Letter Sequence Withholding Request Acceptance |
---|
|
|
MONTHYEARML13302C2072013-11-0606 November 2013 Schedule Revision for the Review of the Davis-Besse Nuclear Power Station License Renewal Application (TAC ME4613 and ME4640) Project stage: Approval ML14260A4382014-08-31031 August 2014 Engineering Report ER-1059, Rev. 1, Bounding Uncertainty Analysis for Thermal Power Determination at South Texas Project Units 1 & 2 Using LEFM System. Project stage: Request NOC-AE-14003161, Engineering Report 1060, Rev. 1, Meter Factor Calculation & Accuracy Assessment for South Texas Project Units 1 & 2.2014-08-31031 August 2014 Engineering Report 1060, Rev. 1, Meter Factor Calculation & Accuracy Assessment for South Texas Project Units 1 & 2. Project stage: Request ML14269A1662014-09-25025 September 2014 NRR E-mail Capture - Acceptance of Application - LAR for Rev to (TS) 6.9.1.6, Core Operating Limit Report (Colr), at South Texas Project, Units 1 and 2 (TAC Nos. MF4639 and 4640) Project stage: Acceptance Review ML14290A2212014-11-13013 November 2014 Request for Withholding Information from Public Disclosure, 8/4/14 Affidavit Executed by E. Hauser, Cameron International, Caldon Ultrasonic Technology Center Engineering Report ER-1059, Revision 1 Project stage: Withholding Request Acceptance ML14290A2002014-11-13013 November 2014 Request for Withholding Information from Public Disclosure, 8/4/14 Affidavit Executed by E. Hauser, Cameron International, Caldon Ultrasonic Technology Center Engineering Report ER-1060, Revision 1 Project stage: Withholding Request Acceptance ML14336A0032014-12-0101 December 2014 NRR E-mail Capture - Request for Additional Information (RAI) - License Amendment Request for Revision to Technical Specification 6.9.1.6 (TACs MF4639 and MF4640) Project stage: RAI NOC-AE-14003204, Response to Request for Additional Information Regarding License Amendment Request - Proposed Revision to Administrative Controls Technical Specification 6.9.1.6, Core Operating Limits Report (COLR)2014-12-18018 December 2014 Response to Request for Additional Information Regarding License Amendment Request - Proposed Revision to Administrative Controls Technical Specification 6.9.1.6, Core Operating Limits Report (COLR) Project stage: Response to RAI ML15049A1292015-02-27027 February 2015 Issuance of Amendment Nos. 204 and 192, Revise Technical Specification 6.9.1.6, Core Operating Limits Report, with Respect to Analytical Methods Used to Determine Core Operating Limits Project stage: Approval 2014-12-18
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000498/20244022024-10-23023 October 2024 Security Baseline Inspection Report 05000498/2024402 and 05000499/2024402 05000499/LER-2024-003, Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function2024-10-22022 October 2024 Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function ML24295A0772024-10-21021 October 2024 Licensed Operator Positive Fitness-for-Duty Test 05000499/LER-2024-002, Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-10-17017 October 2024 Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function NOC-AE-240040, Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan2024-10-16016 October 2024 Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan IR 05000498/20243012024-10-0707 October 2024 NRC Examination Report 05000498/2024301 and 05000499/2024301 ML24255A0322024-09-30030 September 2024 The Associated Independent Spent Fuel Storage Installation - Notice of Consideration of Approval of Direct Transfer of Licenses and Opportunity to Request a Hearing (EPID L-2024-LLM-0002) - Letter ML24269A1762024-09-25025 September 2024 Tpdes Permit Renewal Application WQ0001 908000 05000498/LER-2024-004, Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps2024-09-19019 September 2024 Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps ML24271A3022024-09-18018 September 2024 STP-2024-09 Post-Exam Comments - Redacted ML24274A0902024-09-16016 September 2024 Written Response - EA-24-026 STP Operator - Redacted ML24250A1882024-09-11011 September 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal ML24249A3372024-09-0404 September 2024 Inservice Inspection Summary Report - 2RE23 05000499/LER-2024-001-01, Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-08-29029 August 2024 Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators ML24234A0912024-08-27027 August 2024 NRC Initial Operator Licensing Examination Approval 05000498/2024301; 05000499/2024301 IR 05000498/20240052024-08-22022 August 2024 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2024005 and 05000499/2024005) IR 05000498/20240022024-08-0909 August 2024 Integrated Inspection Report 05000498/2024002 and 05000499/2024002 IR 05000498/20240102024-08-0808 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000498/2024010 and 05000499/2024010 ML24213A0842024-07-31031 July 2024 Application for Order Consenting to Direct Transfer of Licenses ML24218A1462024-07-26026 July 2024 2. EPA Comments on South Texas Project Exemption Ea/Fonsi ML24207A1782024-07-25025 July 2024 Licensed Operator Positive Fitness-For-Duty Test 05000499/LER-2024-001, Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-07-0202 July 2024 Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators 05000498/LER-2024-003, Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump2024-07-0101 July 2024 Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump 05000498/LER-2024-002-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-27027 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function 05000498/LER-2023-003-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-19019 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function IR 05000498/20244042024-06-0303 June 2024 Cyber Security Inspection Report 05000498/2024404 (Cover Letter) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2872024-05-15015 May 2024 Submittal of 2024 Nrc/Fema Evaluated Exercise Scenario Manual ML24136A2842024-05-15015 May 2024 Independent Spent Fuel Storage Installation Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance ML24137A0882024-05-15015 May 2024 Operator Licensinq Examination Schedule Revision 3 ML24130A2712024-05-0909 May 2024 Re Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24128A1572024-05-0707 May 2024 Independent Spent Fuel Storage Installation Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance IR 05000498/20240012024-05-0606 May 2024 Integrated Inspection Report 05000498/2024001 & 05000499/2024001 ML24120A3762024-04-29029 April 2024 Annual Dose Report for 2023 ML24116A2282024-04-25025 April 2024 Annual Environmental Operating Report 05000498/LER-2023-004-01, Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water2024-04-25025 April 2024 Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water ML24116A3032024-04-25025 April 2024 Operations Quality Assurance Plan Condition Adverse to Quality Definition Change Resulting in a Reduction in Commitment ML24117A1602024-04-24024 April 2024 2023 Radioactive Effluent Release Report ML24102A2452024-04-23023 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0046 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24113A3122024-04-22022 April 2024 Cycle 24 Core Operating Limits Report ML24097A0072024-04-0606 April 2024 Relief Request Number RR-ENG-4-07 – Request for an Alternative to ASME Code Case N-729-6 for Reactor Vessel Head Penetration 75 ML24092A1902024-04-0101 April 2024 Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24088A3022024-03-28028 March 2024 Financial Assurance for Decommissioning - 2024 Update ML24081A3972024-03-21021 March 2024 Response to Request for Additional Information for Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24080A2902024-03-19019 March 2024 Nuclear Liability Certificates of Insurance ML24066A2002024-03-0606 March 2024 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes ML24079A1312024-03-0505 March 2024 Nuclear Insurance Protection ML24060A1742024-02-28028 February 2024 Submittal of Annual Fitness for Duty Performance Report for 2023 IR 05000498/20230062024-02-28028 February 2024 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023006 and 05000499/2023006) IR 05000498/20240132024-02-27027 February 2024 Design Basis Assurance Inspection (Programs) Commercial Grade Dedication IR 05000498/2024013 and 05000499/2024013 2024-09-04
[Table view] Category:Proprietary Information Review
MONTHYEARML23198A0532023-07-24024 July 2023 Request for Withholding Information from Public Disclosure ML20232D1442020-08-26026 August 2020 Request for Withholding Information from Public Disclosure ML20128J8432020-05-15015 May 2020 Request for Withholding Information from Public Disclosure ML20059G6782020-03-0404 March 2020 Request for Withholding Information from Public Disclosure, Affidavit Date January 27, 2020, Executed by Mr. Korey L. Hosack ML16194A2342016-07-21021 July 2016 Request for Withholding Information from Public Disclosure - 5/6/16 Affidavit Executed by D. Munoz and M. Rozboril, Alion Science and Technology, Response to Follow-up RAIs 18, 38, and 44 ML16117A3222016-05-0404 May 2016 Request for Withholding Information from Public Disclosure - 3/2/16 Affidavit Executed by J. Gresham, Westinghouse, LTR-PAFM-16-11-P, Rev. 0, Related to Relief Request, Use of ASME Code Case N-770-1 ML15205A0512015-08-10010 August 2015 Request for Withholding Information from Public Disclosure, 4/22/15 Affidavit Executed by J. Gresham, Westinghouse LTR-PAFM-15-27-P Provided in Support of Relief Request RR-ENG-3-17, Relief from Code Case N-770-1 ML14290A2002014-11-13013 November 2014 Request for Withholding Information from Public Disclosure, 8/4/14 Affidavit Executed by E. Hauser, Cameron International, Caldon Ultrasonic Technology Center Engineering Report ER-1060, Revision 1 ML14290A2212014-11-13013 November 2014 Request for Withholding Information from Public Disclosure, 8/4/14 Affidavit Executed by E. Hauser, Cameron International, Caldon Ultrasonic Technology Center Engineering Report ER-1059, Revision 1 ML14092A5572014-06-0404 June 2014 Request for Withholding Information from Public Disclosure - 2/10/14 Affidavit Executed by M. Stachowiak, Alion Science and Technology; Casa Grande Computer Codes and Input; GSI-191 Amendment and Exemption Requests ML14091A4522014-04-0808 April 2014 Request for Withholding Information from Public Disclosure - 12/9/13 G. Powell, STPNOC Affidavit Enclosing RELAP5 Digital Media Related to GSI-191 License Amendment and Exemption Requests ML0907103302009-04-30030 April 2009 Corp., Request for Withholding Information from Public Disclosure ML0721408812007-08-14014 August 2007 Request for Withholding Information from Public Disclosure - Attachment 2A to 5/3/07 Application and Attachment 2A to 7/20/07 Supplement - Order Approving Indirect Transfer of Control of Licenses (TAC MD5656 & MD5657) ML0529404712005-10-27027 October 2005 S.Texas, Texas Genco GP, LLC and Nrg Energy, Inc.- Request for Withholding Information from Public Disclosure ML0505900472005-03-0808 March 2005 Texas Genco LLC and Texas Genco LP - Withholding from Public Disclosure, Information in Attachment 7C (Proprietary), to the February 23, 2005 Letter ML0502403512005-02-0909 February 2005 Westinghouse, Withholding from Public Disclosure, Attachment 1 to South Texas, Units 1 & 2, Concerning a Change in Analytical Methodology, MC0759 & MC0760 ML0435200182004-12-30030 December 2004 Texas Genco LLC and Texas Genco LP, Withholding from Public Disclosure, Attachments to Letter Dated December 13, 2004, for South Texas, Units 1 and 2 ML0433703672004-12-13013 December 2004 Westinghouse Electric Co, Withholding from Public Disclosure, for South Texas Project Unit 1, Response to RAI - Attachment 1 to October 6, 2004, Letter & Response to RAI - Attachment 1 to November 30, 2004 Letter Re a Change in Analytical M ML0431706412004-11-0909 November 2004 Request for Withholding Information from Public Disclosure by Letter Dated October 12, 2004 ML0418403042004-07-0101 July 2004 Westinghouse, Withholding from Public Disclosure, Request for Exemption from Provisions of 10 CFR 50.44, 10 CFR 50.46, & 10 CFR 50 Appendix K for Eight Lead Test Assemblies (Ltas) & Supporting Justification for South Texas Project Optimized ML0416103372004-06-0808 June 2004 Cameco Corp., Request for Withholding Information from Public Disclosure for S. Texas, Units 1 and 2. (TAC MC2880 & MC2881) ML0415507822004-06-0303 June 2004 Application for Withholding Proprietary Information from Public Disclosure NOC-AE-04001727, Application for Withholding Proprietary Information from Public Disclosure2004-05-12012 May 2004 Application for Withholding Proprietary Information from Public Disclosure ML0334603172003-12-12012 December 2003 Request for Withholding Information from Public Disclosure Per Section 2.790 ML0322601572003-08-14014 August 2003 Withholding from Public Disclosure, Westinghouse Field Service Procedure STD-FP-1998-8202, Rev Figure 6.1, MB8435 ML0210101602002-04-25025 April 2002 Withholding Ltr, Affidavit Dated June 21, 2001 Concerning 1.4 Percent Power Uprate (CAW-01-1466) (Tac Nos MB2899 and MB2903) ML0210007032002-04-25025 April 2002 Withholding Ltr, 10 CFR 2.790 Concerning 1.4 Percent Power Uprate (Tac Nos MB2899 and MB2903) 2023-07-24
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 13, 2014 Mr. Dennis L. Koehl President and CEO/CNO STP Nuclear Operating Company South Texas Project P.O. Box 289 Wadsworth, TX 77 483
SUBJECT:
SOUTH TEXAS PROJECT, UNITS 1 AND 2- REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NOS. MF4639 AND MF4640)
Dear Mr. Koehl:
By letter dated August 14, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14260A432), STP Nuclear Operating Company submitted an affidavit dated August 4, 2014, executed by Mr. Ernest M. Hauser, Director of Sales, Cameron International Corporation/Caldon Ultrasonics Technology Center (Cameron), requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:
Engineering Report No.: ER-1060, Rev. 1, "Meter Factor Calculation and Accuracy Assessment for South Texas Project, Units 1 and 2," August 2014 (Attachment 4 to the letter dated August 14, 2014)
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Cameron's competitors without license from Cameron constitutes a competitive economic advantage over other companies.
(b) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.
(c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, and assurance of quality, or licensing a similar product.
A redacted version of Engineering Report ER-1060, Rev. 1, designated as Attachment 2 to the letter dated August 14, 2014, was also submitted and is located at ADAMS Accession No. ML14260A439.
D. Koehl We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the information sought to be withheld in the submittal, contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the U.S. Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at (301) 415-3016.
Sincerely, Rc. Q._ + ~, "'"c..Q Etal'want K. Singal, Senior'"PrOject Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499 cc: Mr. Ernest M. Hauser Director of Sales Cameron International Corporation Caldon Ultrasonics Technology Center 1000 McClaren Woods Drive Coraopolis, PA 15108 Additional distribution via Listserv
- .. ML14290A200 OFFICE NRR/DORLILPL4-1/PM NRR/DORLILPL4-1/LA NRR/DSS/SRXB/BC(A) NRR/DORLILPL4-1/BC NRRIDORLILPL4-1/PM NAME BSingal (Flyon for) JBurkhardt UShoop (CJackson for) MMarkley BSingal DATE 10/20/14 10/20/14 11/13/14 11/13/14 11/13/14