|
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20211G3041999-08-26026 August 1999 Suppl 981002 to LAR-98-006 to Licenses NPF-87 & NPF-89, Amending Tech Specs 4.0.6, SG Surveillance Requirements Which Provides Tube Insp Requirements & Acceptance Criteria to Determine Level of Degradation ML20210R6881999-08-13013 August 1999 Supplemental Application to License Amend Request LAR 98-010,for Licenses NPF-87 & NPF-89,correcting Existing Errors in Calculations of Original Lar.Revised Ts,Encl ML20209E1781999-07-0909 July 1999 Supplemental Application for LAR 99-002 for Licenses NPF-87 & NPF-89,proposing to Add Reactor Core Safety Limit Figures to Section 5.6.5 (COLR) of TSs TXX-9913, LAR 99-005 to Licenses NPF-87 & NPF-89,revising EDG Start to Emergency Start Instead of Normal Start Following Loss of Offsite Power1999-06-23023 June 1999 LAR 99-005 to Licenses NPF-87 & NPF-89,revising EDG Start to Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5311999-06-0404 June 1999 Supplemental Application for Amend to Licenses NPF-87 & NPF-89,proposing Addl Editorial Corrections.Corrections Are to Be Considered Administrative ML20195B6411999-05-27027 May 1999 LAR 99-004 to Licenses NPF-87 & NPF-89 by Incorporating Attached Change Re Plant Battery Surveillance Into TS ML20195B6571999-05-24024 May 1999 LAR 99-002 to Licenses NPF-87 & NPF-89,adding to COLR & Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206T5231999-05-14014 May 1999 Application for Amends to Licenses NPF-87 & NPF-89,changing Corporate Name of Licensee Texas Utilities Electric Co to Txu Electric Co. Marked-up OL Pages,Encl ML20206G7051999-05-0404 May 1999 LAR 99-001 for Amends to Licenses NPF-87 & NPF-89,revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections TXX-9826, Application for Amends to Licenses NPF-87 & NPF-89,proposing Increase in Licensed Power for Operation of Cpses,Unit 2 to 3445 Mwt (Approx 1%) & Changes Administratively for Unit 1.Supporting TSs & TR WCAP-10263,encl1998-12-21021 December 1998 Application for Amends to Licenses NPF-87 & NPF-89,proposing Increase in Licensed Power for Operation of Cpses,Unit 2 to 3445 Mwt (Approx 1%) & Changes Administratively for Unit 1.Supporting TSs & TR WCAP-10263,encl ML20195F1611998-11-13013 November 1998 LAR 98-08 to Licenses NPF-87 & NPF-89,changing Suppl to LAR 96-06,original Description & Assessment Provided in Ltr Dtd 960802,revised to Reflect Addition of Configuration Risk Mgt Program ML20195F5191998-11-11011 November 1998 LAR 98-007 to Licenses NPF-87 & NPF-89,revising Reactor Trip Setpoint for Cycle 5 ML20154C8971998-10-0202 October 1998 Application for Amends to Licenses NPF-87 & NPF-89,revising TS 4.0.6, SG Sr. Encls Contain Supporting Tss,Proprietary TR WCAP-15004,non-proprietary TR WCAP-15005 & W Proprietary Authorization Ltr.Proprietary Encl,Withheld TXX-9810, LAR 98-005 to Licenses NPF-87 & NPF-89,incorporating Encl Change Into Plant,Units 1 & 2 Ts.Change Is Applicable to Unit 2 & Administrative for Unit 1.Affidavit,encl1998-04-0909 April 1998 LAR 98-005 to Licenses NPF-87 & NPF-89,incorporating Encl Change Into Plant,Units 1 & 2 Ts.Change Is Applicable to Unit 2 & Administrative for Unit 1.Affidavit,encl ML20216B1321998-04-0606 April 1998 Application for Amend to License NPF-89,requesting Enforcement Discretion to Allow Plant to Continue to Operate W/O Having Performed Portions of Listed SRs ML20217A3841998-03-18018 March 1998 LAR 98-004 to Licenses NPF-87 & NPF-89,requesting Enforcement Discretion to Allow Units 1 & 2 to Perform Shutdown Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power ML20248L3161998-03-12012 March 1998 Application for Amends to Licenses NPF-87 & NPF-89,re Enforcement of Discretion & Compliance W/Ts 4.8.1.1.2f ML20216D5841998-03-0909 March 1998 Revised LAR 98-002 for Licenses NPF-87 & NPF-89,temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a), for Unit 2 Only TXX-9803, Application for Amends to Licenses NPF-87 & NPF-89, Increasing RWST low-low Level Setpoint1998-02-27027 February 1998 Application for Amends to Licenses NPF-87 & NPF-89, Increasing RWST low-low Level Setpoint ML20203J4921998-02-25025 February 1998 Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Attached Change Into TS to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements ML20212C3801997-10-24024 October 1997 Application for Amends to Licenses NPF-87 & NPF-89, Incorporating Encl Changes Re Reactor Trip Setpoint for Cycle 7 Into TS TXX-9711, Application for Amends to Licenses NPF-87 & NPF-89, Consisting of Change Request 97-002 Re Rev to Unit 2 Rt Setpoint1997-05-16016 May 1997 Application for Amends to Licenses NPF-87 & NPF-89, Consisting of Change Request 97-002 Re Rev to Unit 2 Rt Setpoint ML20141C9271997-05-15015 May 1997 Application for Amends to Licenses NPF-87 & NPF-89,adding License Conditions to Address SRs Not Previously Performed by Existing Requirements or Tests.Attachments 1-20 Encl ML20116F0421996-08-0202 August 1996 LAR 96-006 to Licenses NPF-87 & NPF-89,increasing Allowed Outage Time for Charging Pump from 72 H to 7 Days ML20116F3561996-07-31031 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,revising Unit 1 Rx Trip Setpoints & Incorporating TU Electric SBLOCA TR on COLR Ts,Applicable to Both Units ML20116E8471996-07-31031 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,modifying Inverter/Battery Chargers by Incorporating Attached Changes Into CPSES Units 1 & 2 TSs ML20115E7991996-07-10010 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,changing TS 3/4.7.11 to Revise Lco,Actions & SRs to Take Credit for Addition of Train Oriented Fan Coil Units for Each UPS & Distribution Room ML20115C9271996-07-0909 July 1996 LAR 96-003 to Licenses NPF-87 & NPF-89,increasing Allowable Value for Steam Line pressure-low for Cpses,Unit 1 ML20113B5831996-06-21021 June 1996 Application for Amends to Licenses NPF-87 & NPF-89,removing Request to Relocate MSIV Full Closure Time Requirement to Program Administratively Controlled by TS & Revising Associated Bases to Include Addl Info TXX-9600, Application for Amends to Licenses NPF-87 & NPF-89,changing TS 3/4.6.1 & Adding TS 6.8.3g to Implement New Containment Leakage Rate Testing Program Required by 10CFR50 App J, Option B1996-03-12012 March 1996 Application for Amends to Licenses NPF-87 & NPF-89,changing TS 3/4.6.1 & Adding TS 6.8.3g to Implement New Containment Leakage Rate Testing Program Required by 10CFR50 App J, Option B ML20100J0611996-02-22022 February 1996 Application for Amends to Licenses NPF-87 & NPF-89,revising TS LCO 3.9.4 to Allow Both Door of Pal to Remain Open If One Is Capable of Being Closed ML20096B3181996-01-0505 January 1996 Application for Amends to Licenses NPF-87 & NPF-89, Consisting of LAR 96-001 Revising TS Re Wide Range RCS Temp.-Th Remote Shutdown Indication.Changes Submitted on CPSES Unit 1 for Administrative Purposes Only TXX-9528, LAR 95-008 to License NPF-87 & NPF-89,incorporating Revised Core Safety Limit Curves & Revised N-16 Overtemp Reactor Trip Setpoints,Resulting from Reload Analyses for CPSES Unit 2,Cycle 31995-11-21021 November 1995 LAR 95-008 to License NPF-87 & NPF-89,incorporating Revised Core Safety Limit Curves & Revised N-16 Overtemp Reactor Trip Setpoints,Resulting from Reload Analyses for CPSES Unit 2,Cycle 3 ML20094N6161995-11-21021 November 1995 Application for Amends to Licenses NPF-87 & NPF-89,allowing Containment Personnel Airlock Doors to Remain Open During Movement of Irradiated Fuel & During Core Alterations for Plant ML20087K1721995-08-15015 August 1995 Requests Amend to Licenses NPF-87 & NPF-89,consisting of Change Request 95-05,moving Shutdown Margin Limits from TS to COLR & Providing Guidelines for Removal of cycle-specific Parameter Limits from TS ML20087J7921995-08-15015 August 1995 LAR 95-04 to Licenses NPF-87 & NPF-89,moving Overtemp N-16 Limits from TS to Colr,Per GL 88-16.Changes in LAR 95-04 Originally Submitted in LAR 95-03 on 950512.LAR 95-03 Being Divided Into Four Separate LARs for Ease in Processing ML20087E2521995-08-11011 August 1995 Suppl to Application for Amends to Licenses NPF-37,NPF-66, NPF-72 & NPF-77,revising TS 3.6.1.7, Containment Purge Ventilation Sys ML20083M8531995-05-12012 May 1995 Application for Amend to Licenses NPF-87 & NPF-89,consisting of LAR 95-03,removing cycle-specific Parameter Limits from Ts,Per GL 88-16 TXX-9509, Application for Amends to Licenses NPF-87 & NPF-89.Amends Would Reduce Min Fuel Oil Vol Requirement During Modes 5 & 6 for Operable EDGs1995-05-0101 May 1995 Application for Amends to Licenses NPF-87 & NPF-89.Amends Would Reduce Min Fuel Oil Vol Requirement During Modes 5 & 6 for Operable EDGs ML20082C6401995-04-0303 April 1995 Suppl to Application for Amends to Licenses NPF-87 & NPF-89 Re Quadrant Power Tilt Ratio TXX-9505, LAR 95-001 to Licenses NPF-87 & NPF-89,changing TS to Address Performance Requirements of Containment Spray Pumps1995-02-28028 February 1995 LAR 95-001 to Licenses NPF-87 & NPF-89,changing TS to Address Performance Requirements of Containment Spray Pumps ML20079B4721994-12-30030 December 1994 LAR 94-022 to Licenses NPF-87 & NPF-89,incorporating Changes to TS to Increase Spent Fuel Storage Capacity.Rev 0 of CPSES Fuel Storage Licensing Rept,Cpses Expansion of Spent Fuel Storage Capacity Encl ML20078R8071994-12-19019 December 1994 Application for Amends to Licenses NPF-87 & NPF-89 to Allow Testing of RPS & ESFAS W/Channel Under Test in Bypass ML20078S0891994-12-19019 December 1994 Application for Amends to Licenses NPF-87 & NPF-89, Requesting Approval of Converted TSs to Format & Content of Improved STSs ML20077F0881994-12-0707 December 1994 License Amend Request 94-020 to Licenses NPF-87 & NPF-89, Revising TS LCO for MSIVs to Increase Allowed Outage Time in Mode 1 & Relocate MSIVs to Full Closure Time Requirement to Program Administratively Controlled ML20077F1951994-12-0606 December 1994 Application for Amends to Licenses NPF-87 & NPF-89, Consisting of LAR 94-021,revising TS to Allow Appropriate Remedial Action for High Particulate Levels in DG Fuel Oil & Other out-of-limit Properties in New DG Fuel Oil ML20077A7071994-11-18018 November 1994 LAR 94-019 to Licenses NPF-87 & NPF-89,removing Accelarated Testing & Special Reporting Requirements for EDGs from TS, Based on GL 94-01 ML20078K7461994-11-18018 November 1994 LAR 94-018 to Licenses NPF-87 & NPF-89,revising TS Re Heat Flux Hot Channel Factor ML20078G7281994-11-11011 November 1994 Application for Amends to Licenses NPF-87 & NPF-89,revising TSs Re Exclusion of Failures from Total Number of Failures Used to Determine Diesel Generator Test Frequency ML20073B6491994-09-19019 September 1994 Application for Amends to Licenses NPF-87 & NPF-89, Incorporating Encl Change Into Licensee Units 1 & 2 TSs 1999-08-26
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20211J4031999-08-27027 August 1999 Errata to Amends 66 & 66 to Licenses NPF-87 & NPF-89, Respectively.Footnote on TS Page 3.8-26 Was Incorrectly Deleted ML20211G3041999-08-26026 August 1999 Suppl 981002 to LAR-98-006 to Licenses NPF-87 & NPF-89, Amending Tech Specs 4.0.6, SG Surveillance Requirements Which Provides Tube Insp Requirements & Acceptance Criteria to Determine Level of Degradation ML20210R6881999-08-13013 August 1999 Supplemental Application to License Amend Request LAR 98-010,for Licenses NPF-87 & NPF-89,correcting Existing Errors in Calculations of Original Lar.Revised Ts,Encl ML20209E1781999-07-0909 July 1999 Supplemental Application for LAR 99-002 for Licenses NPF-87 & NPF-89,proposing to Add Reactor Core Safety Limit Figures to Section 5.6.5 (COLR) of TSs TXX-9913, LAR 99-005 to Licenses NPF-87 & NPF-89,revising EDG Start to Emergency Start Instead of Normal Start Following Loss of Offsite Power1999-06-23023 June 1999 LAR 99-005 to Licenses NPF-87 & NPF-89,revising EDG Start to Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5311999-06-0404 June 1999 Supplemental Application for Amend to Licenses NPF-87 & NPF-89,proposing Addl Editorial Corrections.Corrections Are to Be Considered Administrative ML20195B6411999-05-27027 May 1999 LAR 99-004 to Licenses NPF-87 & NPF-89 by Incorporating Attached Change Re Plant Battery Surveillance Into TS ML20195B6571999-05-24024 May 1999 LAR 99-002 to Licenses NPF-87 & NPF-89,adding to COLR & Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206T5231999-05-14014 May 1999 Application for Amends to Licenses NPF-87 & NPF-89,changing Corporate Name of Licensee Texas Utilities Electric Co to Txu Electric Co. Marked-up OL Pages,Encl ML20206G7051999-05-0404 May 1999 LAR 99-001 for Amends to Licenses NPF-87 & NPF-89,revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections TXX-9826, Application for Amends to Licenses NPF-87 & NPF-89,proposing Increase in Licensed Power for Operation of Cpses,Unit 2 to 3445 Mwt (Approx 1%) & Changes Administratively for Unit 1.Supporting TSs & TR WCAP-10263,encl1998-12-21021 December 1998 Application for Amends to Licenses NPF-87 & NPF-89,proposing Increase in Licensed Power for Operation of Cpses,Unit 2 to 3445 Mwt (Approx 1%) & Changes Administratively for Unit 1.Supporting TSs & TR WCAP-10263,encl ML20195F1611998-11-13013 November 1998 LAR 98-08 to Licenses NPF-87 & NPF-89,changing Suppl to LAR 96-06,original Description & Assessment Provided in Ltr Dtd 960802,revised to Reflect Addition of Configuration Risk Mgt Program ML20195F5191998-11-11011 November 1998 LAR 98-007 to Licenses NPF-87 & NPF-89,revising Reactor Trip Setpoint for Cycle 5 ML20154C8971998-10-0202 October 1998 Application for Amends to Licenses NPF-87 & NPF-89,revising TS 4.0.6, SG Sr. Encls Contain Supporting Tss,Proprietary TR WCAP-15004,non-proprietary TR WCAP-15005 & W Proprietary Authorization Ltr.Proprietary Encl,Withheld TXX-9810, LAR 98-005 to Licenses NPF-87 & NPF-89,incorporating Encl Change Into Plant,Units 1 & 2 Ts.Change Is Applicable to Unit 2 & Administrative for Unit 1.Affidavit,encl1998-04-0909 April 1998 LAR 98-005 to Licenses NPF-87 & NPF-89,incorporating Encl Change Into Plant,Units 1 & 2 Ts.Change Is Applicable to Unit 2 & Administrative for Unit 1.Affidavit,encl ML20216B1321998-04-0606 April 1998 Application for Amend to License NPF-89,requesting Enforcement Discretion to Allow Plant to Continue to Operate W/O Having Performed Portions of Listed SRs ML20217A3841998-03-18018 March 1998 LAR 98-004 to Licenses NPF-87 & NPF-89,requesting Enforcement Discretion to Allow Units 1 & 2 to Perform Shutdown Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power ML20248L3161998-03-12012 March 1998 Application for Amends to Licenses NPF-87 & NPF-89,re Enforcement of Discretion & Compliance W/Ts 4.8.1.1.2f ML20216D5841998-03-0909 March 1998 Revised LAR 98-002 for Licenses NPF-87 & NPF-89,temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a), for Unit 2 Only TXX-9803, Application for Amends to Licenses NPF-87 & NPF-89, Increasing RWST low-low Level Setpoint1998-02-27027 February 1998 Application for Amends to Licenses NPF-87 & NPF-89, Increasing RWST low-low Level Setpoint ML20203J4921998-02-25025 February 1998 Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Attached Change Into TS to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements ML20212C3801997-10-24024 October 1997 Application for Amends to Licenses NPF-87 & NPF-89, Incorporating Encl Changes Re Reactor Trip Setpoint for Cycle 7 Into TS TXX-9711, Application for Amends to Licenses NPF-87 & NPF-89, Consisting of Change Request 97-002 Re Rev to Unit 2 Rt Setpoint1997-05-16016 May 1997 Application for Amends to Licenses NPF-87 & NPF-89, Consisting of Change Request 97-002 Re Rev to Unit 2 Rt Setpoint ML20141C9271997-05-15015 May 1997 Application for Amends to Licenses NPF-87 & NPF-89,adding License Conditions to Address SRs Not Previously Performed by Existing Requirements or Tests.Attachments 1-20 Encl ML20116F0421996-08-0202 August 1996 LAR 96-006 to Licenses NPF-87 & NPF-89,increasing Allowed Outage Time for Charging Pump from 72 H to 7 Days ML20116F3561996-07-31031 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,revising Unit 1 Rx Trip Setpoints & Incorporating TU Electric SBLOCA TR on COLR Ts,Applicable to Both Units ML20116E8471996-07-31031 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,modifying Inverter/Battery Chargers by Incorporating Attached Changes Into CPSES Units 1 & 2 TSs ML20115E7991996-07-10010 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,changing TS 3/4.7.11 to Revise Lco,Actions & SRs to Take Credit for Addition of Train Oriented Fan Coil Units for Each UPS & Distribution Room ML20115C9271996-07-0909 July 1996 LAR 96-003 to Licenses NPF-87 & NPF-89,increasing Allowable Value for Steam Line pressure-low for Cpses,Unit 1 ML20113B5831996-06-21021 June 1996 Application for Amends to Licenses NPF-87 & NPF-89,removing Request to Relocate MSIV Full Closure Time Requirement to Program Administratively Controlled by TS & Revising Associated Bases to Include Addl Info TXX-9600, Application for Amends to Licenses NPF-87 & NPF-89,changing TS 3/4.6.1 & Adding TS 6.8.3g to Implement New Containment Leakage Rate Testing Program Required by 10CFR50 App J, Option B1996-03-12012 March 1996 Application for Amends to Licenses NPF-87 & NPF-89,changing TS 3/4.6.1 & Adding TS 6.8.3g to Implement New Containment Leakage Rate Testing Program Required by 10CFR50 App J, Option B ML20100J0611996-02-22022 February 1996 Application for Amends to Licenses NPF-87 & NPF-89,revising TS LCO 3.9.4 to Allow Both Door of Pal to Remain Open If One Is Capable of Being Closed ML20096B3181996-01-0505 January 1996 Application for Amends to Licenses NPF-87 & NPF-89, Consisting of LAR 96-001 Revising TS Re Wide Range RCS Temp.-Th Remote Shutdown Indication.Changes Submitted on CPSES Unit 1 for Administrative Purposes Only ML20094N6161995-11-21021 November 1995 Application for Amends to Licenses NPF-87 & NPF-89,allowing Containment Personnel Airlock Doors to Remain Open During Movement of Irradiated Fuel & During Core Alterations for Plant TXX-9528, LAR 95-008 to License NPF-87 & NPF-89,incorporating Revised Core Safety Limit Curves & Revised N-16 Overtemp Reactor Trip Setpoints,Resulting from Reload Analyses for CPSES Unit 2,Cycle 31995-11-21021 November 1995 LAR 95-008 to License NPF-87 & NPF-89,incorporating Revised Core Safety Limit Curves & Revised N-16 Overtemp Reactor Trip Setpoints,Resulting from Reload Analyses for CPSES Unit 2,Cycle 3 ML20087J7921995-08-15015 August 1995 LAR 95-04 to Licenses NPF-87 & NPF-89,moving Overtemp N-16 Limits from TS to Colr,Per GL 88-16.Changes in LAR 95-04 Originally Submitted in LAR 95-03 on 950512.LAR 95-03 Being Divided Into Four Separate LARs for Ease in Processing ML20087K1721995-08-15015 August 1995 Requests Amend to Licenses NPF-87 & NPF-89,consisting of Change Request 95-05,moving Shutdown Margin Limits from TS to COLR & Providing Guidelines for Removal of cycle-specific Parameter Limits from TS ML20087E2521995-08-11011 August 1995 Suppl to Application for Amends to Licenses NPF-37,NPF-66, NPF-72 & NPF-77,revising TS 3.6.1.7, Containment Purge Ventilation Sys ML20083M8531995-05-12012 May 1995 Application for Amend to Licenses NPF-87 & NPF-89,consisting of LAR 95-03,removing cycle-specific Parameter Limits from Ts,Per GL 88-16 TXX-9509, Application for Amends to Licenses NPF-87 & NPF-89.Amends Would Reduce Min Fuel Oil Vol Requirement During Modes 5 & 6 for Operable EDGs1995-05-0101 May 1995 Application for Amends to Licenses NPF-87 & NPF-89.Amends Would Reduce Min Fuel Oil Vol Requirement During Modes 5 & 6 for Operable EDGs ML20082C6401995-04-0303 April 1995 Suppl to Application for Amends to Licenses NPF-87 & NPF-89 Re Quadrant Power Tilt Ratio TXX-9505, LAR 95-001 to Licenses NPF-87 & NPF-89,changing TS to Address Performance Requirements of Containment Spray Pumps1995-02-28028 February 1995 LAR 95-001 to Licenses NPF-87 & NPF-89,changing TS to Address Performance Requirements of Containment Spray Pumps ML20079B4721994-12-30030 December 1994 LAR 94-022 to Licenses NPF-87 & NPF-89,incorporating Changes to TS to Increase Spent Fuel Storage Capacity.Rev 0 of CPSES Fuel Storage Licensing Rept,Cpses Expansion of Spent Fuel Storage Capacity Encl ML20078R8071994-12-19019 December 1994 Application for Amends to Licenses NPF-87 & NPF-89 to Allow Testing of RPS & ESFAS W/Channel Under Test in Bypass ML20078S0891994-12-19019 December 1994 Application for Amends to Licenses NPF-87 & NPF-89, Requesting Approval of Converted TSs to Format & Content of Improved STSs ML20077F0881994-12-0707 December 1994 License Amend Request 94-020 to Licenses NPF-87 & NPF-89, Revising TS LCO for MSIVs to Increase Allowed Outage Time in Mode 1 & Relocate MSIVs to Full Closure Time Requirement to Program Administratively Controlled ML20077F1951994-12-0606 December 1994 Application for Amends to Licenses NPF-87 & NPF-89, Consisting of LAR 94-021,revising TS to Allow Appropriate Remedial Action for High Particulate Levels in DG Fuel Oil & Other out-of-limit Properties in New DG Fuel Oil ML20078K7461994-11-18018 November 1994 LAR 94-018 to Licenses NPF-87 & NPF-89,revising TS Re Heat Flux Hot Channel Factor ML20077A7071994-11-18018 November 1994 LAR 94-019 to Licenses NPF-87 & NPF-89,removing Accelarated Testing & Special Reporting Requirements for EDGs from TS, Based on GL 94-01 ML20078G7281994-11-11011 November 1994 Application for Amends to Licenses NPF-87 & NPF-89,revising TSs Re Exclusion of Failures from Total Number of Failures Used to Determine Diesel Generator Test Frequency 1999-08-27
[Table view] |
Text
L
==
.5 Log # TXX-98079
. r C File # 916-(3/4.8) 7t/ ELECTRIC Ref. # ! R 50.90 10 CFR 50.36
- c. ime. Thrry i s ,.ior we ,r m u ,.,
March 18, 1998 j
& Pri.cipalNancl,ar Officer U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 l
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET N05. 50 445 AND 50 446 SUBMITTAL OF LICENSE AMENDMENT REQUEST (LAR) 98 004 A.C. POWER, OPERATING REF: 1) TV Electric Letter, logged TXX 98078, from C. L. Terry to the NRC dated March 13, 1998
- 2) TU Electric Letter, logged TXX 98049, from C. L. Terry to the NRC dated February 20, 1998
- 3) TU Electric Letter, logged TXX-98066, from C. L. Terry to the NRC dated March 9, 1998 Gentlemen:
Pursuant to 10CFR50.90. TU Electric hereby requests an amendment to the CPSES Unit 1 Operating License (NPF 87) and CPSES Unit 2 Operating License (NPF-89) by incorporating the attached change into the CPSES Units 1 and 2 Technical Specifications. This change is applicable to both CPSES Unit 1 and CPSES Unit 2.
On March 13, 1998, at about 1:00 pm central time. TV Electric participated in a conference call with the NRC staff to discuss the request for enforcement discretion submitted to the NRC in TU Electric letter TXX 98078 (reference 1). At the conclusion of the conference call the NRC exercised enforcement discretion to allow CPSES Units 1 and 2 to perform shutdown Surveillance Requirements 4.8.1.1.2f.4)a) and 4.8.1.1.2f.6)a) at power. Without the /
/
requested enforcement discretion, compliance with CPSES Technical Specification 4.8.1.1.2f would have required both CPSES Units 1 and 2 to shutdown in order to demonstrate the OPERABILITY of the 480 volt motor
' control center ~(HCC) undervoltage load shed relay contacts. [
This LAR is being submitted as follow up to the-request for enforcement discretion (reference 1). The license amendment should be effective upon zissuance to be implemented immediately.
Attachment'l-is the required affidavit. Attachment 2 provides a detailed description of the proposed changes, a safety analysis of the changes, and TU Electric's determination'that the proposed changes do not involve a c " ^ "'" ' "'^
- S^" ' ' t c'" ' c S'^ " "
240032 *
- 9003250025 990318 PDR ADOCK 05000445 P
PDR _
r: 7 [
.1
/
TXX 98079 Page 2 of 2 significant hazard. consideration. Attachment 3 provides the affected Technical Specification page, marked up to reflect the proposed changes.
In.accordance with 10CFR50.91(b), TU Electric is providing'the State of Texas with a copy of this proposed amendment.
Should you have any questions. please contact Mr. Bob Dacko at-(254) 897 0122.
This communication contains no new licensing basis commitments regarding CPSES Units 1 and 2.
Sincerely,
<db y C. L. Terry By: 0GGr $-
RogeY D. Walker Regulatory Affairs Manager BSD/bd Attachments:
- 1. Affidavit
- 2. Description and Assessment
- 3. Affected Technical Specification page as revised by all approved license amendments c- E. W. Herschoff, Region IV J. I. Tapia, Region IV T. J. Polich, NRR Resident Inspectors, CPSES_
Mr. Arthur C. Tate Bureau of Radiation Control Texas Department of Public Health 1100 West 49th Street Austin. Texas 78704
Attachment 1 to TXX 98079 Page 1 of 1 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )
)
Texas Utilities Electric Company ) Docket Nos. 50-445
) 50 446 (Comanche Peak Steam Electric ) License Nos. NPF 87 Station, Units 1 & 2) ) NPF 89 AFFIDAVIT Roger D. Walker, being duly sworn, hereby deposes and says that he is Regulatory Affairs Manager for TV Electric, the licensee herein: that he is duly authorized to sign and file with the Nuclear Regulatory Commission this License Amendment Request 98 004: that he is familiar with the content thereof: and that the matters set forth therein are true and correct to the best of his knowledge, information and belief.
I etLO4 b.
Roge H . Walker Regulatory Affairs Manager STATE OF TEXAS )
)
COUNTY OF N\oks )
Subscribed and sworn to before me, on this 13 day of O arch R M .
Notary Public j f l.. oONALD R. WOODLAN j Notory Put:ilic
.(,A+
'/ 5'ufe of fe.+.y L ' Comfti4106 lborea 4-946 j i
l i
1
)
ATTACHMENT 2 to TXX-98079 DESCRIPTION AND ASSESSMENT
Attachment 2 to TXX 98079 Page 1 of 3 DESCRIPTION AND ASSESSMENT I. BACKGROUND During the process of conducting reviews in accordance with U.S. NRC Generic Letter 96 01, CPSES discovered that it had not positively verified that certain contacts from the undervoltage relays cause load shedding at the 480 volt MCCs. Therefore complete testing in accordance with Surveillance Requirements (SRs) 4.8.1.1.2f.4)a) and 4.8.1.1.2f.6)a) has not been performed. A parallel circuit path containing a contact from the Diesel Generator output breaker exists and could not be conclusively eliminated as causing the observed load shed during performance of previous integrated tests.
Surveillance Requirement 4.8.1.1.2f requires, in part. that certain A.C.
electrical sources be demonstrated OPERABLE by performing the Surveillance Requirement at least once per 18 months. "during shutdown." Failure to perform the Surveillance Requirement within the la month frequency plus allowances allowed per Surveillance Requirerent 4.0.2. would result in failure to perform a Surveillance Requireme'nt. In accordance with Surveillance Requirement 4.0.3, this failure to perform the Surveillance Requirement would constitute a noncompliance with the OPERABILITY requirements for the LCO. Also in accordance with Surveillance Requirement 4.0.3, the ACTION requirements may be delayed for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to permit completion of the surveillance when the allowable outage time limits of the ACTION requirements are less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
With respect to SRs 4.8.1.1.2f.4)a) and 4.8.1.1.2f.6)a). TU Electric requested and the NRC exercised discretion to not enforce the requirement to perform the surveillance "during shutdown". in order to demonstrate the OPERABILITY by verifying load shedding occurs due to a loss-of-offsite power. On a one time basis, crediting performance of SRs 4.8.1.1.2f.4)a) and 4.8.1.1.2f.6)a), during POWER OPERATIONS as opposed to "during shutdown" is acceptable.
This change does not impact the improved Technical Specifications because it is temporary change and is plant specific.
II. DESCRIPTION OF TECHNICAL SPECIFICATIONS CHANGE REQUEST This LAR provides a temporary Technical Specification change for SRs 4.8.1.1.2f 4)a) and 4.8.1.1.2f.6)a) to allow the verification that load shedding occurs as a result of the deenergization of the emergency busses to be performed at power for fuel cycle 6 on Unit 1 and fuel cycle 4 on Unit 2.
III. ANALYSIS The safety function of the undervoltage relays is to shed unnecessary equipment loads on the A.C. bus and allow an operating diesel generator to be connected to the A.C. bus and power emergency equipment. These relays are relied upon to ensure that the necessary equipment is shed from the bus at the appropriate time. Failure of the affected equipment to
Attachment 2 to TXX 98079 Page 2 of 3
' loads would place the operators in a situation where manual operator actions would be necessary to remove the unnecessary equipment from the A.C. bus.
TU Electric has reviewed the required testing and has determined that acceptable tests for demonstrating OPERABILITY of the undervoltage relay contacts can be performed during POWER OPERATIONS with no adverse effect to the A.C. electrical distribution system. TU Electric is aware that the preclusion from performing these surveillance tests at conditions other than shutdown is to avoid the potential for perturbations to the A.C.
electrical distribution system and thereby result in a challenge to safety systems. These tests demonstrate that the contacts from the undervoltage relays close upon actuation of the associated relay, thus completing the confirmation of the circuit by overlapping tests. Downstream actuation of the relays and breaker trips was confirmed during the normal integrated surveillance test. Note that the bus tie breaker for MCC XEB4 3 for Unit 2 was not tested during the last surveillance test and was the subject of previous enforcement discretion (Reference 2) and License Amendment Request (Reference 3). Performance of this testing does not create the potential for an abnormal perturbation to the A.C. electrical distribution system while the reactor is critical.
TV Electric believes that the crediting of these segments of the integrative tests are both acceptable and appropriate during POWER OPERATIONS. The potential consequences resulting from a coincident shutdown of both units of CPSES and the possible perturbations induced into the A.C. grid are clearly higher than those of crediting these testing segments during POWER OPERATIONS. A qualitative risk assessment based on the CPSES PRA concluded that performance of this testing will not have an adverse impact on risk for either CPSES Unit 1 or Unit 2.
Therefore, the possible consequences of conducting a dual unit shutdown in order to demonstrate the OPERABILITY of the undervoltage relays far exceeds the potential consequences of crediting the testing segments in order to satisfy the Surveillance Requirements.
IV. SIGNIFICANT HAZARDS CONSIDERATIONS ANALYSIS TU Electric has evaluated whether or not a significant hazards consideration is involved with the proposed changes by focusing on the three standards set forth in 10CFR50.92(c) as discussed below:
- 1. Do the proposed changes involve a significant increase in the probability or consequences of an accident previously evaluated?
Crediting the at power performance of the portions of surveillance te sting necessary to demonstrate the OPERABILITY of the undervoltage i relays, will not increase the probability or consequences of an accident previously evaluated. The conclusion has been reached that l the probability of initiating an abnormal perturbation in the A.C.
electrical distribution system is not created via the crediting of the tests. As the testing was conducted on only one train per unit at a given time, no increase in consequences, other than those previously postulated, are considered credible.
Attachment 2 to TXX-98079 Page 3 of 3
'2. Do the proposed changes create the possibility of a new or different kind of accident from any accident previously evaluated?
Perturbations in the A.C. electrical distribution system have been fully considered within the Final Safety Analysis Report. No new or different kind of perturbation or accident is deemed credible from crediting the performance of the testing.
- 3. Do the proposed changes involve a significant reduction in a margin of safety?
Crediting the required testing at power does not create any new failure scenarios or abnormal A.C. electrical distribution perturbations. As such, there is no reduction in any margin of safety.
Based on the above evaluations, TV Electric concludes that the activities associated with the above described changes present no significant hazards consideration under the standards set forth in 10CFR50.92(c) and, accordingly, a finding by the NRC of no significant hazards consideration is justified.
V. ENVIRONMENTAL EVALUATION TU Electric has determined that the proposed amendment would change requirements with respect to the installation or use of a facility component located within the restricted area, as defined in 10CFR20, or would change an inspection or surveillance requirement. TU Electric has evaluated the proposed changes and has determined that the changes do not involve (1) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed changes meet the eligibility criterion for categorical exclusion set forth in 10CFR51.22(c)(9). Therefore, pursuant to 10CFR51.22(b), an environmental assessment of proposed change is not required.