PLA-3704, Sumbits Schedule to Address Requirements of Section 3.9 of ERDS Implementation Plan,Per NUREG-1394,Rev 1.Data Point Library Will Be Provided by 920205.Preliminary Transmission Testing Will Be Ready for Unit 1 on 920803

From kanterella
Revision as of 17:37, 25 September 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Sumbits Schedule to Address Requirements of Section 3.9 of ERDS Implementation Plan,Per NUREG-1394,Rev 1.Data Point Library Will Be Provided by 920205.Preliminary Transmission Testing Will Be Ready for Unit 1 on 920803
ML20086P728
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 12/20/1991
From: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
To: Chris Miller
Office of Nuclear Reactor Regulation
References
RTR-NUREG-1394 PLA-3704, NUDOCS 9112270170
Download: ML20086P728 (2)


Text

. . .- .- . _ _ _ . __ _ _

~

.. % A %

+ i. , Qj Pennsylvania Power & Light Company Two North Ninth Street

  • AHentown, PA 18101-1179 a 215/774-5151

- Harold W,. Keiser - '

, Senior Vice President-Nucleat -

215/774-4194 DEC 201991  ;

- Director of Nuclear Reactor Regulation . -

Attention: Mr. C. L. Miller, Project Director

~ Project Directorate I-2 -

Division of Reactor Projects -

U.S. Nucicar Regulatory Commission Washington, D.C. 20555 SUSQUEllANNA STEAM ELECTRIC STATION

- ERDS IMPLEMENTATION PLAN Docket Nos. 50-387 PLA 1704 FILE R41-ID. R41-2 and 50-388

Reference:

PLA 3672, October 24,1991, Emergency Response Data System Implementation.

Dear Mr. Miller:

'The following Wdule information is being provided to address the requirements of Section 3.9,

- ERDS Implemernation Plan of NUREG-1394,' Rev.1. Eacn of the activities listed below references tiie corresponding step in L Appendix A,- Emergency Response Data - System -

Transmission / Reception Plan, of NUREG-1394. .

PP&Il' w ill provide the Data Point Library (step 5, page A-3) for Unit 1 '& Unit 2 by February 15,1992.. We will be ready for preliminary transmission testing (step 8, page A-3) for the Unit .

1 ERDS on August 3,1992.' We will be ready for the formal system test (step 9, page A-3) for-Unit 2 on October 5,1992.' Please note, we believe the preliminary transmission testing step E will not be required for Unit 2 due to the work previously performed for Unit 1.

In order for PP&L to achieve the August 3,1992 date for preliminary transmission testing we will need the NRC to provide the phone lines (step 4, Page A-2) and modems (step 7, page A-3) -

by July 20,1992. -Since PP&L is planning to use the Multiple Input / Multiple ERDS Send

? System developed by Halliburton NUS Environmental Corp, we will need the NRC to provide

, the PC ERDS intcrface software by July 6,1992 (ref. item 15, page J-3 of Appendix J).

l' 9112270170 9i1220 l PDR ADOCK-05000387

~

'F PDR

.y .n e . ... . . .. . - . - - - - . . - - . - - - - . .-...- - . -

.;-;f;15u.- = . .

FILES R41 ID, R412 PLA 3704 Mr. C. L. Miller e t)

- Should you have any questions, pleas: call W. W. Williams at 215-774-7910.

LVery truly yours, ,

x. ,

H. W ' Keiser e

-cc: . NIMlasipummep4SE!-tDesis desiginalpa NRC Region I-

- Mr. G. S. Barber, NRC Sr. Resident Inspector'-

g ,

Mr. J. S. Raleigh, NRC Project Manager K