Category:Letter type:ET
MONTHYEARET 23-0006, CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components2023-05-17017 May 2023 CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components ET 23-0005, 10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peen2023-03-16016 March 2023 10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened ET 23-0003, License Amendment Request (LAR) for Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications2023-03-0101 March 2023 License Amendment Request (LAR) for Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications ET 23-0002, Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2023-02-0707 February 2023 Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ET 23-0004, Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements2023-01-26026 January 2023 Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ET 22-0006, Operating Corp. - Application to Revise Technical Specifications to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2022-12-0101 December 2022 Operating Corp. - Application to Revise Technical Specifications to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ET 22-0010, License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements2022-08-0202 August 2022 License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ET 22-0012, Supplement to License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating2022-07-12012 July 2022 Supplement to License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating ET 22-0011, Withdrawal of 10 CFR 50.55a Request I4R-08, Relief for Extension of Follow-up Examination and Visual Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surface2022-05-31031 May 2022 Withdrawal of 10 CFR 50.55a Request I4R-08, Relief for Extension of Follow-up Examination and Visual Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surface ET 22-0005, Response to Request for Additional Information Regarding License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating2022-04-13013 April 2022 Response to Request for Additional Information Regarding License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating ET 22-0003, CFR 50.55a Request I4R-09 for the Fourth Inservice Inspection Program Interval, Relief from Examination of Reactor Vessel Flange Threads2022-04-0606 April 2022 CFR 50.55a Request I4R-09 for the Fourth Inservice Inspection Program Interval, Relief from Examination of Reactor Vessel Flange Threads ET 22-0002, Operating Corp 10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination and Visual Examination Requirements for Reactor Pressure Vessel Head .2022-04-0404 April 2022 Operating Corp 10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination and Visual Examination Requirements for Reactor Pressure Vessel Head . ET 22-0004, Operating Corp - Response to Request for Confirmation of Information (RCI) Regarding Steam Generator Tube Inspection Report2022-03-15015 March 2022 Operating Corp - Response to Request for Confirmation of Information (RCI) Regarding Steam Generator Tube Inspection Report ET 22-0001, Removal of the Table of Contents from the Technical Specifications2022-01-12012 January 2022 Removal of the Table of Contents from the Technical Specifications ET 21-0017, Response to Request for Additional Information Regarding License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation2021-12-22022 December 2021 Response to Request for Additional Information Regarding License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ET 21-0009, Results of the Steam Generator Tube Inservice Inspection During the 24th Refueling Outage2021-11-0101 November 2021 Results of the Steam Generator Tube Inservice Inspection During the 24th Refueling Outage ET 21-0015, Withdrawal of License Amendment Request for a Risk-Informed Resolution to GSI-1912021-10-20020 October 2021 Withdrawal of License Amendment Request for a Risk-Informed Resolution to GSI-191 ET 21-0012, Supplement to License Amendment Request for a Risk-Informed Resolution to GSI-1912021-10-11011 October 2021 Supplement to License Amendment Request for a Risk-Informed Resolution to GSI-191 ET 21-0004, License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating2021-09-29029 September 2021 License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating ET 21-0010, License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation2021-09-29029 September 2021 License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ET 21-0005, Operating Corp., License Amendment Request for a Risk-Informed Resolution to GSI-1912021-08-12012 August 2021 Operating Corp., License Amendment Request for a Risk-Informed Resolution to GSI-191 ET 20-0013, Response to Request for Additional Information Re Application for Technical Specification Change Re Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program (TSTF-415)2020-10-26026 October 2020 Response to Request for Additional Information Re Application for Technical Specification Change Re Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program (TSTF-415) ET 20-0011, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2020-10-0101 October 2020 Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ET 20-0007, License Amendment Request for Replacement of Engineered Safety Features Transformers with New Transformers That Have Active Automatic Load Tap Changers2020-06-0808 June 2020 License Amendment Request for Replacement of Engineered Safety Features Transformers with New Transformers That Have Active Automatic Load Tap Changers ET 20-0008, Operating Corporation Update for Full Implementation of Open Phase Detection System2020-05-20020 May 2020 Operating Corporation Update for Full Implementation of Open Phase Detection System ET 20-0004, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2020-04-27027 April 2020 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) ET 20-0002, Response to Request for Additional Information Regarding Utilizing Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 12020-01-29029 January 2020 Response to Request for Additional Information Regarding Utilizing Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 1 ET 19-0021, Errata for Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation2019-12-0909 December 2019 Errata for Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation ET 19-0020, Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation2019-11-13013 November 2019 Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation ET 19-0019, Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation.2019-09-10010 September 2019 Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation. ET 19-0018, Supplement to License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation.2019-08-22022 August 2019 Supplement to License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation. ET 19-0014, lnserv1ce Inspection (ISI) Program Relief Request Number 14R-07, to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, D1v1s1on 12019-08-15015 August 2019 lnserv1ce Inspection (ISI) Program Relief Request Number 14R-07, to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, D1v1s1on 1 ET 19-0002, License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation.2019-03-18018 March 2019 License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation. ET 19-0008, Response to Request for Additional Information Related to Thermal Conductivity Degradation for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption.2019-03-0505 March 2019 Response to Request for Additional Information Related to Thermal Conductivity Degradation for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption. ET 19-0003, License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Remove Use of a Blind Flange2019-02-25025 February 2019 License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Remove Use of a Blind Flange ET 19-0001, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 42019-01-23023 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4 ET 18-0032, Operating Corporation Change of Date for Full Implementation of Open Phase Detection System2018-12-0707 December 2018 Operating Corporation Change of Date for Full Implementation of Open Phase Detection System ET 18-0035, Operating Corp., Supplemental Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-12-0606 December 2018 Operating Corp., Supplemental Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ET 18-0029, (WCGS) - Results of the Twenty First Steam Generator Tube Inservice Inspection2018-10-31031 October 2018 (WCGS) - Results of the Twenty First Steam Generator Tube Inservice Inspection ET 18-0018, Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-06-19019 June 2018 Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ET 18-0016, Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools Request for Supplemental Information2018-05-29029 May 2018 Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools Request for Supplemental Information ET 18-0014, Response to Request for Additional Information Regarding the License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System.2018-05-29029 May 2018 Response to Request for Additional Information Regarding the License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System. ET 18-0013, Relief Request Number I4R-06, Request for Relief from ASME Code Case N-729-4 for Reactor Vessel Head Penetration Nozzle Weld2018-05-0202 May 2018 Relief Request Number I4R-06, Request for Relief from ASME Code Case N-729-4 for Reactor Vessel Head Penetration Nozzle Weld ET 18-0011, (WCGS) - Guarantee of Payment of Deferred Premiums2018-04-30030 April 2018 (WCGS) - Guarantee of Payment of Deferred Premiums ET 18-0012, Operating Corp., Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-04-19019 April 2018 Operating Corp., Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ET 18-0010, Financial Protection Levels2018-03-29029 March 2018 Financial Protection Levels ET 18-0007, Supplement to License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System.2018-02-15015 February 2018 Supplement to License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System. ET 18-0005, Withdrawal of License Amendment Request for Revision to the Emergency Plan2018-02-0505 February 2018 Withdrawal of License Amendment Request for Revision to the Emergency Plan ET 18-0004, Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-01-29029 January 2018 Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ET 17-0025, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term2017-11-14014 November 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term 2023-05-17
[Table view] Category:Technical Specification
MONTHYEARML23320A2772023-11-16016 November 2023 License Amendment Request to Revise Ventilation Filter Testing Program Criteria in Technical Specification 5.5.11.b and Administrative Correction of Absorber in Technical Specification 5.5.11 ML23068A1232023-03-0909 March 2023 Changes to Technical Specification Bases Revisions 91 and 92 ET 23-0002, Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2023-02-0707 February 2023 Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML22353A5552022-12-15015 December 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements ET 22-0006, Operating Corp. - Application to Revise Technical Specifications to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2022-12-0101 December 2022 Operating Corp. - Application to Revise Technical Specifications to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ET 22-0012, Supplement to License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating2022-07-12012 July 2022 Supplement to License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating ML22067A0302022-03-0808 March 2022 Changes to Technical Specification Bases - Revisions 86, 87, 88, 89, and 90 ML21070A0582021-03-11011 March 2021 Changes to Technical Specification Bases - Revisions 82, 83, 84, and 85 WO 20-0050, License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange2020-11-10010 November 2020 License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange ET 20-0004, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2020-04-27027 April 2020 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) WO 20-0029, License Amendment Request to Revise Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2020-04-20020 April 2020 License Amendment Request to Revise Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML20070L9822020-03-0202 March 2020 Changes to Technical Specification Bases - Revisions 80 and 81 ET 19-0002, License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation.2019-03-18018 March 2019 License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation. ML19078A1302019-03-11011 March 2019 Changes to Technical Specification Bases - Revisions 78 and 79 WO 19-0013, Supplement to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 42019-03-11011 March 2019 Supplement to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4 WO 18-0044, Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-11-15015 November 2018 Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ML18075A0242018-03-0808 March 2018 Changes to Technical Specification Bases - Revisions 76 and 77 WO 18-0004, Response to Request for Additional Information Re License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of ...2018-01-15015 January 2018 Response to Request for Additional Information Re License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of ... ML17073A0932017-03-0909 March 2017 Changes to Technical Specification Bases - Revisions 74 and 75 ML17054C2212017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Revised Technical Specification Pages ML17054C2222017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Proposed Technical Specification Bases Changes ML17054C2202017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Proposed Technical Specification Changes ML16076A3572016-03-10010 March 2016 Changes to Technical Specification Bases - Revisions 67 Through 73 WO 15-0051, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.10 and 3.8.1.142015-09-23023 September 2015 License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.10 and 3.8.1.14 ML15077A0662015-03-11011 March 2015 Changes to Technical Specification Bases, Revisions 61 Through 66 WO 14-0092, Submittal of Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report2014-12-15015 December 2014 Submittal of Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report ET 13-0028, Application to Revise Technical Specifications to Replace a Methodology to TS 5.6.5, Core Operating Limits Report.2013-09-23023 September 2013 Application to Revise Technical Specifications to Replace a Methodology to TS 5.6.5, Core Operating Limits Report. ET 13-0023, License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis2013-08-13013 August 2013 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis ML13079A0602013-03-0808 March 2013 Changes to Technical Specification Bases - Revisions 55 and 56 ML12080A2162012-03-12012 March 2012 Changes to Technical Specification Bases - Revisions 50 Through 54 WO 11-0086, Application to Revise Technical Specification (TS) 3.8.1, AC Sources - Operating2011-11-30030 November 2011 Application to Revise Technical Specification (TS) 3.8.1, AC Sources - Operating ML1107500362011-03-10010 March 2011 Changes to Technical Specification Bases - Revisions 45 Through 49 ML1007801282010-03-11011 March 2010 Changes to Technical Specification Bases - Revisions 41 Through 44 ML1006401412010-03-0404 March 2010 Supplemental Information for Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, Auxiliary Feedwater - Trip of All Main Feedwater Pumps ET 10-0011, Supplemental Information for Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, Auxiliary Feedwater - Trip of All Main Feedwater Pumps2010-03-0404 March 2010 Supplemental Information for Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, Auxiliary Feedwater - Trip of All Main Feedwater Pumps ML1006400442010-03-0303 March 2010 Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, Auxiliary Feedwater - Trip of All Main Feedwater Pumps ET 09-0025, Revision to Technical Specification (TS) 5.5.9, Steam Generator (SG) Program, and TS 5.6.10, Steam Generator Tube Inspection Report2009-09-15015 September 2009 Revision to Technical Specification (TS) 5.5.9, Steam Generator (SG) Program, and TS 5.6.10, Steam Generator Tube Inspection Report WO 09-0022, Request for Approval of Changes to the Technical Specification 3.8.1, AC Sources - Operating, Bases2009-09-0303 September 2009 Request for Approval of Changes to the Technical Specification 3.8.1, AC Sources - Operating, Bases ML0907506242009-03-11011 March 2009 Submittal of Changes to Technical Specification Bases - Revisions 36 Through 40 WO 08-0019, Application to Revise Technical Specification 3.5.2, ECCS-Operating, in Accordance with TSTF-325-A2008-08-18018 August 2008 Application to Revise Technical Specification 3.5.2, ECCS-Operating, in Accordance with TSTF-325-A ET 08-0041, Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation.2008-08-14014 August 2008 Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation. ML0811201492008-04-29029 April 2008 Corrected Technical Specification Pages, Amendment No. 177 Revision to Technical Specification 3.7.3, Main Feedwater Isolation Valves, to Add Main Feedwater Regulating Valves and MFRV Bypass Valves ML0807805602008-03-0707 March 2008 Changes to Technical Specification Bases - Revisions 32 Through 35 ML0804501852008-02-28028 February 2008 Withdrawal of License Amendment Request on Steam Generator Tube Inspections WO 08-0001, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process2008-01-15015 January 2008 Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0707402282007-03-0909 March 2007 Changes to Technical Specification Bases - Revisions 24 Through 31 ML0631905352006-11-15015 November 2006 Tech Spec Pages for Issuance of License Amendment 172 Regarding Revision to Technical Specification 5.5.8 on the Inservice Testing Program ML0627804522006-10-0505 October 2006 Technical Specification Pages - Issuance of Amendment Revise Containment Sump Surveillance Requirement to Verify Strainer Integrity ML0624201502006-08-29029 August 2006 Techncial Specification, Addition of Surveillance Requirement 3.3.1.16 to TS Table 3.3.1.16 WM 06-0033, Revision to Technical Specification (TS) 3.7.2, Main Steam Isolation Valves (Msivs), and TS 3.7.3, Main Feedwater Isolation Valves (Mfivs).2006-08-25025 August 2006 Revision to Technical Specification (TS) 3.7.2, Main Steam Isolation Valves (Msivs), and TS 3.7.3, Main Feedwater Isolation Valves (Mfivs). 2023-03-09
[Table view] Category:Bases Change
MONTHYEARML23068A1232023-03-0909 March 2023 Changes to Technical Specification Bases Revisions 91 and 92 ET 22-0006, Operating Corp. - Application to Revise Technical Specifications to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2022-12-0101 December 2022 Operating Corp. - Application to Revise Technical Specifications to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ET 22-0012, Supplement to License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating2022-07-12012 July 2022 Supplement to License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating ML22067A0302022-03-0808 March 2022 Changes to Technical Specification Bases - Revisions 86, 87, 88, 89, and 90 ML21070A0582021-03-11011 March 2021 Changes to Technical Specification Bases - Revisions 82, 83, 84, and 85 WO 20-0050, License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange2020-11-10010 November 2020 License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange ET 20-0004, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2020-04-27027 April 2020 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) WO 20-0029, License Amendment Request to Revise Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2020-04-20020 April 2020 License Amendment Request to Revise Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML20070L9822020-03-0202 March 2020 Changes to Technical Specification Bases - Revisions 80 and 81 ET 19-0002, License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation.2019-03-18018 March 2019 License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation. ML19078A1302019-03-11011 March 2019 Changes to Technical Specification Bases - Revisions 78 and 79 WO 19-0013, Supplement to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 42019-03-11011 March 2019 Supplement to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4 WO 18-0044, Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-11-15015 November 2018 Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ML18075A0242018-03-0808 March 2018 Changes to Technical Specification Bases - Revisions 76 and 77 ML17073A0932017-03-0909 March 2017 Changes to Technical Specification Bases - Revisions 74 and 75 ML17054C2212017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Revised Technical Specification Pages ML17054C2202017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Proposed Technical Specification Changes ML17054C2222017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Proposed Technical Specification Bases Changes WO 15-0051, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.10 and 3.8.1.142015-09-23023 September 2015 License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.10 and 3.8.1.14 ML15077A0662015-03-11011 March 2015 Changes to Technical Specification Bases, Revisions 61 Through 66 WO 14-0092, Submittal of Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report2014-12-15015 December 2014 Submittal of Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report ET 13-0028, Application to Revise Technical Specifications to Replace a Methodology to TS 5.6.5, Core Operating Limits Report.2013-09-23023 September 2013 Application to Revise Technical Specifications to Replace a Methodology to TS 5.6.5, Core Operating Limits Report. ET 13-0023, License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis2013-08-13013 August 2013 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis ML13079A0602013-03-0808 March 2013 Changes to Technical Specification Bases - Revisions 55 and 56 ML12080A2162012-03-12012 March 2012 Changes to Technical Specification Bases - Revisions 50 Through 54 ML1107500362011-03-10010 March 2011 Changes to Technical Specification Bases - Revisions 45 Through 49 ML1007801282010-03-11011 March 2010 Changes to Technical Specification Bases - Revisions 41 Through 44 ML1006401412010-03-0404 March 2010 Supplemental Information for Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, Auxiliary Feedwater - Trip of All Main Feedwater Pumps ET 10-0011, Supplemental Information for Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, Auxiliary Feedwater - Trip of All Main Feedwater Pumps2010-03-0404 March 2010 Supplemental Information for Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, Auxiliary Feedwater - Trip of All Main Feedwater Pumps ML1006400442010-03-0303 March 2010 Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, Auxiliary Feedwater - Trip of All Main Feedwater Pumps WO 09-0022, Request for Approval of Changes to the Technical Specification 3.8.1, AC Sources - Operating, Bases2009-09-0303 September 2009 Request for Approval of Changes to the Technical Specification 3.8.1, AC Sources - Operating, Bases ML0907506242009-03-11011 March 2009 Submittal of Changes to Technical Specification Bases - Revisions 36 Through 40 ET 08-0041, Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation.2008-08-14014 August 2008 Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation. ML0807805602008-03-0707 March 2008 Changes to Technical Specification Bases - Revisions 32 Through 35 ML0707402282007-03-0909 March 2007 Changes to Technical Specification Bases - Revisions 24 Through 31 WM 06-0033, Revision to Technical Specification (TS) 3.7.2, Main Steam Isolation Valves (Msivs), and TS 3.7.3, Main Feedwater Isolation Valves (Mfivs).2006-08-25025 August 2006 Revision to Technical Specification (TS) 3.7.2, Main Steam Isolation Valves (Msivs), and TS 3.7.3, Main Feedwater Isolation Valves (Mfivs). ML0607602412006-03-0808 March 2006 Changes to Technical Specification Bases - Revisions 20 Through 23 ML0531401852005-11-0303 November 2005 Application for Technical Specification Improvement Re Steam Generator Tube Integrity Using the Consolidated Line Item Improvement Process ET 05-0007, Request for Approval of Changes to the Reactor Coolant System Leakage Detection Instrumentation Methodology2005-08-26026 August 2005 Request for Approval of Changes to the Reactor Coolant System Leakage Detection Instrumentation Methodology ML0507704152005-03-10010 March 2005 Changes to Technical Specification Bases - Revisions 17 Through 19 WO 04-0013, Supporting Information for the Revision to Technical Specifications 3.8.1, AC Sources - Operating, and 3.8.4, DC Sources - Operating.2004-04-13013 April 2004 Supporting Information for the Revision to Technical Specifications 3.8.1, AC Sources - Operating, and 3.8.4, DC Sources - Operating. ML0407807542004-03-11011 March 2004 Changes to Technical Specifications Bases - Revisions 14-16 WO 03-0059, Application for Amendment for Revision to Technical Specification 3.3.1, Reactor Trip System Instrumentation, and Technical Specification 3.3.2, Engineered Safety Feature Actuation System Instrumentation (Common Stars License Amendment.)2003-12-15015 December 2003 Application for Amendment for Revision to Technical Specification 3.3.1, Reactor Trip System Instrumentation, and Technical Specification 3.3.2, Engineered Safety Feature Actuation System Instrumentation (Common Stars License Amendment.) ML0307801372003-03-10010 March 2003 Docket 50-482: Wolf Creek Generating Station Changes to TS Bases - Revisions 9 Through 13 ET 02-0033, Revision to Technical Specification 3.1.6, Physics Tests Exceptions - Mode 2.2002-10-0101 October 2002 Revision to Technical Specification 3.1.6, Physics Tests Exceptions - Mode 2. ET 02-0015, Changes to Technical Specification Bases - Revisions 6 Through 82002-03-0101 March 2002 Changes to Technical Specification Bases - Revisions 6 Through 8 2023-03-09
[Table view] |
Text
WLF CREEK 'NUCLEAR OPERATING CORPORATION John P. Broschak September 23, 2013 Vice President Engineering ET 13-0028 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Subject:
Docket No. 50-482: Application to Revise Technical Specifications (TS) to Replace a Methodology to TS 5.6.5, "CORE OPERATING LIMITS REPORT (COLR)"
Gentlemen:
Pursuant to 10 CFR 50.90, "Application for amendment of license, construction permit, or early site permit," Wolf Creek Nuclear Operating Corporation (WCNOC) hereby requests an amendment to Renewed Facility Operating License No. NPF-42 for the Wolf Creek Generating Station (WCGS). The proposed amendment revises WCGS Technical Specification (TS) 5.6.5, "CORE OPERATING LIMITS REPORT (COLR)," to replace WCAP-1 1596-P-A, "Qualification of the Phoenix-P/ANC Nuclear Design System for Pressurized Water Reactor Cores," with WCAP-16045-P-A, "Qualification of the Two-Dimensional Transport Code PARAGON," and WCAP-16045-P-A, Addendum 1-A, "Qualification of the NEXUS Nuclear Data Methodology," to determine core operating limits.
Attachments I through IV provide the Description and Assessment, Proposed TS Changes, Revised TS pages, and Proposed COLR Changes, respectively, in support of this amendment request. Attachment IV is provided for information only.
It has been determined that this amendment application does not involve a significant hazard consideration as determined per 10 CFR 50.92, "Issuance of amendment." Pursuant to 10 CFR 50.22, "Criterion for categorical exclusion; identification of licensing and regulatory actions eligible or otherwise not requiring environmental review," Section (b), no environmental impact statement or environmental assessment needs to be prepared in connection with the issuance of this amendment.
4 6o(
66839 / Phone: (620) 364-8831 P.O. Box 411 / Burlington, KS An Equal Opportunity Employer M/F/HC/VET
ET 13-0028 Page 2 of 3 The Plant Safety Review Committee reviewed this amendment application. In accordance with 10 CFR 50.91, "Notice for public comment; State consultation," a copy of this amendment application, with attachments, is being provided to the designated Kansas State official.
WCNOC requests approval of the proposed amendment by December 15, 2014, to support core fuel reload activities for Cycle 21 operation (Spring 2015). It is anticipated that the license amendment, as approved, will be effective upon issuance and will be implemented prior to core reload during Refueling Outage 20. Refueling Outage 20 is currently scheduled to begin in early January 2015.
This letter contains no commitments. If you have any questions concerning this matter, please contact me at (620) 364-4085, or Mr. Michael Westman at (620) 364-4009.
Sincerely, f/~~J~A John P. Broschak JPB/rlt
Attachment:
Evaluation IV Ill Proposed Technical Specification Changes (Markup)
Revised Technical Specification Pages IV Proposed COLR Changes (for information only) cc: T. A. Conley (KDHE), w/a C. F. Lyon (NRC), w/a N. F. O'Keefe (NRC), w/a S. A. Reynolds (NRC), w/a Senior Resident Inspector (NRC), w/a
ET 13-0028 Page 3 of 3 STATE OF KANSAS )
) SS COUNTY OF COFFEY )
John P. Broschak, of lawful age, being first duly sworn upon oath says that he is Vice President Engineering of Wolf Creek Nuclear Operating Corporation; that he has read the foregoing document and knows the contents thereof; that he has executed the same for and on behalf of said Corporation with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.
By Jo . Broschak V' ederesident Engineering SUBSCRIBED and sworn to before me this 23-!day of */O1"1'7be" ,2013.
GAYLE SHEPHEARD1 Aý4JLIJý Notary(public Notary Public - State of Kansas My Appt. Expires D,/,q/,2,)5" J
Expiration Date
Attachment I to ET 13-0028 Page 1 of 9 EVALUATION 1.0
SUMMARY
DESCRIPTION 2.0 DETAILED DESCRIPTION
3.0 TECHNICAL EVALUATION
4.0 REGULATORY EVALUATION
4.1 Applicable Regulatory Requirements/Criteria 4.2 Precedent 4.3 No Significant Hazards Consideration Determination 4.4 Conclusion
5.0 ENVIRONMENTAL CONSIDERATION
6.0 REFERENCES
Attachment I to ET 13-0028 Page 2 of 9 EVALUATION 1.0
SUMMARY
DESCRIPTION Pursuant to 10 CFR 50.90, "Application for amendment of license, construction permit, or early site permit," Wolf Creek Nuclear Operating Corporation (WCNOC) hereby requests an amendment to Renewed Facility Operating License No. NPF-42 for the Wolf Creek Generating Station (WCGS). The proposed amendment revises WCGS Technical Specification (TS) 5.6.5, "CORE OPERATING LIMITS REPORT (COLR)," to replace WCAP-11596-P-A, "Qualification of the Phoenix-P/ANC Nuclear Design System for Pressurized Water Reactor Cores," (Reference
- 1) with WCAP-16045-P-A, "Qualification of the Two-Dimensional Transport Code PARAGON,"
(Reference 2) and WCAP-16045-P-A, Addendum 1-A, "Qualification of the NEXUS Nuclear Data Methodology," (Reference 3) to determine core operating limits. The proposed TS change will allow the methodology of WCAP-16045-P-A and WCAP-16045-P-A, Addendum 1-A, to be utilized for determining the refueling boron concentration for Limiting Condition for Operation (LCO) 3.9.1, "Boron Concentration."
2.0 DETAILED DESCRIPTION Specification 5.6.5, "CORE OPERATING LIMITS REPORT (COLR)," Section b. lists the analytical methods used to determine the core operating limits.
The proposed change would delete the following WCNOC related analytical methods listed in Section b. of Specification 5.6.5:
- 8. WCAP-1 1596-P-A, "Qualification of the Phoenix-P/ANC Nuclear Design System for Pressurized Water Reactor Cores."
The proposed change would add the following analytical methods to those listed in Section b. of Specification 5.6.5:
WCAP-16045-P-A, "Qualification of the Two-Dimensional Transport Code PARAGON."
WCAP-16045-P-A, Addendum 1-A, "Qualification of the NEXUS Nuclear Data Methodology."
Due to the changes described above, the list of analytical methods in Specification 5.6.5 will be renumbered as applicable.
The proposed amendment will allow the methodology of WCAP-1 6045-P-A and WCAP-16045-P-A, Addendum 1-A, to be utilized for determining the refueling boron concentration for LCO 3.9.1, "Boron Concentration." The proposed changes are acceptable since they assure the core operating limits have been calculated in accordance with a Nuclear Regulatory Commission (NRC) approved methodology. Use of this methodology will improve plant safety through more accurate core design capabilities.
Attachment I to ET 13-0028 Page 3 of 9 The addition of the analytical methods by topical report number and title is consistent with Amendment No. 144, (Reference 4). Amendment No. 144 adopted TSTF-363, "Revise Topical Report References in ITS 5.6.5, COLR," and the NRC concluded in the safety evaluation that the proposed change to only list the NRC approved methodology by topical report number and title is acceptable. Additionally, in a letter from the NRC to the TSTF (Reference 5) the NRC indicated that the NRC staff does not intend to backfit licensees that have these travelers (TSTF-363, TSTF-408 or TSTF-419) already in their TSs.
3.0 TECHNICAL EVALUATION
LCO 3.9.1 states:
Boron concentrations of all filled portions of the Reactor Coolant System and the refueling canal, that have direct access to the reactor vessel, shall be maintained within the limit specified in the COLR.
TS Section 5.6.5b. specifies that the analytical methods used to determine the core operating limits shall be previously reviewed and approved by NRC. WCAP-1 1596-P-A, ""Qualification of the Phoenix-P/ANC Nuclear Design System for Pressurized Water Reactor Cores," is the methodology for determining the minimum boron concentration value for LCO 3.9.1.
PHOENIX-P is the neutron transport code traditionally used to provide cross section data as input to the Advanced Nodal Code (ANC) code. The PARAGON computer code is a standalone neutron transport code based on collision probability techniques, and it is approved for use as a standalone lattice physics code and as cross section generation tool for core simulators, such as ANC, for uranium-fuel pressurized water reactors (PWRs). ANC is a core simulator code system, which performs calculations based on nuclear data supplied by a code such as PARAGON or PHOENIX-P. The PARAGON nuclear data methodology was developed as a direct replacement to PHOENIX-P.
WCAP-16045-P-A confirms the qualifications of the PARAGON code both as a standalone transport code and as a substitute for the PHOENIX-P code, the code currently used in the WCGS design, as a nuclear data source for nodal codes. As part of the qualification process, WCAP-16045-P-A includes a comparison of PARAGON predicted values to measured data from several plants. Benchmarking has shown that results from the PARAGON/ANC code package are essentially the same as those obtained from the current PHOENIX-P/ANC system.
WCAP-16045-P-A concludes that the application of PARAGON nuclear data methodology does not result in any undesirable changes in predicted fuel performance or safety analysis results.
The NRC Safety Evaluation (Reference 6) for the PARAGON nuclear data methodology states, in part:
... the staff considers the new PARAGON code to be well qualified as a stand-alone code replacement for the PHOENIX-P lattice code, wherever the PHOENIX-P code is used in NRC-approved methodologies.
WCAP-16045-P-A, Addendum 1-A, "Qualification of the NEXUS Nuclear Data Methodology," is an improvement to the PARAGON computer code. The NEXUS methodology is a re-parameterization of the PARAGON nuclear data output and a new reconstruction approach
Attachment I to ET 13-0028 Page 4 of 9 within the ANC core simulator code to simplify the use of this code system for design use.
NEXUS has been implemented in the PARAGON/ANC code system for design use.
Specifically, the NEXUS methodology has been implemented in the parameterization of PARAGON cross sections for input to ANC and also in ANC to reconstruct those cross sections at specific nodal conditions. Since the NEXUS methodology provides a linkage between PARAGON and ANC, establishing a new code system, while still using PARAGON, both WCAP-16045-P-A and WCAP-16045-P-A, Addendum 1-A are being added to Specification 5.6.5b.
WCAP-16045-P-A, Addendum 1-A, verifies the accuracy of NEXUS for cross section representation. As part of this topical report, different assembly types were calculated using NEXUS, which include the following: both Westinghouse and Combustion Engineering assembly types; U0 2 fuel; and integral fuel burnable absorber (IFBA); wet annular burnable absorber (WABA); and Gd 20 3 burnable absorbers. The k-infinity results from these calculations were compared directly to PARAGON k-infinity results at corresponding conditions. The comparisons demonstrated that the NEXUS cross sections are accurate over the range of temperatures, boron concentrations, and power levels expected to be encountered in PWR core calculations. The NRC Safety Evaluation (Reference 7) for the NEXUS nuclear data methodology states, in part:
The NRC staff has reviewed the TR [Topical Report] submitted by Westinghouse and determined that the NEXUS/ANC code system is adequate to replace the PARAGON/ANC code system wherever the latter is used in NRC-approved methodologies. The NRC staff, furthermore, has determined that NEXUS/ANC is qualified as a stand-alone code system so long as its use is limited by the provisions listed in Section 4.0 of this safety evaluation.
The provisions listed in Section 4.0 state that NEXUS/ANC shall be limited to uranium-fueled PWR applications (that is, not mixed-oxide fuel). TS Specification 4.2.1, "Fuel Assemblies,"
specifies that the reactor shall contain 193 fuel assemblies and each assembly shall consist of a matrix of Zircalloy or ZIRLO clad fuel rods with an initial composition of natural or slightly enriched uranium dioxide (UO 2) as fuel material. A separate licensing action would be required in order to use mixed-oxide fuel. As such, NEXUS/ANC is acceptable for use at WCGS.
WCAP-16045-P-A, Addendum 1-A, brings about a change to the cross section representation used in the overall nuclear design method. The use of WCAP-16045-P-A, Addendum 1-A, for WCGS does not affect the inputs or method(s) for ensuring core subcriticality, both short and long-term post-Loss of Coolant Accident (LOCA), thereby precluding the potential for return to power following a large break LOCA. Since neither the post-LOCA boron source concentration nor heat generation are impacted by the use of Addendum 1-A, the current emergency operating procedure timing for boric acid precipitation and the action time for switching to simultaneous injection will continue to remain valid. Core design specific parameters that are verified each cycle to be conservative with respect to the LOCA inputs and refueling boron concentration, will continue to be calculated using NRC approved methods.
Later versions of the Westinghouse ANC code require cross section data, which is generated using the PARAGON neutron transport code. The NEXUS/ANC system is a version of the PARAGON/ANC system in that all nuclear data is based on PARAGON and only the methods of representing this data in ANC have been changed from the version of PARAGON/ANC
Attachment I to ET 13-0028 Page 5 of 9 described in WCAP-16045-P-A. Therefore, NEXUS methodology will be used as a replacement to the PHOENIX-P methodology when WCNOC moves to a later version of ANC to support the core reload design for Cycle 21 operation (Spring 2015).
The other methodologies used to determine operating limits referenced in the COLR remain applicable with the use of PARAGON and NEXUS. Future changes to the values of the operating limits are controlled by the 10 CFR 50.59 process, may only be developed using NRC approved methodologies, and must remain consistent with all applicable plant safety analysis limits addressed in the Updated Safety Analysis Report (USAR). The consequences of the design basis accidents will continue to be calculated using NRC accepted methodologies.
Assumptions used in the safety analysis are not changed by the use of PARAGON and NEXUS. Safety analysis acceptance criteria are not being altered by the use of PARAGON and NEXUS.
4.0 REGULATORY EVALUATION
4.1 Applicable Regulatory Requirements/Criteria Section 182a of the Atomic Energy Act requires applicants for nuclear power plant operating licenses to include Technical Specifications (TSs) as part of the operating license. The TSs ensure the operational capability of structures, systems, and components that are required to protect the health and safety of the public. The U.S. Nuclear Regulatory Commission's (NRC's) requirements related to the content of the TSs are contained in Section 50.36 of the Title 10 of the Code of FederalRegulations (10 CFR 50.36(c)) which requires that the TSs include items in the following specific categories: (1) safety limits, limiting safety system settings, and limiting control settings; (2) limiting conditions for operation; (3) surveillance requirements; (4) design features; and (5) administrative controls. This license amendment request proposes to replace a one topical report methodology reference with two new methodology references to the CORE OPERATING LIMITS REPORT (COLR) list of NRC-approved methodologies in the Administrative Controls section of the TSs. These methodologies will be used to determine a core operating limit that assures the plant is operated in a safe manner. Therefore, the proposed change meets the requirements of 10 CFR 50.36(c)(5).
The guidance in NRC Generic Letter 88-16, "Removal of Cycle-Specific Parameter Limits from Technical Specifications (Generic Letter 88-16)," indicates that it is acceptable to control reactor physics parameter limits by specifying the calculation methodology. The generic letter indicates that such parameter limits may be removed from TS and placed in a cycle-specific COLR. The COLR is defined in Section 1.1 of the TS and the reporting requirements in Specification 5.6.5 require that a COLR be submitted to the NRC each operating cycle, or each time the COLR is revised. The generic letter also recommended that the TS include a list of references for NRC approved methodologies that are used to generate the cycle-specific core operating limits.
Specification 5.6.5b. identifies the analytical methods used to determine the core operating limits at WCGS. The guidance in the generic letter continues to be met since the proposed change will continue to specify the NRC approved methodologies used to determine the core operating limits.
Attachment I to ET 13-0028 Page 6 of 9 4.2 Precedent On July 17, 2013, the NRC issued Amendment No. 191 to Renewed Facility Operating License No. NPF-2 and Amendment No. 187 to Renewed Facility Operating License No. NPF-8 (Reference 8) for the Joseph M. Farley Nuclear Plant, Units 1 and 2, respectively. This amendment adds a reference to WCAP-16045-P-A, "Qualification of the Two-Dimensional Transport Code PARAGON," and WCAP-16045-P-A, Addendum 1-A, "Qualification of the NEXUS Nuclear Data Methodology," to TS Specification 5.6.5, "CORE OPERATING LIMITS REPORT (COLR)." Since WCGS is a single unit facility, the WCGS TS change is to replace the existing PHOENIX-P methodology with the PARAGON and NEXUS methodology. There is no unavoidable transition period when the current and proposed methodologies are both required for a single unit facility.
4.3 No Significant Hazards Consideration Determination Pursuant to 10 CFR 50.90, "Application for amendment of license, construction permit, or early site permit," Wolf Creek Nuclear Operating Corporation (WCNOC) hereby requests an amendment to Renewed Facility Operating License No. NPF-42 for the Wolf Creek Generating Station (WCGS). The proposed amendment revises WCGS Technical Specification (TS) 5.6.5, "CORE OPERATING LIMITS REPORT (COLR)," to replace WCAP-11596-P-A, "Qualification of the Phoenix-P/ANC Nuclear Design System for Pressurized Water Reactor Cores," with WCAP-16045-P-A, "Qualification of the Two-Dimensional Transport Code PARAGON," and WCAP-16045-P-A, Addendum 1-A, "Qualification of the NEXUS Nuclear Data Methodology," to determine core operating limits. The proposed TS change will allow the methodology of WCAP-16045-P-A and WCAP-16045-P-A, Addendum 1-A, to be utilized for determining the refueling boron concentration for Limiting Condition for Operation (LCO) 3.9.1, "Boron Concentration."
WCNOC has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of amendment," Part 50.92(c) as discussed below:
- 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No The analytical methodologies, which this license amendment proposes for determination of core operating limits, are improvements over the current methodologies in use at WCGS. The NRC staff reviewed and approved these methodologies and concluded that these analytical methods are acceptable as a replacement for the current analytical method. Thus core operating limits determined using the proposed analytical methods continue to assure that the reactor operates safely and, thus, the proposed changes do not involve an increase in the probability of an accident.
Operation of the reactor with core operating limits determined by use of the proposed analytical methods does not increase the reactor power level, does not increase the core fission product inventory, and does not change any transport assumptions. Therefore the
Attachment I to ET 13-0028 Page 7 of 9 proposed methodology and TS changes do not involve a significant increase in the consequences of an accident.
Therefore, it is concluded that this change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No The proposed change provides revised analytical methods for determining core operating limits, and does not change any system functions or maintenance activities. The change does not involve physical alteration of the plant, that is, no new or different type of equipment will be installed. The change does not alter assumptions made in the safety analyses but ensure that the core will operate within safe limits. This change does not create new failure modes or mechanisms that are not identifiable during testing, and no new accident precursors are generated.
Therefore, it is concluded that this change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. Does the proposed change involve a significant reduction in a margin of safety?
Response: No The margin of safety is established through equipment design, operating parameters, and the setpoints at which automatic actions are initiated. The proposed changes do not physically alter safety-related systems, nor does it affect the way in which safety related systems perform their functions. The setpoints at which protective actions are initiated are not altered by the proposed changes. Therefore, sufficient equipment remains available to actuate upon demand for the purpose of mitigating an analyzed event. The proposed analytical methodology is an improvement that allows more accurate modeling of core performance. The NRC has reviewed and approved this methodology for use in lieu of the current methodology; thus, the margin of safety is not reduced due to this change.
Therefore, it is concluded that the proposed change does not involve a significant reduction in a margin of safety.
Based on the above, WCNOC concludes that the proposed change presents no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.
4.4 Conclusion Based on the considerations discussed above, 1) there is a reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner,
- 2) such activities will be conducted in compliance with the Commission's regulations, and 3) the
Attachment I to ET 13-0028 Page 8 of 9 issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
5.0 ENVIRONMENTAL CONSIDERATION
A review has determined that the proposed amendment would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or surveillance requirement. However, the proposed amendment does not involve (i) a significant hazards consideration, (ii) a significant change in the types or a significant increase in the amounts of any effluents that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b),
no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.
6.0 REFERENCES
- 1. WCAP-1 1596-P-A, "Qualification of the Phoenix-P/ANC Nuclear Design System for Pressurized Water Reactor Cores," June 1988.
- 2. WCAP-16045-P-A, "Qualification of the Two-Dimensional Transport Code PARAGON,"
August 2004. ADAMS Accession for WCAP-16045-NP-A: ML042250322.
- 3. WCAP-16045-P-A, Addendum 1-A, "Qualification of the NEXUS Nuclear Data Methodology," August 2007. ADAMS Accession for WCAP 16045-NP-A, Addendum 1-A:
ML053460157.
- 4. NRC letter from J. Donohew to O.L. Maynard, "Wolf Creek Generating Station - Issuance of Ammendment Re: Relocation of Cycle Specific Parameters to the CORE OPERATING LIMITS REPORT (TAC No. MB1638)," March 28, 2003. ADAMS Accession No. ML02018190.
- 5. NRC letter from J. R. Jolicoeur to TSTF, "Implementation Of Travelers TSTF-363, Revision 0, "Revise Topical Report References ITS 5.6.5, COLR [CORE OPERATING LIMITS REPORT]," TSTF-408, Revision 1, "Relocation of LTOP [LOW TEMPERATURE OVERPRESSURE PROTECTION] Enable Temperature and PORV [POWER-OPERATED RELIEF VALVE] Lift Setting to the PTLR [PRESSURE-TEMPERATURE LIMITS REPORT], AND TSTF-419, Revision 0, "Revise PTLR Definition and References in ISTS [IMPROVED STANDARD TECHNICAL SPECIFICATION] 5.6.6, RCS [REACTOR COOLANT SYSTEM] PTLR," August 4, 2011. ADAMS Accession No. ML110660285.
- 6. NRC letter from H. N. Berkow to J. A. Gresham, "Final Safety Evaluation for Westinghouse Topical Report WCAP-16045-P, Revision 0, "Qualification of the Two-Dimensional Transport Code PARAGON" (TAC NO. MB8040)," March 18, 2004. ADAMS Accession No. ML040780402.
Attachment I to ET 13-0028 Page 9 of 9
- 7. NRC letter from H. K. Nieh to J. A. Gresham, "Final Safety Evaluation for Westinghouse Electric Company (Westinghouse) Topical Report (TR) WCAP-16045-P-A, Addendum 1, "Qualification of the NEXUS Nuclear Data Methodology" (TAC NO. MC9606)," February 23, 2007. ADAMS Accession No. ML070320398.
- 8. NRC letter from E. Brown to C. R. Pierce, "Joseph M. Farley Nuclear Plant, Units 1 and 2, Issuance of Amendments Regarding Changes to Nuclear Methodology References (TAC NOS. ME9244 and ME9245)(NL-12-1226)," July 17, 2013. ADAMS Accession No. ML13149A354.
Attachment II to ET 13-0028 Page 1 of 2 PROPOSED TECHNICAL SPECIFICATION CHANGES (MARKUP)
Attachment II to ET 13-0028 Page 2 of 2 Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.5 CORE OPERATING LIMITS REPORT (COLR) (continued)
- 4. WCAP-1 0216-P-A, "Relaxation of Constant Axial Offset Control -
FQ Surveillance Technical Specification."
- 5. WCNOC Topical Report NSAG-007, "Reload Safety Evaluation Methodology for the Wolf Creek Generating Station."
- 6. NRC Safety Evaluation Report dated March 30, 1993, for the "Revision to Technical Specification for Cycle 7."
- 7. WCAP-1 0266-P-A, "The 1981 Version of the Westinghouse ECCS Evaluation Model Using the BASH Code."
- 8. WCAP-1 159G-P-A, "Qualificatpoi of the Plioeiix-PANC Nue r-Besign System for rressurized Weter Reactor Cores."
WCAP 10965-P-A, "ANC: A Westinghouse Advanced Nodal Computer Code."
-1"-WCAP-12610-P-A, "VANTAGE+ Fuel Assembly Reference Core D-? Report."
1 WCAP-8745-P-A, "Design Bases for the Thermal Power AT and U7 Thermal Overtemperature AT Trip Functions."
- c. The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal mechanical limits, core thermal hydraulic limits, Emergency Core Cooling Systems (ECCS) limits, nuclear limits such as SDM, transient analysis limits, and accident analysis limits) of the safety analysis are met.
- d. The COLR, including any midcycle revisions or su elements, shall be (continued)
Wolf Creek- Unit 1 5.0-26 Amendment No. 123, 142, 144, , 58, 1-64, 179
Attachment III to ET 13-0028 Page 1 of 2 REVISED TECHNICAL SPECIFICATION PAGES
Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.5 CORE OPERATING LIMITS REPORT (COLR) (continued)
- 4. WCAP-10216-P-A, "Relaxation of Constant Axial Offset Control -
FQ Surveillance Technical Specification."
- 5. WCNOC Topical Report NSAG-007, "Reload Safety Evaluation Methodology for the Wolf Creek Generating Station."
- 6. NRC Safety Evaluation Report dated March 30, 1993, for the "Revision to Technical Specification for Cycle 7."
- 7. WCAP-1 0266-P-A, "The 1981 Version of the Westinghouse ECCS Evaluation Model Using the BASH Code."
- 8. WCAP-16045-P-A, "Qualification of the Two-Dimensional Transport Code PARAGON."
- 9. WCAP-16045-P-A, Addendum 1-A, "Qualification of the NEXUS Nuclear Data Methodology."
- 10. WCAP 10965-P-A, "ANC: A Westinghouse Advanced Nodal Computer Code."
- 11. WCAP-1 2610-P-A, "VANTAGE+ Fuel Assembly Reference Core Report."
- 12. WCAP-8745-P-A, "Design Bases for the Thermal Power AT and Thermal Overtemperature AT Trip Functions."
- c. The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal mechanical limits, core thermal hydraulic limits, Emergency Core Cooling Systems (ECCS) limits, nuclear limits such as SDM, transient analysis limits, and accident analysis limits) of the safety analysis are met.
- d. The COLR, including any midcycle revisions or supplements, shall be provided upon issuance for each reload cycle to the NRC.
(continued)
Wolf Creek- Unit 1 5.0-26 Amendment No. 123, 142, 144,1 8, 16A4~,7,
Attachment IV to ET 13-0028 Page 1 of 3 PROPOSED COLR CHANGES (for information only)
Attachment IV to ET 13-0028 Page 2 of 3 Wolf Creek Generating Station WNLF CREEK 'NUCLEAR OPERATING CORPORATION Cycle 20-Core Operating Limits Report 2X Revision 0
- 7. WCAP-10266-P-A, Revision 2, "The 1981 Version of the Westinghouse ECCS Evaluation Model Using the BASH Code," March 1987.
NRC letter dated November 13, 1986, "Acceptance for Referencing of Licensing Topical Report WCAP-1 0266 "The 1981 Version of the Westinghouse ECCS Evaluation Model Using the BASH Code.""
WCAP-10266-P-A, Addendum 1, Revision 2, "The 1981 Version of the Westinghouse ECCS Evaluation Model Using the BASH Code Addendum 1:
Power Shape Sensitivity Studies," December 1987.
NRC letter dated September 15, 1987, "Acceptance for Referencing of Addendum 1 to WCAP-1 0266, BASH Power Shape Sensitivity Studies."
WCAP-10266-P-A, Addendum 2, Revision 2, "The 1981 Version of the Westinghouse ECCS Evaluation Model Using the BASH Code Addendum 2:
BASH Methodology Improvements and Reliability Enhancements," May 1988 NRC letter dated January 20, 1988, "Acceptance for Referencing Topical Report Addendum 2 to WCAP-1 0266, Revision 2, "BASH Methodology Improvements and Reliability Enhancements."
- 8. WAA -- A,"Qualicatonof the 2hoEnx-PANeNuclea, Bes,, Systein foi-
"-11596 I ,- ed. -to ate.. ',o s dune
-- R1-08, A - .A - % Q I INSERT A NRC Safety Evaluatio - y 17, 1988, "Ace e-feF-
-Refer-encing of el "Ti rt WCAP1159G - Qualificatioo of the-Pho~1-xPAN I k u~a Desig Sstern for Pr essurized WAterReato Cures7.'
WCAP 10965-P-A, "ANC: A Westinghouse Advanced Nodal Computer Code,"
S September 1988.
NRC letter dated June 23, 1986, "Acceptance for Referencing of Topical Report WCAP 10965-P and WCAP 10966-NP."
-1fO. WCAP-1261 0-P-A, "VANTAGE+ Fuel Assembly Reference Core Report," April 1995.
NRC Safety Evaluation Reports dated July 1, 1991, "Acceptance for Referencing of Topical Report WCAP-12610, 'VANTAGE+ Fuel Assembly Reference Core Report' (TAC NO. 77258)."
NRC Safety Evaluation Report dated September 15, 1994, "Acceptance for Referencing of Topical Report WCAP-12610, Appendix B, Addendum 1,
'Extended Burnup Fuel Design Methodology and ZIRLO Fuel Performance Models' (TAC NO. M86416)."
+17 WCAP-8745-P-A, "Design Bases for the Thermal Overpower AT and Thermal Overtemperature AT Trip Function." September 1986.
NRC Safety Evaluation Report dated April 17, 1986, "Acceptance for Referencing of Licensing Topical Report WCAP-8745(P)/8746(NP), 'Design Bases for the Thermal Overpower AT and Thermal Overtemperature AT Trip Functions."'
Page 15 of 15
Attachment IV to ET 13-0028 Page 3 of 3 INSERT A
- 8. WCAP-16045-P-A, "Qualification of the Two-Dimensional Transport Code PARAGON,"
August 2004.
NRC Safety Evaluation dated March 18, 2004, "Final Safety Evaluation for Westinghouse Topical Report WCAP-16045-P, Revision 0, "Qualification of the Two-Dimensional Transport Code PARAGON."
- 9. WCAP-16045-P-A, Addendum 1-A, "Qualification of the NEXUS Nuclear Data Methodology," August 2007.
NRC Safety Evaluation dated February 23, 2007, "Final Safety Evaluation for Westinghouse Electric Company (Westinghouse) Topical Report (TR) WCAP-16045-P-A, Addendum 1, "Qualification of the NEXUS Nuclear Data Methodology" (TAC NO.
MC9606)."