Letter Sequence Withholding Request Acceptance |
---|
|
|
MONTHYEARNOC-AE-19003684, Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Essential Cooling Water (Ecw) System Class 3 Buried Piping in Accordance with 10 CFR 50.55a(z)(1)2019-09-26026 September 2019 Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Essential Cooling Water (Ecw) System Class 3 Buried Piping in Accordance with 10 CFR 50.55a(z)(1) Project stage: Request NOC-AE-19003677, License Amendment Request to Revise Technical Specifications to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec.2019-09-26026 September 2019 License Amendment Request to Revise Technical Specifications to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec. Project stage: Request ML19309F1412019-11-0404 November 2019 Supplemental Information Request - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping (EPID L 2019-LLR-0096) (Draft) Project stage: Draft Other ML19312A0962019-11-13013 November 2019 Supplemental Information Needed for Acceptance of Requested Licensing Action Proposed Alternative to ASME Requirements for Repair of Essential Cooling Water Class 3 Buried Piping Project stage: Acceptance Review NOC-AE-19003696, Supplemental Information for Proposed Alternative to ASME Code Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) EPID: L 2019-LLR-0096)2019-11-26026 November 2019 Supplemental Information for Proposed Alternative to ASME Code Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) EPID: L 2019-LLR-0096) Project stage: Supplement ML19344A0092019-12-0909 December 2019 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping Project stage: Acceptance Review ML20036F5862020-02-0404 February 2020 Request for Additional Information - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping (EPID L-2019-LLR-0096)Redacted Project stage: RAI NOC-AE-20003716, Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping2020-03-0909 March 2020 Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping Project stage: Request ML20069L4992020-03-0909 March 2020 Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping Project stage: Request NL-20-039, (04/29/2020) E-mail from R. Gaston to R. Guzman, Exemption Request from Requirements of 10 CFR Part 73, Appendix B, Section VI, Subsection C.3.(l)(1)2020-04-29029 April 2020 (04/29/2020) E-mail from R. Gaston to R. Guzman, Exemption Request from Requirements of 10 CFR Part 73, Appendix B, Section VI, Subsection C.3.(l)(1) Project stage: Other ML20128J8432020-05-15015 May 2020 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML20142A5202020-05-21021 May 2020 Exemption Request Due to COVID-19 Pandemic Project stage: Other NL-20-0620, SNC Requests a Temporary Exemption from the Quarterly Fire Brigade Drills and Annual Live Fire Fighting Training Requirements of the Regulation2020-05-22022 May 2020 SNC Requests a Temporary Exemption from the Quarterly Fire Brigade Drills and Annual Live Fire Fighting Training Requirements of the Regulation Project stage: Other NL-20-0640, Response to Request for Additional Information for Exemption Request2020-05-27027 May 2020 Response to Request for Additional Information for Exemption Request Project stage: Response to RAI ULNRC-06587, Supplement to Security Training Exemption Request Due to COVID-192020-06-17017 June 2020 Supplement to Security Training Exemption Request Due to COVID-19 Project stage: Supplement NOC-AE-20003749, Response to Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24)2020-07-15015 July 2020 Response to Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) Project stage: Response to RAI ML20197A2612020-07-15015 July 2020 Response to Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) Project stage: Response to RAI ML20177A6452020-07-15015 July 2020 FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for June 2020 Project stage: Approval ML20212L5682020-07-30030 July 2020 Supplement to Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) Project stage: Supplement NOC-AE-20003755, Supplement to Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24)2020-07-30030 July 2020 Supplement to Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) Project stage: Supplement ML20232D1442020-08-26026 August 2020 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML20227A3852020-09-0303 September 2020 Nonproprietary - Proposed Alternative RR-ENG-3-24 to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping Project stage: Other 2020-05-15
[Table View] |
|
---|
Category:Letter
MONTHYEARML24304B0512024-10-30030 October 2024 Cycle 26 Core Operating Limits Report IR 05000498/20244022024-10-23023 October 2024 Security Baseline Inspection Report 05000498/2024402 and 05000499/2024402 05000499/LER-2024-003, Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function2024-10-22022 October 2024 Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function ML24295A0772024-10-21021 October 2024 Licensed Operator Positive Fitness-for-Duty Test 05000499/LER-2024-002, Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-10-17017 October 2024 Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24290A1162024-10-16016 October 2024 Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan ML24255A0322024-09-30030 September 2024 The Associated Independent Spent Fuel Storage Installation - Notice of Consideration of Approval of Direct Transfer of Licenses and Opportunity to Request a Hearing (EPID L-2024-LLM-0002) - Letter ML24269A1762024-09-25025 September 2024 Tpdes Permit Renewal Application WQ0001 908000 05000498/LER-2024-004, Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps2024-09-19019 September 2024 Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps ML24271A3022024-09-18018 September 2024 STP-2024-09 Post-Exam Comments - Redacted ML24274A0902024-09-16016 September 2024 Written Response - EA-24-026 STP Operator - Redacted ML24250A1882024-09-11011 September 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal 05000499/LER-2024-001-01, Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-08-29029 August 2024 Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators IR 05000498/20240052024-08-22022 August 2024 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2024005 and 05000499/2024005) IR 05000498/20240022024-08-0909 August 2024 Integrated Inspection Report 05000498/2024002 and 05000499/2024002 IR 05000498/20240102024-08-0808 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000498/2024010 and 05000499/2024010 ML24218A1462024-07-26026 July 2024 2. EPA Comments on South Texas Project Exemption Ea/Fonsi ML24207A1782024-07-25025 July 2024 Licensed Operator Positive Fitness-For-Duty Test 05000499/LER-2024-001, Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-07-0202 July 2024 Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators 05000498/LER-2024-003, Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump2024-07-0101 July 2024 Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump 05000498/LER-2024-002-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-27027 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function 05000498/LER-2023-003-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-19019 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24137A0882024-05-15015 May 2024 Operator Licensinq Examination Schedule Revision 3 ML24136A2872024-05-15015 May 2024 Submittal of 2024 Nrc/Fema Evaluated Exercise Scenario Manual ML24136A2842024-05-15015 May 2024 Independent Spent Fuel Storage Installation Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance ML24130A2712024-05-0909 May 2024 Re Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24128A1572024-05-0707 May 2024 Independent Spent Fuel Storage Installation Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance IR 05000498/20240012024-05-0606 May 2024 Integrated Inspection Report 05000498/2024001 & 05000499/2024001 ML24120A3762024-04-29029 April 2024 Annual Dose Report for 2023 ML24116A3032024-04-25025 April 2024 Operations Quality Assurance Plan Condition Adverse to Quality Definition Change Resulting in a Reduction in Commitment ML24116A2282024-04-25025 April 2024 Annual Environmental Operating Report 05000498/LER-2023-004-01, Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water2024-04-25025 April 2024 Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water ML24117A1602024-04-24024 April 2024 2023 Radioactive Effluent Release Report ML24102A2452024-04-23023 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0046 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24113A3122024-04-22022 April 2024 Cycle 24 Core Operating Limits Report ML24097A0072024-04-0606 April 2024 Relief Request Number RR-ENG-4-07 – Request for an Alternative to ASME Code Case N-729-6 for Reactor Vessel Head Penetration 75 05000498/LER-2024-001, Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-04-0101 April 2024 Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24088A3022024-03-28028 March 2024 Financial Assurance for Decommissioning - 2024 Update ML24081A3972024-03-21021 March 2024 Response to Request for Additional Information for Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24080A2902024-03-19019 March 2024 Nuclear Liability Certificates of Insurance NOC-AE-240040, Nuclear Liability Certificates of Insurance2024-03-19019 March 2024 Nuclear Liability Certificates of Insurance ML24066A2002024-03-0606 March 2024 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes ML24079A1312024-03-0505 March 2024 Nuclear Insurance Protection ML24060A1742024-02-28028 February 2024 Submittal of Annual Fitness for Duty Performance Report for 2023 IR 05000498/20230062024-02-28028 February 2024 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023006 and 05000499/2023006) IR 05000498/20240132024-02-27027 February 2024 Design Basis Assurance Inspection (Programs) Commercial Grade Dedication IR 05000498/2024013 and 05000499/2024013 ML24022A2252024-02-20020 February 2024 Issuance of Amendment Nos. 227 and 212 to Authorize the Revision of the Alternative Source Term Dose Calculation ML24050A0082024-02-19019 February 2024 Evidence of Financial Protection ML24045A0922024-02-16016 February 2024 Response to STP FOF Move Letter (2024) 2024-09-30
[Table view] Category:Proprietary Information Review
MONTHYEARML23198A0532023-07-24024 July 2023 Request for Withholding Information from Public Disclosure ML20232D1442020-08-26026 August 2020 Request for Withholding Information from Public Disclosure ML20128J8432020-05-15015 May 2020 Request for Withholding Information from Public Disclosure ML20059G6782020-03-0404 March 2020 Request for Withholding Information from Public Disclosure, Affidavit Date January 27, 2020, Executed by Mr. Korey L. Hosack ML16194A2342016-07-21021 July 2016 Request for Withholding Information from Public Disclosure - 5/6/16 Affidavit Executed by D. Munoz and M. Rozboril, Alion Science and Technology, Response to Follow-up RAIs 18, 38, and 44 ML16117A3222016-05-0404 May 2016 Request for Withholding Information from Public Disclosure - 3/2/16 Affidavit Executed by J. Gresham, Westinghouse, LTR-PAFM-16-11-P, Rev. 0, Related to Relief Request, Use of ASME Code Case N-770-1 ML15205A0512015-08-10010 August 2015 Request for Withholding Information from Public Disclosure, 4/22/15 Affidavit Executed by J. Gresham, Westinghouse LTR-PAFM-15-27-P Provided in Support of Relief Request RR-ENG-3-17, Relief from Code Case N-770-1 ML14290A2002014-11-13013 November 2014 Request for Withholding Information from Public Disclosure, 8/4/14 Affidavit Executed by E. Hauser, Cameron International, Caldon Ultrasonic Technology Center Engineering Report ER-1060, Revision 1 ML14290A2212014-11-13013 November 2014 Request for Withholding Information from Public Disclosure, 8/4/14 Affidavit Executed by E. Hauser, Cameron International, Caldon Ultrasonic Technology Center Engineering Report ER-1059, Revision 1 ML14092A5572014-06-0404 June 2014 Request for Withholding Information from Public Disclosure - 2/10/14 Affidavit Executed by M. Stachowiak, Alion Science and Technology; Casa Grande Computer Codes and Input; GSI-191 Amendment and Exemption Requests ML14091A4522014-04-0808 April 2014 Request for Withholding Information from Public Disclosure - 12/9/13 G. Powell, STPNOC Affidavit Enclosing RELAP5 Digital Media Related to GSI-191 License Amendment and Exemption Requests ML0907103302009-04-30030 April 2009 Corp., Request for Withholding Information from Public Disclosure ML0721408812007-08-14014 August 2007 Request for Withholding Information from Public Disclosure - Attachment 2A to 5/3/07 Application and Attachment 2A to 7/20/07 Supplement - Order Approving Indirect Transfer of Control of Licenses (TAC MD5656 & MD5657) ML0529404712005-10-27027 October 2005 S.Texas, Texas Genco GP, LLC and Nrg Energy, Inc.- Request for Withholding Information from Public Disclosure ML0505900472005-03-0808 March 2005 Texas Genco LLC and Texas Genco LP - Withholding from Public Disclosure, Information in Attachment 7C (Proprietary), to the February 23, 2005 Letter ML0502403512005-02-0909 February 2005 Westinghouse, Withholding from Public Disclosure, Attachment 1 to South Texas, Units 1 & 2, Concerning a Change in Analytical Methodology, MC0759 & MC0760 ML0435200182004-12-30030 December 2004 Texas Genco LLC and Texas Genco LP, Withholding from Public Disclosure, Attachments to Letter Dated December 13, 2004, for South Texas, Units 1 and 2 ML0433703672004-12-13013 December 2004 Westinghouse Electric Co, Withholding from Public Disclosure, for South Texas Project Unit 1, Response to RAI - Attachment 1 to October 6, 2004, Letter & Response to RAI - Attachment 1 to November 30, 2004 Letter Re a Change in Analytical M ML0431706412004-11-0909 November 2004 Request for Withholding Information from Public Disclosure by Letter Dated October 12, 2004 ML0418403042004-07-0101 July 2004 Westinghouse, Withholding from Public Disclosure, Request for Exemption from Provisions of 10 CFR 50.44, 10 CFR 50.46, & 10 CFR 50 Appendix K for Eight Lead Test Assemblies (Ltas) & Supporting Justification for South Texas Project Optimized ML0416103372004-06-0808 June 2004 Cameco Corp., Request for Withholding Information from Public Disclosure for S. Texas, Units 1 and 2. (TAC MC2880 & MC2881) ML0415507822004-06-0303 June 2004 Application for Withholding Proprietary Information from Public Disclosure NOC-AE-04001727, Application for Withholding Proprietary Information from Public Disclosure2004-05-12012 May 2004 Application for Withholding Proprietary Information from Public Disclosure ML0334603172003-12-12012 December 2003 Request for Withholding Information from Public Disclosure Per Section 2.790 ML0322601572003-08-14014 August 2003 Withholding from Public Disclosure, Westinghouse Field Service Procedure STD-FP-1998-8202, Rev Figure 6.1, MB8435 ML0210101602002-04-25025 April 2002 Withholding Ltr, Affidavit Dated June 21, 2001 Concerning 1.4 Percent Power Uprate (CAW-01-1466) (Tac Nos MB2899 and MB2903) ML0210007032002-04-25025 April 2002 Withholding Ltr, 10 CFR 2.790 Concerning 1.4 Percent Power Uprate (Tac Nos MB2899 and MB2903) 2023-07-24
[Table view] |
Text
May 15, 2020 Mr. G. T. Powell President and CEO STP Nuclear Operating Company South Texas Project P.O. Box 289 Wadsworth, TX 77483
SUBJECT:
SOUTH TEXAS PROJECT, UNITS 1 AND 2 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (EPID L-2019-LLR-0096)
Dear Mr. Powell:
By letters dated September 26, 2019, and March 9, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML19274C393 and ML20069L499, respectively), you submitted affidavits executed by Scott Greenhaus from Structural Group, Inc.
(SGI) dated September 11, 2019, and March 3, 2020, and Rasko P. Ojdrovic from Simpson Gumpertz and Heger Inc. (SGH), dated September 17, 2019, and March 3, 2020, which combined, requested that the information from the following documents (contained in Enclosures 1 and 4-9 of your September 26, 2019, letter and Enclosure 1 of your March 9, 2020, letter) be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390:
Enclosures 1, 4, 5, 6, 7, 8, & 9: Proposed Alternative to ASME [American Society of Mechanical Engineers] Boiler & Pressure Vessel Code Section Xl Requirements for Repair/Replacement of Essential Cooling Water (ECW)
System Class 3 Buried Piping in accordance with 10 CFR 50.55a(z)(1) (Relief Request RR-ENG-3-24)
Enclosure 1: Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24)
(EPID: L-2019-LLR-0096)
Nonproprietary copies of Enclosure 1 contained in Enclosure 11 of the letter dated September 26, 2019, and Enclosure 1 contained in Enclosure 2 of the letter dated March 9, 2020, have been placed in the U.S. Nuclear Regulatory Commissions (NRC) Public Document Room and added to the NRC Library in ADAMS at the above-referenced Accession Nos. ML19274C393 and ML20069L499.
The SGI affidavits stated, in part, that the information should be considered exempt from mandatory public disclosure for the following reasons:
The information sought to be withheld from public disclosure is owned by and has been held in confidence by SGI.
G. Powell 1) The SGI plan to sell the use of this information to their customers for the purpose of installing Carbon Fiber Reinforced Polymer (CFRP) in safety related piping.
- 2) That SGI can self- [sell] support and defense of the technology to their customers in the licensing process.
- 3) The information requested to be withheld reveals the distinguishing aspects of a methodology which was developed by SGI.
- 4) Public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of SGI because it would enhance the ability of competitors to provide similar licensing services for commercial power reactors without commensurate expenses.
- 5) Public disclosure of the information would enable others to use the information to meet NRC requirements for licensing documentation without purchasing the right to use the information.
- 6) The development of the technology described in part by the proprietary information is the result of applying the results of many years of experience in an intensive effort by SGI and the expenditure of a considerable sum of money and resources. In order for competitors to duplicate this information, similar technical programs would have to be performed including a significant expenditure [of] money and resources.
The SGH affidavits stated, in part, that the information should be considered exempt from mandatory public disclosure for the following reasons:
- i. This information is and has been held in confidence by SGH.
ii. This information is of a type that is customarily held in confidence by SGH, and there is a rational basis for doing so because the information includes proprietary information that was developed and compiled by SGH at a significant cost to SGH. This information is classified as proprietary because it contains information relevant to analytical approaches and methodologies not available elsewhere.
iii. The information is being transmitted to the NRC voluntarily and in confidence.
iv. This information is not available in public sources and could not be gathered readily from other publicly available information.
- v. A substantial effort has been expended by SGH to develop and evaluate this information. Public release of this information could lead to additional significant cost to SGH and is likely to cause substantial harm to SGH's competitive position and foreclose or reduce the availability of profit-making opportunities. The value of this information to SGH would be lost or devalued if the information were disclosed to the public.
G. Powell vi. Public disclosure of the information sought to be withheld would provide other parties, including competitors, with valuable information. SGH's competitive advantage would be lost if its competitors are able to use the results of SGH's activities to aid their own commercial activities. For example, SGH's competitive advantage would be lost if its competitors are able to use the results of SGH's analyses to normalize or verify their own process or if they are able to claim an equivalent understanding by demonstrating that they can arrive at the same or similar conclusions.
Making such information available to competitors without [them] having been required to undertake a similar expenditure of resources would unfairly provide competitors with a windfall, and deprive SGH of the opportunity to exercise its competitive advantage to seek an adequate return on its large investment.
vii. The commercial value of the information extends beyond the original development cost and includes development of the expertise to determine and apply the appropriate evaluation process to the information. The research, development, engineering, and analytical costs that went into generating this information comprise a substantial investment of time and money by SGH. The precise value of this information is difficult to quantify, but clearly is substantial.
We have reviewed the application and material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. In addition, we have determined that Enclosures 4-9 of your September 26, 2019, letter contain extensive proprietary information to an extent that a non-proprietary (i.e., redacted) version would be of no value to the public.
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
G. Powell If you have any questions, please contact me at 301-415-6256 or via e-mail at Dennis.Galvin@nrc.gov.
Sincerely,
/RA/
Dennis J. Galvin, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499 cc: Scott Greenhaus Executive Vice President, Structural Group, Inc.
10150 Old Columbia Road Columbia, MD 21046 Mr. Rasko P. Ojdrovic Vice President and Senior Principal Simpson Gumpertz & Heger 480 Totten Pond Road Waltham, MA 02451 Listserv
ML20128J843
- by e-mail OFFICE NRR/DORL/LPL4/PM NRR/DORL/LPL4/LA* NRR/DNRL/NPHP/BC*
NAME DGalvin PBlechman MMitchell DATE 05/12/2020 05/12/2020 05/08/2020 OFFICE NRR/DEX/EMIB/BC(A)* NRR/DORL/LPL4/BC* NRR/DORL/LPL4/PM NAME TScarbrough JDixon-Herrity DGalvin DATE 05/07/2020 05/12/2020 05/15/2020