ML20202G663

From kanterella
Revision as of 16:41, 7 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Informs That Trial Date of 980115 for Employee Who Had Been Charged by Commonwealth of Ms,Will Be Delayed of at Least 2 Weeks or Several Months.Ltr Should Be Disregarded
ML20202G663
Person / Time
Site: MIT Nuclear Research Reactor
Issue date: 12/01/1997
From: Bernard J
NUCLEAR REACTOR LABORATORY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9712100086
Download: ML20202G663 (1)


Text

_ . - _.

NUCLEAR REACTOR LABORATORY AN INTERDEPARTMENTAL CENTER OF MASSACHUSETTS INSTITUTE OF TECHNOLOGY JCtrtN A DLRNARD - '/36 Albany Street, Camtvidge, MA 021394296 Actwat.on Analys4 Director Telefax No (617) 253-7300 Coolant Chemistry orector or noxior owates Tel No 1617) 253 4202 Nuclear Medone Prwiopal Research Eryneer Reactor Engineermg December 1,1997 Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Subjee: Letter from MIT (License No. R 37/ Docket No. 50 20 to US NRC dated November 25,1997.

Gentlemen:

On November 25,1997, the Massachusetts Institute of Technology wrote to the U.S. Nuclear Regulatory Commission to update NRC on the status of legal proceedings concerning an employee who had been chnged by the Commonwealth of Massachusetts, in that letter we stated that a trial date of 15 January 1998 had been tentatively selected. We have now been infomed that a further delay of at least two weeks and quite possibly several months is likely. Accordingly, our letter of November 25. 1997, should be '

disregarded.

Sincerely, ek d ohn A. Bernard, Ph A Director JAB /koe - Q}O

\

~

9712100006 971201 DR ADOCK 05000020-PDR ydu ~eno 3

_ _ _ _ __