ML20149K068

From kanterella
Revision as of 13:30, 11 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Form NIS-2 Owner'S Rept for Repairs or Replacements, Inadvertently Left Out of Original ISI Rept Submitted by
ML20149K068
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 07/23/1997
From: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20149K070 List:
References
NUDOCS 9707290233
Download: ML20149K068 (1)


Text

. 2

. Dava Morey South:rn Nucirar Vice President Optrating Company l Farley Project P.O. Box 1295 l

Birmingham Alabama 35201 l

Tel 205.992.5131 l

SOUTHERNkh July 23,1997 COMPANY Energy to Serve YourWorld" Docket No. 50-364 U.S. Nuclear Regulatory Conunission ATFN: Document Control Desk Washington, DC 20555 Joseph M. Farley Nuclear Plant - Unit 2 Interval 2/ Period 2/ Outage 2 Inservice insocction Report Ladies and Gentlemen:

Southern Nuclear Operating Company submitted the above referenced Inservice inspection Report for Farley Nuclear Plant by letter dated March 11,1996.

This letter transmits an NIS-2 fonn which was inadlertently left out of the original report. This NIS-2 fonn should be inserted into the Class 2 section under Tab J.

If there are any questions, please advise.

Respectfully submitted, bM Dave Morey AJP: cit INS 2. doc Enclosure cc: Mr. L. A. Reyes, Region 11 Administrator Mr. J. I. Zimmerman, NRR Project Manager -

Mr. T. M. Ross, FNP Sr. Resident inspector g b f )f 2000G3 9707290233 970723 gDR ADOCK O 364 }{\llll{lhf!klkh!!kk!!,