Similar Documents at Zion |
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20205Q8801999-04-13013 April 1999 Proposed Tech Specs Page 5-9,replacing Operational TSs with Permanently Defueled TSs ML20154E3441998-10-0202 October 1998 Proposed Tech Specs Pages Re Amends to Licenses DPR-39 & DPR-48,eliminating License Conditions No Longer Applicable & Replacing Existing Operational Custom TS with Permanently Defueled TS ML20217H9451998-03-30030 March 1998 Proposed Tech Specs Restoring Plant Custom TS Replaced W/ Improved TS by Previous Amend & Reinstating License Condition Deleted by That Previous Amend ML20202H3641997-11-28028 November 1997 Proposed Improved TSs Using Guidance Provided in NUREG-1431 ML20199D6251997-11-10010 November 1997 Proposed Improved TS Bases Changes & Supporting Info & Final Proposed TS Bases for Section 3.3,including Revised Table of Contents & List of Effective Pages ML20211B9941997-08-0606 August 1997 Proposed Improved Tech Specs Re Draft SER for Zion Station Conversion,Per NUREG-1431 ML20196G8781997-07-18018 July 1997 Proposed Tech Specs,Meeting Administrative Commitment Resulting from from Plant TS Improvement Program ML20140D8071997-06-0606 June 1997 Proposed Tech Specs Using Guidance Provided in NUREG-1431,to Produce Set of Improved TS for Plant ML20148B7371997-05-0808 May 1997 Proposed Tech Specs Re Addition of Discussion of Position & Duties of Licensed Operators & Senior Licensed Operators to Section 5.3, Qualification ML20134J2971997-02-0303 February 1997 Proposed Tech Specs Suppl to 960920 Application for Amend to Licenses DPR-39 & DPR-48,providing Annotated & Clean Copies of ITS Pp Affected by Proposed Amend ML20134G0991997-01-27027 January 1997 Proposed Tech Specs Re Revising TS Such That Use of Entire Abb/Ce TR,CEN-629-P,would Be Authorized as Governing Document for Installing CE Sleeves in SG Tubes ML20133D0901997-01-0202 January 1997 Proposed Tech Specs Using Guidance in NUREG-1431 to Produce Improved TSs ML20132B8331996-12-11011 December 1996 Proposed Tech Specs Completely Revising TS Using Guidance Provided in NUREG-1431, Std Ts,Westinghouse Plants ML20134J3641996-11-0808 November 1996 Proposed Tech Specs Re Rquirements Governing RCS Pressure & Temp Limits ML20134G5921996-11-0707 November 1996 Proposed Tech Specs 3.13.1.A Re Limiting Operation for Operation ML20134G4141996-11-0707 November 1996 Proposed Tech Specs Table 3.7-1 Re Reduced Power Range Neutron Flux High Setpoint Trip ML20134G3401996-11-0707 November 1996 Proposed Tech Specs 4.3.1.A.4.b Re Surveillance Requirement ML20129J7731996-11-0101 November 1996 Proposed Tech Specs Modifying Section 3.15.2.A & Section 4.15.2.A of TS ML20128Q8891996-10-14014 October 1996 Proposed Tech Specs 3.3.2.G Re Limiting Condition for Operation & 4.3.2.G Re Surveillance Requirements ML20128L8371996-10-0404 October 1996 Proposed Tech Specs Re Implementation of Option B to 10CFR50,App J ML20128L7831996-10-0404 October 1996 Proposed Tech Specs Modifying F* Distance Definition ML20128H3011996-10-0404 October 1996 Proposed Tech Specs,Clarifying & Adding Mode of Applicability for Rod Position Indicator Channels to TS ML20059H5811994-01-19019 January 1994 Proposed Tech Specs Revising RCS Temperature Required for Reactor Criticality,In Addition to Editorial Changes in Affected Specifications ML20058C3031993-11-19019 November 1993 Proposed Tech Specs Changing LTOP of Reactor Vessel ML20058A2651993-11-10010 November 1993 Proposed Tech Specs Re Limitations on Radioactive Matl Released in Liquid & Gaseous Effluents & New 10CFR21 ML20059H9541993-11-0404 November 1993 Proposed Tech Specs Revising Surveillance Frequency & Acceptance Criteria ML20056F7291993-08-23023 August 1993 Proposed Tech Specs for Implementation of Latest Rev to 10CFR20, Stds for Protection Against Radiation ML20127N0531992-12-22022 December 1992 Proposed Tech Specs to Relocate Fire Protection TSs to an owner-controlled Document Consistent W/Guidance Provided in Generic Ltrs 86-10 & 88-12 ML20127C6521992-09-0101 September 1992 Proposed TS for License Amend Request 92-03 Re Reactor Vessel Integrity & RCS Heatup & Cooldown Limitation Curves ML20248G1221989-09-29029 September 1989 Proposed Tech Spec Page 210 Re Containment Isolation ML20248B3991989-09-25025 September 1989 Proposed Tech Specs to App a Re Section 3.9 Containment Isolation ML20247D0841989-07-18018 July 1989 Proposed Tech Specs,Removing Section 3/4.17.2, Aircraft Fire Detection Sys ML20246D4131989-07-0606 July 1989 Proposed Tech Spec Section 3.15, Auxiliary Electric Power Supply ML20245C6151989-06-13013 June 1989 Proposed Tech Specs Revising Sections 4.0.3 & 4.0.4 Re Applicability of Limiting Conditions for Operations & Surveillance Requirements ML20247M9681989-06-0202 June 1989 Proposed Tech Specs,Revising Tech Spec Section 4.3 to Allow Plant Steam Generator Tubes to Be Repaired Through Installation of Welded Sleeve ML20246N3071989-05-11011 May 1989 Proposed Tech Specs Modifying Section 3.15.2.C to Extend one-time Maint Overhaul to 45 Days to Perform Extensive Overhaul to Diesel Generator O to Conform W/Mfg Recommendation ML20247C2731989-05-10010 May 1989 Revised Proposed Tech Specs Re Reactor Protection Sys ML20245D5981989-04-17017 April 1989 Proposed Tech Specs,Changing Tables 3.1-1 & 4.1-1 to Address Operability & Surveillance Requirements for Reactor Protection Channels ML20248E3751989-03-22022 March 1989 Proposed Tech Specs Re Administrative Controls Section 6.0 ML20235M0411989-02-22022 February 1989 Proposed Tech Specs Changing Section 6.1 Re Administrative Controls ML20155D1451988-09-28028 September 1988 Proposed Tech Spec 4.2.1.F.1 Re Boric Acid Sys ML20195J1571988-06-0909 June 1988 Proposed Tech Specs Section 3.2,3.4,3.8 & 3.9 to Remove Boron Injection Tank (Bit) & Associated Piping,Valves & Heat Trace for Recirculation Between Bit & Boric Acid Tanks ML20147H5911988-03-0404 March 1988 Revised Proposed Tech Specs Re RCS & Pressure Isolation Valve Leakage ML20149G1981988-02-11011 February 1988 Proposed Tech Spec Page 274 Re 125-volt Battery Testing ML20149F1791987-12-24024 December 1987 Proposed Tech Specs Allowing Use of Westinghouse or C-E Sleeving Methodology to Repair Steam Generator Tubes ML20237B5291987-12-0909 December 1987 Proposed Tech Spec Section 4.15.1.E Re 125-Volt Batteries, Upgrading Plant Program for Verifying Existence of Adequate Battery Capacity ML20236G0681987-10-27027 October 1987 Proposed Tech Specs,Extending Snubber Insp Period ML20236C0421987-10-22022 October 1987 Proposed Tech Specs,Removing Refs to Initial Base Line Inservice Insp & to Specific Version of ASME Section XI Code ML20235E2471987-09-22022 September 1987 Proposed Tech Specs,Allowing one-time Visual Insp of Snubbers to Be Performed During Planned Refueling Outages ML20214T4251987-05-29029 May 1987 Proposed Tech Specs to Allow Simultaneous Charging Pump Operation During Pump Realignment & to Reduce Allowable Time Period for Depressurization Following Failure of PORV 1999-04-13
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20216G1351999-09-23023 September 1999 Rev 5 to Chapter 12 of Zion Annex Odcm ML20209F8321999-06-30030 June 1999 Rev 4,Chapter 12 of ODCM for Zion Annex ML20211C3311999-04-30030 April 1999 Rev 2.0 to Generic ODCM for Dresden,Quad Cities,Zion, Lasalle,Byron & Braidwood ML20205Q8801999-04-13013 April 1999 Proposed Tech Specs Page 5-9,replacing Operational TSs with Permanently Defueled TSs ML20154E3441998-10-0202 October 1998 Proposed Tech Specs Pages Re Amends to Licenses DPR-39 & DPR-48,eliminating License Conditions No Longer Applicable & Replacing Existing Operational Custom TS with Permanently Defueled TS ML18068A7121998-07-31031 July 1998 Rev 3 to Chapter 12 of Zion Station Odcm. ML20217N9661998-03-31031 March 1998 Revs to ODCM for Zion Station,Including Rev 2 to Chapters 10 & 12 ML20217H9451998-03-30030 March 1998 Proposed Tech Specs Restoring Plant Custom TS Replaced W/ Improved TS by Previous Amend & Reinstating License Condition Deleted by That Previous Amend ML20216G8981998-03-16016 March 1998 Certified Fuel Handler Training & Retraining Program ML20202H3641997-11-28028 November 1997 Proposed Improved TSs Using Guidance Provided in NUREG-1431 ML20199D6251997-11-10010 November 1997 Proposed Improved TS Bases Changes & Supporting Info & Final Proposed TS Bases for Section 3.3,including Revised Table of Contents & List of Effective Pages ML20216H9041997-10-31031 October 1997 Revs to OCDM for Zion Station,Including Rev 1.9 to Chapter 10,rev 1.1 to Chapter 11,rev 1.9 to Chapter 12 & Rev 1.1 to App F ML20212B4761997-10-22022 October 1997 Rev 3 to Zion Nuclear Station Recovery Program,Dept Start- Up Readiness Assessment Guideline ML20212B4421997-10-22022 October 1997 Rev 3 to Zion Nuclear Station Recovery Plan ML20212B4471997-10-22022 October 1997 Rev 3 to Zion Nuclear Station Recovery Program,Scope Mgt Guideline ML20212B4601997-10-22022 October 1997 Rev 3 to Zion Nuclear Station Recovery Program,Sys Readiness Review ML20211B4831997-09-0505 September 1997 Restart Action Plan ML20211B9941997-08-0606 August 1997 Proposed Improved Tech Specs Re Draft SER for Zion Station Conversion,Per NUREG-1431 ML20196G8781997-07-18018 July 1997 Proposed Tech Specs,Meeting Administrative Commitment Resulting from from Plant TS Improvement Program ML20140D8071997-06-0606 June 1997 Proposed Tech Specs Using Guidance Provided in NUREG-1431,to Produce Set of Improved TS for Plant ML20140C4151997-06-0505 June 1997 Rev 1 to Zion Nuclear Station Recovery Plan ML20148B7371997-05-0808 May 1997 Proposed Tech Specs Re Addition of Discussion of Position & Duties of Licensed Operators & Senior Licensed Operators to Section 5.3, Qualification ML20134J2971997-02-0303 February 1997 Proposed Tech Specs Suppl to 960920 Application for Amend to Licenses DPR-39 & DPR-48,providing Annotated & Clean Copies of ITS Pp Affected by Proposed Amend ML20216E6041997-01-31031 January 1997 Amend 4 to Zion Station Fire Protection Rept ML20137B4691997-01-31031 January 1997 Rev 1.9 to Chapter 10, Zion Annex Index & Rev 1.8 to Chapter 12, Radioactive Effluent Technical Stds ML20134G0991997-01-27027 January 1997 Proposed Tech Specs Re Revising TS Such That Use of Entire Abb/Ce TR,CEN-629-P,would Be Authorized as Governing Document for Installing CE Sleeves in SG Tubes ML20133D0901997-01-0202 January 1997 Proposed Tech Specs Using Guidance in NUREG-1431 to Produce Improved TSs ML20132B8331996-12-11011 December 1996 Proposed Tech Specs Completely Revising TS Using Guidance Provided in NUREG-1431, Std Ts,Westinghouse Plants ML20134J3641996-11-0808 November 1996 Proposed Tech Specs Re Rquirements Governing RCS Pressure & Temp Limits ML20134G5921996-11-0707 November 1996 Proposed Tech Specs 3.13.1.A Re Limiting Operation for Operation ML20134G4141996-11-0707 November 1996 Proposed Tech Specs Table 3.7-1 Re Reduced Power Range Neutron Flux High Setpoint Trip ML20134G3401996-11-0707 November 1996 Proposed Tech Specs 4.3.1.A.4.b Re Surveillance Requirement ML20129J7731996-11-0101 November 1996 Proposed Tech Specs Modifying Section 3.15.2.A & Section 4.15.2.A of TS ML20134H4591996-10-31031 October 1996 Rev 1.8 to Chapter 10 Odcm,Zion Annex Index ML20128Q8891996-10-14014 October 1996 Proposed Tech Specs 3.3.2.G Re Limiting Condition for Operation & 4.3.2.G Re Surveillance Requirements ML20128L8371996-10-0404 October 1996 Proposed Tech Specs Re Implementation of Option B to 10CFR50,App J ML20128H3011996-10-0404 October 1996 Proposed Tech Specs,Clarifying & Adding Mode of Applicability for Rod Position Indicator Channels to TS ML20128L7831996-10-0404 October 1996 Proposed Tech Specs Modifying F* Distance Definition ML20129E5621996-09-30030 September 1996 Rev 1.1 to Chapter 11 to Odcm,Zion Annex Index ML20129J4891995-10-0404 October 1995 On-Site Review for ODCM Revision ML20059H5811994-01-19019 January 1994 Proposed Tech Specs Revising RCS Temperature Required for Reactor Criticality,In Addition to Editorial Changes in Affected Specifications ML20058C3031993-11-19019 November 1993 Proposed Tech Specs Changing LTOP of Reactor Vessel ML20058A2651993-11-10010 November 1993 Proposed Tech Specs Re Limitations on Radioactive Matl Released in Liquid & Gaseous Effluents & New 10CFR21 ML20059H9541993-11-0404 November 1993 Proposed Tech Specs Revising Surveillance Frequency & Acceptance Criteria ML20058E8751993-09-0303 September 1993 Revised AOP-6.3, Loss of RHR Shutdown Cooling ML20056F7291993-08-23023 August 1993 Proposed Tech Specs for Implementation of Latest Rev to 10CFR20, Stds for Protection Against Radiation ML20056H0281993-08-20020 August 1993 Errata to Chapter 12 to ODCM, Including Revised Table 12.2-1,12.2-3 & 12.5-1 ML20056G8131993-06-30030 June 1993 Pump & Valve Inservice Testing Plan for Zion Nuclear Generating Station Units 1 & 2 ML20058E8351993-06-10010 June 1993 Revised AOP-7.4, Control Room Inaccessibility ML20127D0691992-12-30030 December 1992 Corporate Emergency Response Organization Required Reading Package 92-11 1999-09-23
[Table view] |
Text
,
ATTACHENT Proposed Zion Appenoix A Technical Specification Changes to Sections 3.10 and 4.10 Containment Structural Integrity (Modification of 1/30/85 Proposal)
Pages Modified 214a 214b 8507190289 DR 850700 p ADOCK 05000295 PDR 0341K l
LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENT 3.10.2 Containment Air Locks 4.10.2 Containment Air Locks A. Each containment air lock shall be A. Each air lock shall be demonstrated OPERABLE with: OPERABLE:
- 1. Both doors closed except when 1. Within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> following each the air lock is being used for opening (except when the air normal entry and exit through lock is being used for multiple the containment, then at least entries, then at least once per one air lock door shall be 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />);
closed, and .
- a. Verify that the leakage
- 2. The air lock leakage rate, when rate from the air lock door combined with other Type B and seals is less than or eaual C test results, shall be less to 1.0 SCFH at a test than or equal to 0.60 La at pressure (Pt r) of greater 47 psig (Pa).
~
than or equal to 2.5 psig; or verify that the leakage rate from the air lock door APPLICABILITY: Modes 1, 2, 3, 4 and 7 seals is less than or equal to 4.75 SCFH at a test pressure (P t ) of greater ACTION: than or equal to 10.0 psig.
a.) With one containment air lock door inoperable: b. If the air lock door seal 1 Maintain at least the OPERABLE test identifies a leakage air lock door closed and either rate greater than 1.0 SCFH restore the inoperable air lock at a test pressure (Ptr) door to OPERABLE status within of greater than or equal to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or lock the OPERABLE ,2.5 psig or 4.75 SCFH at a air lock door closed. test pressure (P t) Of
- 2. Operation may continue until greater than or equal to performance of the next 10.0 psig, then an overall required overall air lock air lock leakage test shall leakage test provided that the be performed at a pressure OPERABLE air lock door is (Pa) of 47 psig or verified locked closed at least greater. The acceptance once per 31 days, criteria shall be as stated
- 3. Otherwise be in at least MODE 3 in 3.10.2.A.?.
within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and MODE 5 within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
07830/07840 214a
LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENT 3.10.2 (Continued) 4.10.2.A (Continued)
, 4. The provisions of Technical 2. By conducting overall air lock Specification 3.0.4 are not leakage tests at a pressure (Pa) Of
} applicable. 47 psig or greater and verifying the
! overall air lock leakage is within b.) With the containment air lock the limit:
inoperable, except as a result of an a. At 6 month intervals i inoperable air lock door, maintain at b. Prior to entering Mode 4; if in least one air lock door closed; restore Mode 5 greater than or equal to 7 the inoperable air lock to OPERABLE days and containment integrity status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at has been broken (both doors open).
least MODE 3 within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />
- and in M3DE S within the following 30 3. At least once per 6 months by hours. verifying that only one door in each air lock can be opened at a time.
07830/07840 214b