Forwards Rev 5 to Calvert Cliffs Nuclear Power Plant Emergency Action Levels Technical Basis Document
ML20135F469
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 03/06/1997
From: Cruse C
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20135F472 List:
References
TAC-M87080, TAC-M87081, NUDOCS 9703120388
Download: ML20135F469 (2)


Text

m, CH ARLES II. CHUSE Baltimore Gas and Electric Company Vice President Calvert Cliffs Nuclear Power Plant Nuclear Energy 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410 495-4455 March 6,1997 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Independent Spent Fuel Storage Facility Docket No. 72-8 Revision to Emergency Action Levels Technical Basis Document

REFERENCE:

(a) Letter from Mr. D. G. Mcdonald, Jr. (NRC) to Mr. R. E. Denton (BGE),

dated April 12,1994, Emergency Action Levels, Calvert Cliffs Nuclear Power Plant Units 1 and 2 (TAC Nos. M87080 and M87081)

Enclosed for your information is Revision 5 to the Calvert Cliffs Nuclear Power Plant Emergency Action Levels Technical Basis Document. The Technical Basis Document meets Regulatory Guide 1.101 criteria (i.e., NUMARC/NESP-007, Methodology for Development of Emergency Action Levels), and has been approved by the NRC (Reference a).

The Emergency Action Level changes that will be effected by Revision 5 of the Technical Basis Document will be incorporated in Revision 18, Change 9, of Calvert Cliffs Emergency Response Plan Implementation Procedure 3.0, "Immediate Actions." Emergency Response Plan Implementation Procedure 3.0, Revision 18, Change 9, will be implemented approximately 90 days from the date of this letter, but not earlier than 45 days. This implementation date allows for staff training and for other internal document processing requirements. The Emergency Action Level Technical Basis Document, Revision 5, changes have been reviewed with appropriate State and local agencies.

/

$b 1

9703120388 970306 \

PDR ADOCK 05000317 F PDR hE.NN!kN.I.E.N.

o

' Docuihent Control Desk March 6,1997 l Page 2 Should you have questions regarding this matter, please contact Mr. T. E. Forgette, Director-Emergency

. Planning, at (410) 495-4996.

Very truly yours, i

. 9/ d44W l l

CHC/GT/ dim

Enclosure:

Revision 5 to the Calvert Cliffs Nuclear Power Plant Emergency Action Levels Technical Basis Document cc: (Without Enclosure)

D. A. Brune, Esquire H. J. Miller, NRC

)

J. E. Silberg, Esquire Resident inspector, NRC Director, Project Directorate I-1, NRC R. I. McLean, DNR 1

-- A. W. Dromerick, NRC J. H. Walter, PSC I l

___ --