ML20147D443

From kanterella
Revision as of 03:24, 12 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Application for Amend to License NPF-l Consisting of License Change Application 162,revising Offsite & Facility Organization Charts
ML20147D443
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 01/15/1988
From: Cockfield D
PORTLAND GENERAL ELECTRIC CO.
To:
Shared Package
ML20147D413 List:
References
TAC-66988, NUDOCS 8801200174
Download: ML20147D443 (6)


Text

_ .. . . _ . .. ___. . ._ __

., .3 l

i I

l POP.TLAND CENERAL ELECTRIC COMPANY i I

EUGENE WATER & ELECTRIC BOARD AND PACIFIC POWF.R & LIGHT COMPANY Operating License NPF-1 Docket 50-344 License Change Application 162 This License Change Application requests modifications to Operating License NPF-1 for the Trojan Nuclear Plant to revise the Offsite and Facility Orgnnization charts in the Technical Specifications.

PORTLAND GENERAL ELECTRIC COMPANY B

D. W.edockfield  !

Vice President l Nuclear Subscribed and sworn to before me this luth day of Januaey 1988.

n/, f,

  • q. G OMyCommission

< < n .< [

./

o 8801200174 880115 PDR ADOCK 05000344 p DCL

.c ,

LCA 162 9 age 1 of 5 DgSCRIPTION OF CHANGES i

1. The following addition is made + o Trojan Technical Specification Figure 6.2-1, offsite Organization:

Manager, Nuclear Security reporting to the General Manager, Corporate Security.

2. The following deletions or corrections are made to Figure 6.2-1:
a. Board of Directors and Chairman of the Board are deleted. ,
b. Manager, System Ccntcul is dtleted.
c. General Manager, Trojan Nuclear Plant is deleted.
d. Plant Review Board is deleted.
e. Sanior Vice President, General Co'.4sel and Secretary is deleted, r
f. Senior Vice President, Electric Operations is changed to read Vice President, Power Services.
g. Vice President, Operating Services is deleted.

h Vice President, Power Systems is changed to read Vice President, Power Management.

{

i. Manager, Power Supply la changed to read General Manager, Power i Marketing.

J. Manager, Fuel Operations is changed to read Manager, Power and Fuel Contracts and changed to report to General Manager, Power Marketing.

k. General Manager, Purchasing and Materials Management is changed to read Purchasing Agent.
l. General Manager, Corp' orate Security, is changed to report to Vice f President, Nuclear.  ;
3. The following additions are made to Irojan Technical Specification Figure 6.2-2. Facility Organization:
a. Vice President. Nuclear,
b. General Manager, Technical Functions.
c. System Engineering Branch Manager reporting to the Manager, Technical Services, t

. LCA 162

, Page 2 of 5

d. Surveillance & Test Engineering Branch Manager reporting to the Manager, Technical Services,
e. Plant Review Board ecporting to the General Manager.
f. Performance Monitoring / Event Analysis reporting to the Vice President, Nuclear,
g. Manager, Personnel Protection reporting to the General Manager,
h. Plant Safety Coordinator reporting to the Manager, Personnel Protection.
i. Quality Assurance Operations Branch Manager and Quality Control Supervisor reporting to the Manager, Nuclear Quality Assurance (QA).
j. Procurement Supervisor reporting to Manager, Plant Services, j
4. The following deletions or corrections are unde to Figure 6.2-2:
a. Manager of Safety and Labor is changed to read Manager, Staffing / Health and Safety.
b. Safety Coordinator is changed to read Health and Safety Specialist.
c. Manager, Plant Modifications is changed to report to the Genera'$

Manager, Technical Functions,

d. Maintenance. Operations, Training, Chemistry, and Radiation Protection Supervisors are changed to Branch Managers.
e. All staff positions below the Supervisor level are deleted with the exception of Operations.
f. Engineering Supervisor is deleted,
g. Planner Scheduler is changed L) read Manager, Ca.ege Planning and Scheduling.

I h. Shift Technical Advisors are changed to report directly to the Manager, Technical Services.

i. Chemistry and Radiation Protection Branch Managers and Plant i Safety Coordinator are changed to report to the Manager, Personnel Protection.

l l

l t

LCA 162 Page 3 of 5

j. Director, Corporate Security is changed to read Manager, Nuclear Security.
k. Security Supervisor is changed to read Branch Manager, Nuclear Security.
5. In the list of Plant Review Board members of Trojan Technical Speci-fication 6.5.1.2, the positions of Engineering, Maintenance, Operations, QA, and Radiation Protection Supervisor are changed to read System Engineering, Maintenance, Operations. Quality Assurance Operations, and Radiation Protection Branch Manager, respectively.

REASON FOR CHANCES

1. The changes described in 1, 2b, e. C, g, h, i, j, k, and 1 above are made to reflect the current Corporate organization. The deletions of the General Manager, Trojan Nuclear Plant, and the Plant Review Board (2c and d above) are made since these are onsite positions which are more appropriately shown on the Facility Organization chart of Figure 6.2-2. The deletions of the Board of Directors and Chairman of the Board (2a above) are made to simplify the organization chart.
2. The addition of the Plant Review Board in Figure 6.2-2 appropriately reflects its advisory position to the General Manager. The System Engineering and Surveillance and Test Engineering Branch Managors are now positions, assuming the duties previously hold by the Engi-neering Supervisor. The Manager, Personnel Protection, is a new position assuming tesponsibility for chemistry, radiation protec-tion, and safety. The revised QA organization reflecta changes made to the program.
3. The changes to titles in Figure 6.2-2 are made to reflect current position names. The detailed organizational structures below the supervisor level are not necessary for this organization chart and are deleted. The change in reporting for the Shift Technical Advisors clarifies the program responsibility under the Manager, Technical Services. The changes in lines of reporting are made to reflect the current onsite organization. The change from Director, Corporate Security to Manager, Nuclear Security more accurately shows the security organizational line of reporting.
4. The title changes in Trojan Technical Specification 6.5.1.2 reficcts the new position names resulting from recent organizational changes.

LCA 162 Page 4 of 5 SIGNIFICANT HAZARDS CONSIDERATIONS l

In accordance with the requirements of 10 CFR 50.92, this License Change Application is judged to involve no significant hazards based upon the l

following considerations:

l

1. Does the proposed license amendment involve a significant increase in the probability or consequences of an accident?

Thin change is administrative only correcting position titles, adding new positions, simplifying unnecessary detail, and reflecting the reassignment of responsibility for administering the onsite QA, and Shift Technical Advisor programs. No change is being made to any of the approved programs, nor the physical configuration of the Plant.

All limiting conditions for operation and safety system settings will continue to be imposed.

With respect to the Fire Protection Program, all required features, surveillances, duties, and responsibilities outlined in PGE-1012, Fire Pr?tection Plan, will continue to be performed.

With respect to the Shift Technical Advisor program, all required training, experience, and duty requirements of Trojan Technical Specification Sections 6.2, 6.3, and 6.4 will continue.

With respect to the QA Program, the functions, duties, and responsi-bilities assigned in PCE-8010, Nuclear QA Program, will continue to be performed.

Therefore, there is no increase in the probability or the consequences of an accident previously evaluated.

2. Does the proposed license amendment create the possibility of a new or different kind of accident from any previously evaluated?

As noted above, there aro no substantive changes to the onsite QA, Fire Protection or Shift Technical Advisor programs. This change is administrative only and does not create the possibility of a new or different kind of accident.

3. Does the proposed amendment involve a significant reduction in a margin of safety?

As noted above, this change does not involvo a substantive change to any of the involved programs. This change is administrative only and has no effect on the wargin of safety.

LCA 162

. Page 5 of 5 .

In the April 6, 1983 Federal Register, the NRC published a list of examples of amendments that are not likely to involve significant hazards concerns < Example No. 1 of that list states the following to show Why this amendment is not considered likely to involve a significant hazards consideration:

"Purely administrative change to Technical Specifications: For example, a change to achieve consistency throughout the Technical Specifications, correction of an error, or a change in nomenclature."

SAFETY /ENVIRONMr1TAL EVALUATION Safety and environmental evaluations were performed as required by 10 CFR 50 and the Trojan Technical Specifications. This review deter-mined that an unreviewed safety question does not exist since Plant l operations remain consistent with the t'pdated FSAR, adequate surveillance  !

is maintained, and there is no conceivable impact upon the environment.

6059k.138 P

i i

r

[

I 4

W D

r v - r v ~ v-