08-0404 August 2023 Information Meeting (Open House) with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Quad Cities Nuclear Power Station, Units 1 and 2 ML23174A1502023-08-0303 August 2023 Issuance of Amendment Nos. 282 and 275 Control Rod Scram Times ML23212A9892023-08-0303 August 2023 Subsequent License Renewal Application Public Meeting Summary of Pre-Submittal Meeting ML23193A0052023-07-28028 July 2023 Subsequent License Renewal Application Public Meeting Summary of Pre-Submittal Meeting SVP-23-031, Regulatory Commitment Change Summary Report2023-07-14014 July 2023 Regulatory Commitment Change Summary Report 2024-02-05
[Table view] |
Text
October 27, 2022 Mr. David P. Rhoades Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3, AND QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 WITHDRAWAL OF PROPOSED ALTERNATIVE TO USE ASME CODE CASE N-921 FOR THE SIXTH INSERVICE INSPECTION INTERVALS (EPID L-2022-LLR-0051)
Dear Mr. Rhoades:
By letter dated June 9, 2022 (Agencywide Documents Access and Management System Accession No. ML22160A087), Constellation Energy Generation, LLC (the licensee) submitted an application in accordance with paragraph 50.55a(z)(1) of Title 10 of the Code of Federal Regulations (10 CFR) for a proposed alternative to certain requirements of 10 CFR 50.55a, Codes and standards, for Dresden Nuclear Power Station, Units 2 and 3 (Dresden), and Quad Cities Nuclear Power Station, Units 1 and 2 (Quad Cities). Specifically, the licensee requests an alternative to requirements in Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (BPV Code) and 10 CFR 50.55a(b)(5)(ii), (b)(5)(iii),
(g)(4)(ii), (g)(5)(i), (g)(5)(iii), and (g)(5)(iv) for the sixth inservice inspection (ISI) intervals at Dresden and Quad Cities. The sixth ISI interval at Dresden is scheduled to start on January 20, 2023, and end on January 19, 2033, and the sixth ISI interval at Quad Cities is scheduled to start on April 2, 2023, and end on April 1, 2033. The application states that, in accordance with 10 CFR 50.55a(z)(1), the proposed alternative would provide an acceptable level of quality and safety.
The regulations in 10 CFR 50.55a include, in part, requirements for the use of Section XI of the ASME BPV Code for the ISI of nuclear power plants. Specific editions and addenda of the ASME Codes have been incorporated by reference into 10 CFR 50.55a, subject to certain limitations.Section XI of the ASME BPV Code requires certain inservice examinations and tests to be completed within a defined 10-year interval for the service life of the plant. A certain percentage of these inservice examinations and tests must be completed in each of the three inspection periods that make up the 10-year ISI interval. In lieu of these requirements, the proposed alternative would, in part, allow the licensee to use the ASME Code Case N-921, Alternative 12-yr [Year] Inspection Interval Duration. This would extend the sixth ISI intervals at Dresden and Quad Cities by 2 years and revise the schedule for the three inspection periods within the sixth ISI intervals.
D. Rhoades Paragraph 10 CFR 50.55a(g)(4)(ii) requires, in part, that inservice examination of components and system pressure tests conducted during successive 120-month (i.e., 10-year) inspection intervals must comply with the latest edition and addenda of the ASME Code incorporated by reference in 10 CFR 50.55a(a) 18 months before the start of the 120-month inspection interval (or the optional ASME Code Cases as specified in 10 CFR 50.55a(g)(4)(ii)) subject to the conditions listed in 10 CFR 50.55a(b). As an alternative to this requirement, the licensee proposes to revise the interval from 120 months to 144 months (i.e., 12 years) such that the ASME Code update would align with the end of the extended sixth ISI intervals at Dresden and Quad Cities. The regulations in 10 CFR 50.55a(b)(5)(ii), (b)(5)(iii), (g)(5)(i), (g)(5)(iii), and (g)(5)(iv) are also tied to the 120-month update requirement or to the 10-year ISI interval. The proposed alternative would also allow the licensee to comply with these requirements on a 144-month interval instead of a 120-month interval to align with the proposed 12-year ISI intervals.
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC or Commission) staffs acceptance review of this application. The NRC staff performed the acceptance review in accordance with the Office of Nuclear Reactor Regulation Office Instruction LIC-109, Revision 3, Acceptance Review Procedures for Licensing Basis Changes (ML20036C829). The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing bases of the plants.
The guidance in LIC-109, Revision 3, states, in part, that: It should be noted that the generic use of a Code Case that has received final approval by the ASME and is currently under review by the NRC, shall not be accepted for review. This avoids inefficiencies by preventing the NRC staff from expending resources to review the same issue in two separate processes. The ASME Code Case N-921 was approved by the ASME on September 28, 2021, and the NRC staff is currently considering rulemaking to allow its generic use by power reactor licensees. The NRC staff considers rulemaking to be the best approach for considering the use of Code Case N-921 because the rulemaking process allows the staff to consider the views of the broader industry and other stakeholders.
Further, in SECY-21-0029, Rulemaking Plan on Revision of Inservice Testing and Inservice Inspection Program Update Frequencies Required in 10 CFR 50.55a, dated March 15, 2021 (ML20273A286), the NRC staff stated, among other things, that:
Because the NRC specifies the 120-month IST and ISI program update interval in 10 CFR 50.55a, conducting rulemaking is the only option to address this regulatory issue. Developing new regulatory guidance or updating current regulatory guidance would not be a viable option to implement a change to this requirement.
Prior to the completion of this rulemaking process, the staff anticipates that some licensees may submit requests for exemptions to the requirements to update IST and ISI programs every 120 months. Staff will consider the merits of such requests on a case-by-case basis.
The Commission approved the NRC staffs recommendations in SECY-21-0029 in a staff requirements memorandum dated November 8, 2021 (ML21312A490).
D. Rhoades Therefore, in accordance with LIC-109, Revision 3, the NRC staff informed the licensee via telephone call on October 18, 2022, that the June 9, 2022, application would not be accepted for review for the reasons discussed above. Subsequently, by letter dated October 27, 2022 (ML22300A111), the licensee requested to withdraw the application. The NRC staff acknowledges the licensees request to withdraw the application. The NRC staff activities associated with the review have ceased and the associated EPID L-2022-LLR-0051 has been closed.
If you have any questions, please contact Scott Wall at 301-415-2855 or Scott.Wall@nrc.gov.
Sincerely,
/RA by Blake Purnell for/
Scott P. Wall, Senior Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-237, 50-249, 50-254, and 50-265 cc: Listserv
ML22179A291 OFFICE DORL/LPL3/PM DORL/LPL3/LA DNRL/NVIB/BC DNRL/NPHP/BC NAME BPurnell SRohrer ABuford MMitchell DATE 10/14/22 6/28/2022 10/17/22 10/14/22 OFFICE OGC - NLO DORL/LPL3/BC DNRL/DD DORL/D NAME MASpencer NSalgado (SWall for) BThomson BPham DATE 10/14/22 10/27/22 10/17/22 10/18/22 OFFICE DORL/LPL3/PM NAME SWall (BPurnell for)