|
---|
Category:SAFETY EVALUATION REPORT--LICENSING & RELATED ISSUES
MONTHYEARML20217K9441999-10-15015 October 1999 SER Accepting Util Alternative Proposed Relief Request RR-ENG-2-4 for Second 10-year ISI Interval at Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) ML20217K9151999-10-15015 October 1999 SER Authorizing Util Relief Request RR-ENG-2-3 for Second 10-year ISI Interval of Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) ML20211Q6731999-09-0909 September 1999 Safety Evaluation Accepting First 10-yr Interval ISI Program Plan Request for Relief from ASME Code Case N-498 ML20211P8411999-09-0909 September 1999 Safety Evaluation Supporting Alternative Proposed by Licensee to Surface Exam to Perform Boroscopic VT-1 Visual Exam of Pump Casing Welds within Pump Pits for Welds Covered by Relief Request RR-ENG-24 ML20211P7811999-09-0909 September 1999 SER Approving Second 10-year Interval Inservice Insp Program Plan Relief Request RR-ENG-2-8 (to Use Code Case N-491-2) for South Texas Project,Units 1 & 2 ML20211F4531999-08-24024 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative to Defer Partial First Period Exams of flange-to-shell Weld to Third Period & Perform Required Ultrasonic Exams,Both Manual & Automated,During Third Period ML20211F5111999-08-23023 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative Contained in Request for Relief RR-ENG-30 ML20210D9161999-07-23023 July 1999 Safety Evaluation Accepting Inservice Testing Relief Request RR-56 Re Component Cooling Water & Safety Injection Sys Containment Isolation Check Valve Closure Test Frequency ML20207H6361999-07-0808 July 1999 Safety Evaluation Approving 2nd 10 Yr Interval ISI Program Plan Request to Use ASME Section XI Code Case N-546 for Licenses NPF-76 & NPF-80,respectively ML20195J6871999-06-17017 June 1999 Safety Evaluation Supporting Proposed Alternative Contained in RR-ENG-2-5.Proposed Alternative Authorized Per 10CFR50.55a(a)(3)(i) for 2nd ISI Interval ML20204B2711999-03-15015 March 1999 Safety Evaluation Authorizing 990201 Request to Authorize Alternative to Regulations Per 10CFR50.55a(a)(3)(i) That Would Revise Start of Second 120-month IST Interval to No Later than 011201 ML20203H8361999-02-17017 February 1999 Safety Evaluation Supporting Request for Relief from ASME Code Requirements for Class 3 Piping for Plant ML20202H9621999-02-0303 February 1999 SER Accepting Change to EALs Used in Classification of Emergency Conditions ML20199K7711999-01-21021 January 1999 Safety Evaluation Accepting ISI Program Request for Relief for ASME Cose Repair Requirements for Code Class 3 Piping ML20199G8161999-01-19019 January 1999 SER Accepting Util 970707 Response to NRC 970509 RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers. NRC Finds No Significant Safety Hazards Based on Application of Util Ampacity Derating Methodology ML20198M3431998-12-28028 December 1998 SER Accepting Util Request for Relief from ASME Code Repair Requirements for ASME Code Class 3 Piping for South Texas Project,Unit 2 ML20198B4111998-12-15015 December 1998 Staff Evaluation Rept of Individual Plant Exam of External Events (IPEEE) Submittal on South Texas Project,Units 1 & 2 ML20198B3491998-12-15015 December 1998 Safety Evaluation Accepting Relief Request to Use ASME Section XI Code Cases 2142-1 & 2143-1 for Replacement SGs ML20195B9601998-11-0606 November 1998 Safety Evaluation Accepting Proposed long-term C/As for Assuring Operability of MSSVs ML20195C8581998-11-0505 November 1998 SER Accepting Order Approving Application Re Proposed Corporate Merger of Central & South West Corp & American Electric Power Co,Inc ML20154N3371998-10-15015 October 1998 Safety Evaluation Re Licensee Request for Deviation from Fire Protection Program Incorporating Requirements of Section III.G.2.c of 10CFR50,App R ML20237D4931998-08-21021 August 1998 Safety Evaluation Approving Request to Use ASME Section XI Code Case N-498-1 at STP ML20237D5281998-08-21021 August 1998 Safety Evaluation Re Proposed Increase in Sf Pool Heat Loads for Plant ML20249A1831998-06-11011 June 1998 SER Accepting Request for Temporary Relief from ASME Code, Section XI Requirements,To Repair Flaws in Essential Cooling Water Sys Piping ML20217Q6881998-05-0606 May 1998 Safety Evaluation Accepting Monitoring for Leakage in Normal & Alternate Charging & Auxiliary Spray Lines at STP ML20199D0251997-11-17017 November 1997 SER Accepting Relief Requests for Inservice Testing Program for Pumps & Valves ML20199B2751997-11-0606 November 1997 Safety Evaluation Accepting Methodology for Graded QA Initiative in Operations QA Description for Plant ML20149E0741997-07-14014 July 1997 Safety Evaluation of First ten-year Interval Inservice Insp Program Plan Request to Use ASME Section XI Code Case N-416-1,Houston Lighting & Power Co,South Texas Projects, Units 1 & 2 ML20141A8531997-05-12012 May 1997 Safety Evaluation Accepting Licensee Request to Use ASME Section XI Code Case N-546, Alternative Requirements for Qualification of VT-2 Exam Personnel,Section XI Div 1, for First 10-yr Interval Inservice Insp Program Plan ML20137U3811997-04-0808 April 1997 Safety Evaluation Approving Transfer of Operating Authority to New Operating Company ML20137E4861997-03-24024 March 1997 Safety Evaluation Accepting Revised Response to NRC Bulletion 88-08, Thermal Stresses in Piping Connected to Reactor Coolant Sys, for Plant,Units 1 & 2 ML20132B0561996-12-11011 December 1996 Safety Evaluation Accepting Licensee Structural Integrity & Operability Assessments ML20059B8281993-10-21021 October 1993 SER Granting Relief & Concluding That Code Required Exam Impractical to Perform to Extent Required by Code & That Limited Section XI Surface Exam Provide Results Which Demonstrated to Be Superior or Equivalent to Surface Exam ML20057A0161993-08-31031 August 1993 Safety Evaluation Concluding That Licensee Has Demonstrated That External Events Not Major Contributor to Core Damage Scenarios at Plant ML20056C3231993-05-10010 May 1993 Supplemental SE Accepting Util Responses Re Operator Response Times During Sgtr.Licensee Satisfied All Four Criteria Required to Complete NRC Review ML20127M7241993-01-19019 January 1993 SE Concluding That Relief Requests Submitted on 920507 Are Covered by Rulemaking on 920908,which Was Incorporated Into 10CFR50.55a(b) ML20059N7881990-09-24024 September 1990 Safety Evaluation Accepting Util First 10-yr Inservice Insp Plan ML20248E6151989-09-21021 September 1989 Safety Evaluation Re Deletion of Dynamic Rod Drop Test, Static Rod Cluster Control Assembly (Rcca) Drop & Rcca below-bank Position Measurement Tests.Deletion Acceptable ML20246L6511989-02-22022 February 1989 Sser Accepting Util Efforts Re Action Items 1.a & 1.b of NRC Bulletin 88-011,per NRC Findings of Westinghouse & Plant Audit ML20207M4061988-10-0505 October 1988 Safety Evaluation Granting Util 880308 & 26 Requests to Increase Spent Fuel Pool Capacity Through Use of High Density Storage Racks ML20195G5531988-06-24024 June 1988 Safety Evaluation Accepting Proposed Reracking of Util Spent Fuel Storage Pools from Criticality Standpoint.Enrichment of Fuel to 4.5 Weight % U-235 May Be in Conflict W/ 10CFR51 Table S4 & Should Be Investigated by NRC ML20149M6941988-02-23023 February 1988 Safety Evaluation Supporting Proposals Re Personnel Air Lock Seal Air Sys Isolation ML20207K1081986-12-31031 December 1986 Safety Evaluation Re Cumulative Usage Factor Criterion for Pipe Break Postulation.Proposal Not to Postulate Pipe Breaks for SI Injection Lines & Pressurizer Surge Line Approved, Pending Resolution of Confirmatory Item Re Vibratory Stress ML20154M2201986-03-0707 March 1986 SER Supporting Licensee Mods,Per Generic Ltr 83-28,Item 4.3, Reactor Trip Breaker Automatic Shunt Trip ML20138N8121985-10-30030 October 1985 SER Supporting Util 850717 Response to Generic Ltr 83-28, Items 4.1,4.2.1 & 4.2.2 Re Preventive Maint Program for Reactor Trip Breakers/Maint & Trending ML20134L5551985-07-31031 July 1985 Draft Safety Evaluation Re Elimination of Arbitrary Intermediate Pipe Breaks ML20137G8061985-07-31031 July 1985 Safety Evaluation Supporting Util Proposal for Elimination of Arbitrary Intermediate Pipe Breaks in High Energy Piping Sys from Design Considerations in SRP Section 3.6.2 ML20140B7991977-06-0606 June 1977 Safety Evaluation Supporting Subcompartment Pressure Analysis & Proposed Valve Room Design,Per Low Stress Superpipe Requirements of Branch Technical Position Meb 3-1 Re Protection Against Main Steam or Feedwater Line Breaks 1999-09-09
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K9441999-10-15015 October 1999 SER Accepting Util Alternative Proposed Relief Request RR-ENG-2-4 for Second 10-year ISI Interval at Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) ML20217K9151999-10-15015 October 1999 SER Authorizing Util Relief Request RR-ENG-2-3 for Second 10-year ISI Interval of Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) NOC-AE-000676, Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With ML20217D0531999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20217D0481999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 Colr ML20211P8411999-09-0909 September 1999 Safety Evaluation Supporting Alternative Proposed by Licensee to Surface Exam to Perform Boroscopic VT-1 Visual Exam of Pump Casing Welds within Pump Pits for Welds Covered by Relief Request RR-ENG-24 ML20211P7811999-09-0909 September 1999 SER Approving Second 10-year Interval Inservice Insp Program Plan Relief Request RR-ENG-2-8 (to Use Code Case N-491-2) for South Texas Project,Units 1 & 2 ML20211Q6731999-09-0909 September 1999 Safety Evaluation Accepting First 10-yr Interval ISI Program Plan Request for Relief from ASME Code Case N-498 NOC-AE-000643, Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With ML20212E5191999-08-31031 August 1999 Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment ML20211F4531999-08-24024 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative to Defer Partial First Period Exams of flange-to-shell Weld to Third Period & Perform Required Ultrasonic Exams,Both Manual & Automated,During Third Period ML20211F5111999-08-23023 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative Contained in Request for Relief RR-ENG-30 ML20210C9411999-07-31031 July 1999 Rev 1 to SG-99-07-002, South Tx,Unit 1 Cycle 9 Voltage- Based Repair Criteria 90-Day Rept, Jul 1999 ML20210R3631999-07-31031 July 1999 Monthly Operating Repts for July 1999 for South Tx Project, Units 1 & 2.With ML20210D9161999-07-23023 July 1999 Safety Evaluation Accepting Inservice Testing Relief Request RR-56 Re Component Cooling Water & Safety Injection Sys Containment Isolation Check Valve Closure Test Frequency ML20210D4821999-07-21021 July 1999 1RE08 ISI Summary Rept for Steam Generator Tubing of South Texas Project Electric Generating Station Unit 1 ML20210D4491999-07-21021 July 1999 Revised Chapters to Operations QA Plan, Including Rev 9 to Chapter 1.0, Organization & Rev 6 to Chapter 16.0, Independent Technical Review NOC-AE-000583, LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With1999-07-15015 July 1999 LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With ML20207H6361999-07-0808 July 1999 Safety Evaluation Approving 2nd 10 Yr Interval ISI Program Plan Request to Use ASME Section XI Code Case N-546 for Licenses NPF-76 & NPF-80,respectively ML20216D7481999-07-0707 July 1999 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1 NOC-AE-000593, Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with NOC-AE-000570, LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With1999-06-28028 June 1999 LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With ML20196G5821999-06-23023 June 1999 LER 99-S02-00:on 990601,failure to Maintain Positive Control of Vital Area Security Key Was Noted.Caused by Lack of Attention to Detail.Discussed Event with Operator Involved IAW Constructive Discipline Program ML20195J6871999-06-17017 June 1999 Safety Evaluation Supporting Proposed Alternative Contained in RR-ENG-2-5.Proposed Alternative Authorized Per 10CFR50.55a(a)(3)(i) for 2nd ISI Interval ML20196A2391999-06-15015 June 1999 Change QA-042 to Rev 13 of Operations QAP, Reflecting Current Organizational Alignment for South Texas Project & Culminating Organizational Realigment That Has Been Taking Place During Past Several Months NOC-AE-000563, Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with ML20206U5411999-05-18018 May 1999 Non-proprietary Errata Pages for Rev 2,Addendum 1 to WCAP-13699, Laser Welded Sleeves for 3/4 Inch Diamete Tube Feedring Type & W Preheater SGs Generic Sleeving Rept ML20206A7721999-04-30030 April 1999 STP Electric Generating Station Unit 1 Cycle 9 Colr NOC-AE-000543, Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with ML20205H0321999-03-31031 March 1999 Change QA-040 to Rev 13 of Operations QA Plan NOC-AE-000507, Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with ML20205A3781999-03-22022 March 1999 STP Electric Generating Station Simulator Certification Four Yr Rept for Units 1 & 2 ML20204B2711999-03-15015 March 1999 Safety Evaluation Authorizing 990201 Request to Authorize Alternative to Regulations Per 10CFR50.55a(a)(3)(i) That Would Revise Start of Second 120-month IST Interval to No Later than 011201 ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results NOC-AE-000468, Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With ML20207D1101999-02-24024 February 1999 Change QA-039 to Rev 13 of Operations QA Plan, for STP ML20203H8361999-02-17017 February 1999 Safety Evaluation Supporting Request for Relief from ASME Code Requirements for Class 3 Piping for Plant ML20202H9621999-02-0303 February 1999 SER Accepting Change to EALs Used in Classification of Emergency Conditions ML20202E8471999-01-31031 January 1999 2RE06 ISI Summary Rept for SG Tubing of STP Electric Generating Station,Unit 2 ML20216G2011999-01-31031 January 1999 City Public Svc of San Antonio Annual Rept 1998-1999 ML20199G5961999-01-31031 January 1999 Cycle 7 Voltage-Based Repair Criteria Rept for Jan 1999 ML20199K7711999-01-21021 January 1999 Safety Evaluation Accepting ISI Program Request for Relief for ASME Cose Repair Requirements for Code Class 3 Piping ML20199G8161999-01-19019 January 1999 SER Accepting Util 970707 Response to NRC 970509 RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers. NRC Finds No Significant Safety Hazards Based on Application of Util Ampacity Derating Methodology ML20199H4981999-01-11011 January 1999 2RE06 ISI Summary Rept for Welds & Component Supports of Stp,Unit 2 ML20206Q3751999-01-0404 January 1999 2RE06 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) ML20206Q3721999-01-0404 January 1999 2RE06 ISI Summary Rept for Repairs & Replacements ML20216G2171998-12-31031 December 1998 Houston Industries 1998 Annual Rept. App a 1998 Financial Statements & Us Securities & Exchange Commission Form 10-K Encl NOC-AE-000403, Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With ML20216G1521998-12-31031 December 1998 Central & South West Corp 1998 Summary Annual Rept & Securities & Exchange Commission Form 10-K ML20198M3431998-12-28028 December 1998 SER Accepting Util Request for Relief from ASME Code Repair Requirements for ASME Code Class 3 Piping for South Texas Project,Unit 2 1999-09-09
[Table view] |
Text
- - - _ _ _ _ _ _ - - _ _
y o nog % UNITED STATES t
g j t
NUCLEAR REGULATORY COMMISSION
-i l
WASHINGTON. D.C. 30666 4001 s...../
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION OF THE SECOND 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAM PLAN REQUEST TO USE ASME SECTION XI CODE CASE N-546 STP NUCLEAR OPERATING COMPANY SOUTH TEXAS PROJECT. UNITS 1 AND 2 DOCKET NOS. 50-498 AND 50-499
1.0 INTRODUCTION
The Technical Specifications for the South Texas Project, Units 1 and 2 (STP), state that the inservice inspection (ISI) and testing of the American Society of Mechanical Engineers (ASME)
Code Class 1,2, and 3 components shall be performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable addenda as required by 10 CFR 50.55a(g), except where specific written relief has been granted by the Commission pursuant to 10 CFR 50.55a(g)(6)(i). The regulation at 10 CFR 50.55a(a)(3) states that alternatives to the requirements of paragraph (g) may be used, when authorized by the Nuclear Regulatory Commission, if (i) the proposed alternatives would provide an acceptable level of quality and safety, or (ii) compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Pursuant to 10 CFR 50.55a(g)(4), ASME Code Class 1,2, and 3 components (including supports) shall meet the requirements, except the design and access provisions and the preservice examination requirements, set forth in the ASME Code,Section XI, " Rules for Inservice Inspection of Nuclear Power Plant Components," to the extent practical within the limitations of design, geometry, and materials of construction of the components. The regulations require that inservice examination of components and system pressure tests conducted during the first 10 year interval and subsequent intervals comply with the requirements in the latest edition and addenda of Section XI of the ASME Code incorporated by reference in 10 CFR 50.55a(b) on the date 12 months prior to the start of the 120-month interval, subject to the limitations and modifications listed therein. The applicable edition of Section XI of the ASME Code for STP for the second 10-year ISI interval is the 1989 Edition.
The components (including supports) may meet the requirements set forth in subsequent editions and addenda of the ASME Code incorporated by reference in 10 CFR 50.55a(b) subject to the limitations and modifications listed therein and subject to Commission approval.
Pursuant to 10 CFR 50.55a(g)(5), if the licensee determines that conformance with an examination requirement of Section XI of the ASME Code is not practical for its facility, information shall be submitted to the Commission in support of that determination and a request made for relief from the ASME Code requirement. After evaluation of the determination, pursuant to 10 CFR 50.55a(g)(6)(i), the Commission may grant relief and may impose
. attemative requirements that are determined to be authorized by law, will not endanger life, 9907140014 990708 g' PDR ADOCK 05000498 P PM f Y . .. .. .
% i property, or the common defense and security, and are otherwise in the public interest, giving due consideration to the burden upon the licensee that could result if the requirements were imposed.
By letter dated May 13,1999, the licensee, STP Nuclear Operating Company (STPNOC),
requested approval (Relief Request RR ENG-2-9) for the implementation of the alternative rules of ASME Section XI Code Case N-546 dated August 24,1995, titled " Alternative Requirements for Qualification of VT-2 Examination Personnel,Section XI, Division 1,"
pursuant to 10 CFR 50.55a(a)(3)(i) in lieu of the requirements of IWA-2300 to the ISI program for STP.
The staff has reviewed and evaluated the licensee's request and supporting information to use Code Case N-546 as a proposed alternative to the Code requirements for STP.
2.0 DISCUSSION A. Request for Authorization to implement Alternatives to Code Requirements Contained in Code Case N-546, " Alternative Requirements for Qualification of VT-2 Examination Personnel,Section XI, Division 1."
Code Reauirement: The ASME Code Section XI,1989 Edition, Subsection IWA-2300, " Qualification of Nondestructive Examint. tion Personnel," requires that all personnel performing VT-2 visual examinations be certified to comparable levels of competency defined in ANSI N45.2.6. The VT-2 visual examination is conducted in accordance with ASME Code,Section XI, paragraph IWA-2212 and subarticle IWA 5240 to locate evidence of leakage from pressure-retaining components, or abnormalleakage from components with or without leakage collection system, as required, during the conduct of pressure testing.
Licensee's Code Relief Recuest: The licensee has requested approval to implement alternatives to the Code requirements contained in Code Case N-546, which is not yet approved by the NRC by reference in Regulatory Guide (RG) 1.147.
B. Licensee's Basis for Requesting Relief (as stated):
As stated in Code Case N-546, plant personnel (e.g., licensed and non-licensed operators, system engineers, testing technicians) with the specified training and plant walkdown experience need not be qualified nor certified to comparable l levels of competence in accordance with ANSI N45.2.6.
l Experience in identifying equipment problems and knowledge of i
operating conditions will enhance the ability of plant personnel to locate leakage during VT-2 examinations. With the specified four i
hours of training on Section XI requirements and plant specific procedures for VT 2 examinations, the designated plant personnel will understand how leaks should be identified and documented and be fully capable of performing VT-2 examinations.
w , _ _ _ _ _ _
k Qualifying personnel for VT-2 examinations under Code Case N-546 is less burdensome than qualifying and maintaining the present VT-2 certification. Adopting this Code Case makes it feasible to train more people to perform these tasks.
Furthermore, using personnel who are already required to perform functions in the plant will reduce the number of people required to enter into areas that may be radiologically restricted, resulting in fewer plant workers exposed to potential radiatiore dose and keeping radiation exposure as low as reasonably achievable.
Additionally, use of on-shift personne! will improve the process of returning systerris to service. Prompt return of safety systems to service willimprove the safety of the plant and the public.
C. Licensee's Proposed Alternative to Code Requirements: l The licensee proposes to implement the Code Case N-546 as an alternative to the requirements of IWA-2300 for qualification of VT-2 visual examination personnel as follows-I (a) At least 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> plant walkdown experience, such as that gained by licensed and nonlicensed operators, local leak rate personnel, system engineers, and inspection and )
nondestructive examination personnel; (b) At least four hours of training on Section XI requirements and plant specific procedures for VT-2 visual examination; l and (c) Vision test requirements of IWA-2321,1995 Edition.
D. Liccnsee's Justification The licensee stated that in accordance with 10 CFR 50.55a(a)(3)(i), the proposed alternative qualification requirements will provide an acceptable level of quality and safety. The proposed alternative qualifications are ider,tical to those of ASME Section XI Code Case N-546. STPNOC has received NRC approval tn use Code Case N-546 for the first Unit 1 and Unit 2 IS! interval.
3.0 EVALUATION AND CONCLUSION The Code requires that VT-2 visual examination personnel be qualified to comparable levels of competency as det.ned in ANSI N45.2.6. The Code also requires that the examination personnel be qualified for near and far distance vision acuity.
The staff considers the qualification requiremants in Code Case N 546 to be comparable to those of the ASME Code,Section XI, paragraph IWA-2300 for VT-2 visual examination personnel, in regard to selection of personnel to conduct the test, the Code Case states that
r j e
licensed and nonlicensed operators, local leak rate personnel, system engineers, and inspection and nondestructive examination personnel are eligible due to their plant experience.
Typically, these individuals have sound working knowledge of plant components and piping layouts. Hence, they make good candidates for performing VT-2 visual examinations.
Furthermore, the licensee follows plant-specific procedures to obtain consistent VT-2 visual examination results even with the varied experience levels and potentially different leakage f t
interpretations by employees performing the VT-2 visual examinations. The Code Case further
{
requires a vision test for examination personnel similar to that of the Code.
On the basis of its review of Code Case N 546, the staff has concluded that the alternatives to the Code qualification requirements for examination personnel will provide an acceptable level I of quality and safety in that it will provide adequate leakage detection. Therefore, the licensee's request to implement alternatives contained in Code Case N-546 is authorized pursuant to l 10 CFR 50.55a(a)(3)(i) for the second interval until such time as the Code Case is approved by I reference in RG 1.147. At that time,if the licensee intends to continue to implement this Code Case, the licensee must follow all provisions in Code Case N-546 with the limitations issued in RG 1.147, if any.
Principal Contributcr: R. J. Fretz Date: July 8, 1999 l
l l
l