ML17073A093
From kanterella
Revision as of 17:59, 24 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML17073A093 | |
Person / Time | |
---|---|
Site: | Wolf Creek |
Issue date: | 03/09/2017 |
Revision: | 0 |
From: | Hafenstine C R Wolf Creek |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
RA 17-0012 | |
Download: ML17073A093 (50) | |
Similar Documents at Wolf Creek | |
---|---|
Category:Letter
MONTHYEARML24025A0992024-01-25025 January 2024
[Table view]Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML24018A0792024-01-22022 January 2024 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed Nshcd and Opportunity for a Hearing (EPID L-2024-LLA-0007) (Letter) ML24018A1382024-01-18018 January 2024 Inservice Inspection Request for Information ML24018A2482024-01-18018 January 2024 License Amendment Request to Modify the Implementation Date of License Amendment No. 238 IR 05000482/20230042024-01-11011 January 2024 Integrated Inspection Report 05000482/2023004 ML23356A0722024-01-0404 January 2024 Supplemental Information Needed for Acceptance of Requested Licensing Actions Exemption from Specific 10 CFR Part 73N Requirements (EPID L-2023-LLE-0048) (Redacted Version) WO 23-0002, Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082023-12-26026 December 2023 Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 ML23348A3662023-12-18018 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000482 2024012) and Request for Information ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23299A2662023-11-29029 November 2023 Issuance of Amendment No. 238 Modified Implementation Date of License Amendment No. 237 ML23331A4972023-11-27027 November 2023 Supplement to License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23325A2112023-11-20020 November 2023 Submittal of Request for Exemption from Specific Provisions in 10 CFR 73.55 ML23320A2772023-11-16016 November 2023 License Amendment Request to Revise Ventilation Filter Testing Program Criteria in Technical Specification 5.5.11.b and Administrative Correction of Absorber in Technical Specification 5.5.11 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23305A3472023-11-0101 November 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML23292A3592023-10-19019 October 2023 License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23292A3572023-10-19019 October 2023 Operating Corporation, Request for Correction in Response to Issuance of Amendment No. 237 and Corresponding Safety Evaluation ML23277A2772023-10-11011 October 2023 Regulatory Audit Summary Concerning Review of Request Number CI3R-01 for Proposed Alternative Inspection Frequency for Containment Unbonded Post Tensioning System Components ML23284A2392023-10-11011 October 2023 NRC Initial Operator Licensing Examination Approval 05000482/2023301 ML23276B4552023-10-0303 October 2023 Technical Specification 5.6.8 Post Accident Monitoring (PAM) Report ML23264A8682023-09-21021 September 2023 Independent Spent Fuel Storage Installation Registration of Dry Storage Canister WC-EOS-37PTH-008-B4L, WC-EOS-37PTH-007-B4L, and WC-EOS-37PTH-002-B4L ML23256A2062023-09-14014 September 2023 Withdrawal of Requested Licensing Action Exemption from Specific 10 CFR Part 73 Requirements ML23165A2502023-08-31031 August 2023 Issuance of Amendment No. 237 Request for Deviation from Fire Protection Requirements ML23243A0002023-08-31031 August 2023 Wolf Generating Station - Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements IR 05000482/20230052023-08-23023 August 2023 Updated Inspection Plan for Wolf Creek Nuclear Operating Corporation, Unit 1 (Report 05000482/2023005) - Mid-Cycle Letter 2023 ML23232A0012023-08-19019 August 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 ML23221A3932023-08-0909 August 2023 Submittal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML23220A4222023-08-0808 August 2023 Supplement to License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ML23201A1212023-08-0707 August 2023 Issuance of Amendment No. 236 Revision to Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML23130A2902023-07-26026 July 2023 Issuance of Amendment No. 235 Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections IR 05000482/20230022023-07-11011 July 2023 Integrated Inspection Report 05000482/2023002 ML23167A0042023-06-26026 June 2023 Audit Plan to Support Review of Request for Alternative Containment Inservice Inspection Frequency IR 05000482/20234012023-06-21021 June 2023 Security Baseline Inspection Report 05000482/2023401 ML23171B1312023-06-20020 June 2023 Additional Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML23151A4162023-05-31031 May 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ET 23-0006, CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components2023-05-17017 May 2023 CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components WO 23-0014, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23132A1532023-05-12012 May 2023 Transmittal of 2022 Annual Financial Reports WM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2023-05-10010 May 2023 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) ML23135A1172023-05-0808 May 2023 Redacted Version of Revision 36 to Updated Safety Analysis Report ML23117A2112023-04-27027 April 2023 Annual Exposure Report (2022) ML23117A1342023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report Report 46 2024-01-04 Category:Technical Specification MONTHYEARML23320A2772023-11-16016 November 2023
[Table view]License Amendment Request to Revise Ventilation Filter Testing Program Criteria in Technical Specification 5.5.11.b and Administrative Correction of Absorber in Technical Specification 5.5.11 ML23068A1232023-03-0909 March 2023 Changes to Technical Specification Bases Revisions 91 and 92 ET 23-0002, Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2023-02-0707 February 2023 Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML22353A5552022-12-15015 December 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements ET 22-0006, Operating Corp. - Application to Revise Technical Specifications to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2022-12-0101 December 2022 Operating Corp. - Application to Revise Technical Specifications to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ET 22-0012, Supplement to License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating2022-07-12012 July 2022 Supplement to License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating ML22067A0302022-03-0808 March 2022 Changes to Technical Specification Bases - Revisions 86, 87, 88, 89, and 90 ML21070A0582021-03-11011 March 2021 Changes to Technical Specification Bases - Revisions 82, 83, 84, and 85 WO 20-0050, License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange2020-11-10010 November 2020 License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange ET 20-0004, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2020-04-27027 April 2020 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) WO 20-0029, License Amendment Request to Revise Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2020-04-20020 April 2020 License Amendment Request to Revise Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML20070L9822020-03-0202 March 2020 Changes to Technical Specification Bases - Revisions 80 and 81 ET 19-0002, License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation.2019-03-18018 March 2019 License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation. ML19078A1302019-03-11011 March 2019 Changes to Technical Specification Bases - Revisions 78 and 79 WO 19-0013, Supplement to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 42019-03-11011 March 2019 Supplement to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4 WO 18-0044, Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-11-15015 November 2018 Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ML18075A0242018-03-0808 March 2018 Changes to Technical Specification Bases - Revisions 76 and 77 WO 18-0004, Response to Request for Additional Information Re License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of ...2018-01-15015 January 2018 Response to Request for Additional Information Re License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of ... ML17073A0932017-03-0909 March 2017 Changes to Technical Specification Bases - Revisions 74 and 75 ML17054C2212017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Revised Technical Specification Pages ML17054C2222017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Proposed Technical Specification Bases Changes ML17054C2202017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Proposed Technical Specification Changes ML16076A3572016-03-10010 March 2016 Changes to Technical Specification Bases - Revisions 67 Through 73 WO 15-0051, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.10 and 3.8.1.142015-09-23023 September 2015 License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.10 and 3.8.1.14 ML15077A0662015-03-11011 March 2015 Changes to Technical Specification Bases, Revisions 61 Through 66 WO 14-0092, Submittal of Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report2014-12-15015 December 2014 Submittal of Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report ET 13-0028, Application to Revise Technical Specifications to Replace a Methodology to TS 5.6.5, Core Operating Limits Report.2013-09-23023 September 2013 Application to Revise Technical Specifications to Replace a Methodology to TS 5.6.5, Core Operating Limits Report. ET 13-0023, License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis2013-08-13013 August 2013 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis ML13079A0602013-03-0808 March 2013 Changes to Technical Specification Bases - Revisions 55 and 56 ML12080A2162012-03-12012 March 2012 Changes to Technical Specification Bases - Revisions 50 Through 54 WO 11-0086, Application to Revise Technical Specification (TS) 3.8.1, AC Sources - Operating2011-11-30030 November 2011 Application to Revise Technical Specification (TS) 3.8.1, AC Sources - Operating ML1107500362011-03-10010 March 2011 Changes to Technical Specification Bases - Revisions 45 Through 49 ML1007801282010-03-11011 March 2010 Changes to Technical Specification Bases - Revisions 41 Through 44 ML1006401412010-03-0404 March 2010 Supplemental Information for Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, Auxiliary Feedwater - Trip of All Main Feedwater Pumps ET 10-0011, Supplemental Information for Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, Auxiliary Feedwater - Trip of All Main Feedwater Pumps2010-03-0404 March 2010 Supplemental Information for Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, Auxiliary Feedwater - Trip of All Main Feedwater Pumps ML1006400442010-03-0303 March 2010 Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, Auxiliary Feedwater - Trip of All Main Feedwater Pumps ET 09-0025, Revision to Technical Specification (TS) 5.5.9, Steam Generator (SG) Program, and TS 5.6.10, Steam Generator Tube Inspection Report2009-09-15015 September 2009 Revision to Technical Specification (TS) 5.5.9, Steam Generator (SG) Program, and TS 5.6.10, Steam Generator Tube Inspection Report WO 09-0022, Request for Approval of Changes to the Technical Specification 3.8.1, AC Sources - Operating, Bases2009-09-0303 September 2009 Request for Approval of Changes to the Technical Specification 3.8.1, AC Sources - Operating, Bases ML0907506242009-03-11011 March 2009 Submittal of Changes to Technical Specification Bases - Revisions 36 Through 40 WO 08-0019, Application to Revise Technical Specification 3.5.2, ECCS-Operating, in Accordance with TSTF-325-A2008-08-18018 August 2008 Application to Revise Technical Specification 3.5.2, ECCS-Operating, in Accordance with TSTF-325-A ET 08-0041, Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation.2008-08-14014 August 2008 Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation. ML0811201492008-04-29029 April 2008 Corrected Technical Specification Pages, Amendment No. 177 Revision to Technical Specification 3.7.3, Main Feedwater Isolation Valves, to Add Main Feedwater Regulating Valves and MFRV Bypass Valves ML0807805602008-03-0707 March 2008 Changes to Technical Specification Bases - Revisions 32 Through 35 ML0804501852008-02-28028 February 2008 Withdrawal of License Amendment Request on Steam Generator Tube Inspections WO 08-0001, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process2008-01-15015 January 2008 Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0707402282007-03-0909 March 2007 Changes to Technical Specification Bases - Revisions 24 Through 31 ML0631905352006-11-15015 November 2006 Tech Spec Pages for Issuance of License Amendment 172 Regarding Revision to Technical Specification 5.5.8 on the Inservice Testing Program ML0627804522006-10-0505 October 2006 Technical Specification Pages - Issuance of Amendment Revise Containment Sump Surveillance Requirement to Verify Strainer Integrity ML0624201502006-08-29029 August 2006 Techncial Specification, Addition of Surveillance Requirement 3.3.1.16 to TS Table 3.3.1.16 WM 06-0033, Revision to Technical Specification (TS) 3.7.2, Main Steam Isolation Valves (Msivs), and TS 3.7.3, Main Feedwater Isolation Valves (Mfivs).2006-08-25025 August 2006 Revision to Technical Specification (TS) 3.7.2, Main Steam Isolation Valves (Msivs), and TS 3.7.3, Main Feedwater Isolation Valves (Mfivs). 2023-03-09 Category:Bases Change MONTHYEARML23068A1232023-03-0909 March 2023
[Table view]Changes to Technical Specification Bases Revisions 91 and 92 ET 22-0006, Operating Corp. - Application to Revise Technical Specifications to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2022-12-0101 December 2022 Operating Corp. - Application to Revise Technical Specifications to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ET 22-0012, Supplement to License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating2022-07-12012 July 2022 Supplement to License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating ML22067A0302022-03-0808 March 2022 Changes to Technical Specification Bases - Revisions 86, 87, 88, 89, and 90 ML21070A0582021-03-11011 March 2021 Changes to Technical Specification Bases - Revisions 82, 83, 84, and 85 WO 20-0050, License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange2020-11-10010 November 2020 License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange ET 20-0004, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2020-04-27027 April 2020 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) WO 20-0029, License Amendment Request to Revise Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2020-04-20020 April 2020 License Amendment Request to Revise Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML20070L9822020-03-0202 March 2020 Changes to Technical Specification Bases - Revisions 80 and 81 ET 19-0002, License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation.2019-03-18018 March 2019 License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation. ML19078A1302019-03-11011 March 2019 Changes to Technical Specification Bases - Revisions 78 and 79 WO 19-0013, Supplement to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 42019-03-11011 March 2019 Supplement to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4 WO 18-0044, Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-11-15015 November 2018 Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ML18075A0242018-03-0808 March 2018 Changes to Technical Specification Bases - Revisions 76 and 77 ML17073A0932017-03-0909 March 2017 Changes to Technical Specification Bases - Revisions 74 and 75 ML17054C2212017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Revised Technical Specification Pages ML17054C2202017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Proposed Technical Specification Changes ML17054C2222017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Proposed Technical Specification Bases Changes WO 15-0051, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.10 and 3.8.1.142015-09-23023 September 2015 License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.10 and 3.8.1.14 ML15077A0662015-03-11011 March 2015 Changes to Technical Specification Bases, Revisions 61 Through 66 WO 14-0092, Submittal of Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report2014-12-15015 December 2014 Submittal of Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report ET 13-0028, Application to Revise Technical Specifications to Replace a Methodology to TS 5.6.5, Core Operating Limits Report.2013-09-23023 September 2013 Application to Revise Technical Specifications to Replace a Methodology to TS 5.6.5, Core Operating Limits Report. ET 13-0023, License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis2013-08-13013 August 2013 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis ML13079A0602013-03-0808 March 2013 Changes to Technical Specification Bases - Revisions 55 and 56 ML12080A2162012-03-12012 March 2012 Changes to Technical Specification Bases - Revisions 50 Through 54 ML1107500362011-03-10010 March 2011 Changes to Technical Specification Bases - Revisions 45 Through 49 ML1007801282010-03-11011 March 2010 Changes to Technical Specification Bases - Revisions 41 Through 44 ML1006401412010-03-0404 March 2010 Supplemental Information for Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, Auxiliary Feedwater - Trip of All Main Feedwater Pumps ET 10-0011, Supplemental Information for Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, Auxiliary Feedwater - Trip of All Main Feedwater Pumps2010-03-0404 March 2010 Supplemental Information for Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, Auxiliary Feedwater - Trip of All Main Feedwater Pumps ML1006400442010-03-0303 March 2010 Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, Auxiliary Feedwater - Trip of All Main Feedwater Pumps WO 09-0022, Request for Approval of Changes to the Technical Specification 3.8.1, AC Sources - Operating, Bases2009-09-0303 September 2009 Request for Approval of Changes to the Technical Specification 3.8.1, AC Sources - Operating, Bases ML0907506242009-03-11011 March 2009 Submittal of Changes to Technical Specification Bases - Revisions 36 Through 40 ET 08-0041, Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation.2008-08-14014 August 2008 Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation. ML0807805602008-03-0707 March 2008 Changes to Technical Specification Bases - Revisions 32 Through 35 ML0707402282007-03-0909 March 2007 Changes to Technical Specification Bases - Revisions 24 Through 31 WM 06-0033, Revision to Technical Specification (TS) 3.7.2, Main Steam Isolation Valves (Msivs), and TS 3.7.3, Main Feedwater Isolation Valves (Mfivs).2006-08-25025 August 2006 Revision to Technical Specification (TS) 3.7.2, Main Steam Isolation Valves (Msivs), and TS 3.7.3, Main Feedwater Isolation Valves (Mfivs). ML0607602412006-03-0808 March 2006 Changes to Technical Specification Bases - Revisions 20 Through 23 ML0531401852005-11-0303 November 2005 Application for Technical Specification Improvement Re Steam Generator Tube Integrity Using the Consolidated Line Item Improvement Process ET 05-0007, Request for Approval of Changes to the Reactor Coolant System Leakage Detection Instrumentation Methodology2005-08-26026 August 2005 Request for Approval of Changes to the Reactor Coolant System Leakage Detection Instrumentation Methodology ML0507704152005-03-10010 March 2005 Changes to Technical Specification Bases - Revisions 17 Through 19 WO 04-0013, Supporting Information for the Revision to Technical Specifications 3.8.1, AC Sources - Operating, and 3.8.4, DC Sources - Operating.2004-04-13013 April 2004 Supporting Information for the Revision to Technical Specifications 3.8.1, AC Sources - Operating, and 3.8.4, DC Sources - Operating. ML0407807542004-03-11011 March 2004 Changes to Technical Specifications Bases - Revisions 14-16 WO 03-0059, Application for Amendment for Revision to Technical Specification 3.3.1, Reactor Trip System Instrumentation, and Technical Specification 3.3.2, Engineered Safety Feature Actuation System Instrumentation (Common Stars License Amendment.)2003-12-15015 December 2003 Application for Amendment for Revision to Technical Specification 3.3.1, Reactor Trip System Instrumentation, and Technical Specification 3.3.2, Engineered Safety Feature Actuation System Instrumentation (Common Stars License Amendment.) ML0307801372003-03-10010 March 2003 Docket 50-482: Wolf Creek Generating Station Changes to TS Bases - Revisions 9 Through 13 ET 02-0033, Revision to Technical Specification 3.1.6, Physics Tests Exceptions - Mode 2.2002-10-0101 October 2002 Revision to Technical Specification 3.1.6, Physics Tests Exceptions - Mode 2. ET 02-0015, Changes to Technical Specification Bases - Revisions 6 Through 82002-03-0101 March 2002 Changes to Technical Specification Bases - Revisions 6 Through 8 2023-03-09 |
Retrieved from "https://kanterella.com/w/index.php?title=ML17073A093&oldid=335167"