|
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20211G3041999-08-26026 August 1999 Suppl 981002 to LAR-98-006 to Licenses NPF-87 & NPF-89, Amending Tech Specs 4.0.6, SG Surveillance Requirements Which Provides Tube Insp Requirements & Acceptance Criteria to Determine Level of Degradation ML20210R6881999-08-13013 August 1999 Supplemental Application to License Amend Request LAR 98-010,for Licenses NPF-87 & NPF-89,correcting Existing Errors in Calculations of Original Lar.Revised Ts,Encl ML20209E1781999-07-0909 July 1999 Supplemental Application for LAR 99-002 for Licenses NPF-87 & NPF-89,proposing to Add Reactor Core Safety Limit Figures to Section 5.6.5 (COLR) of TSs TXX-9913, LAR 99-005 to Licenses NPF-87 & NPF-89,revising EDG Start to Emergency Start Instead of Normal Start Following Loss of Offsite Power1999-06-23023 June 1999 LAR 99-005 to Licenses NPF-87 & NPF-89,revising EDG Start to Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5311999-06-0404 June 1999 Supplemental Application for Amend to Licenses NPF-87 & NPF-89,proposing Addl Editorial Corrections.Corrections Are to Be Considered Administrative ML20195B6411999-05-27027 May 1999 LAR 99-004 to Licenses NPF-87 & NPF-89 by Incorporating Attached Change Re Plant Battery Surveillance Into TS ML20195B6571999-05-24024 May 1999 LAR 99-002 to Licenses NPF-87 & NPF-89,adding to COLR & Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206T5231999-05-14014 May 1999 Application for Amends to Licenses NPF-87 & NPF-89,changing Corporate Name of Licensee Texas Utilities Electric Co to Txu Electric Co. Marked-up OL Pages,Encl ML20206G7051999-05-0404 May 1999 LAR 99-001 for Amends to Licenses NPF-87 & NPF-89,revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections TXX-9826, Application for Amends to Licenses NPF-87 & NPF-89,proposing Increase in Licensed Power for Operation of Cpses,Unit 2 to 3445 Mwt (Approx 1%) & Changes Administratively for Unit 1.Supporting TSs & TR WCAP-10263,encl1998-12-21021 December 1998 Application for Amends to Licenses NPF-87 & NPF-89,proposing Increase in Licensed Power for Operation of Cpses,Unit 2 to 3445 Mwt (Approx 1%) & Changes Administratively for Unit 1.Supporting TSs & TR WCAP-10263,encl ML20195F1611998-11-13013 November 1998 LAR 98-08 to Licenses NPF-87 & NPF-89,changing Suppl to LAR 96-06,original Description & Assessment Provided in Ltr Dtd 960802,revised to Reflect Addition of Configuration Risk Mgt Program ML20195F5191998-11-11011 November 1998 LAR 98-007 to Licenses NPF-87 & NPF-89,revising Reactor Trip Setpoint for Cycle 5 ML20154C8971998-10-0202 October 1998 Application for Amends to Licenses NPF-87 & NPF-89,revising TS 4.0.6, SG Sr. Encls Contain Supporting Tss,Proprietary TR WCAP-15004,non-proprietary TR WCAP-15005 & W Proprietary Authorization Ltr.Proprietary Encl,Withheld TXX-9810, LAR 98-005 to Licenses NPF-87 & NPF-89,incorporating Encl Change Into Plant,Units 1 & 2 Ts.Change Is Applicable to Unit 2 & Administrative for Unit 1.Affidavit,encl1998-04-0909 April 1998 LAR 98-005 to Licenses NPF-87 & NPF-89,incorporating Encl Change Into Plant,Units 1 & 2 Ts.Change Is Applicable to Unit 2 & Administrative for Unit 1.Affidavit,encl ML20216B1321998-04-0606 April 1998 Application for Amend to License NPF-89,requesting Enforcement Discretion to Allow Plant to Continue to Operate W/O Having Performed Portions of Listed SRs ML20217A3841998-03-18018 March 1998 LAR 98-004 to Licenses NPF-87 & NPF-89,requesting Enforcement Discretion to Allow Units 1 & 2 to Perform Shutdown Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power ML20248L3161998-03-12012 March 1998 Application for Amends to Licenses NPF-87 & NPF-89,re Enforcement of Discretion & Compliance W/Ts 4.8.1.1.2f ML20216D5841998-03-0909 March 1998 Revised LAR 98-002 for Licenses NPF-87 & NPF-89,temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a), for Unit 2 Only TXX-9803, Application for Amends to Licenses NPF-87 & NPF-89, Increasing RWST low-low Level Setpoint1998-02-27027 February 1998 Application for Amends to Licenses NPF-87 & NPF-89, Increasing RWST low-low Level Setpoint ML20203J4921998-02-25025 February 1998 Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Attached Change Into TS to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements ML20212C3801997-10-24024 October 1997 Application for Amends to Licenses NPF-87 & NPF-89, Incorporating Encl Changes Re Reactor Trip Setpoint for Cycle 7 Into TS TXX-9711, Application for Amends to Licenses NPF-87 & NPF-89, Consisting of Change Request 97-002 Re Rev to Unit 2 Rt Setpoint1997-05-16016 May 1997 Application for Amends to Licenses NPF-87 & NPF-89, Consisting of Change Request 97-002 Re Rev to Unit 2 Rt Setpoint ML20141C9271997-05-15015 May 1997 Application for Amends to Licenses NPF-87 & NPF-89,adding License Conditions to Address SRs Not Previously Performed by Existing Requirements or Tests.Attachments 1-20 Encl ML20116F0421996-08-0202 August 1996 LAR 96-006 to Licenses NPF-87 & NPF-89,increasing Allowed Outage Time for Charging Pump from 72 H to 7 Days ML20116F3561996-07-31031 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,revising Unit 1 Rx Trip Setpoints & Incorporating TU Electric SBLOCA TR on COLR Ts,Applicable to Both Units ML20116E8471996-07-31031 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,modifying Inverter/Battery Chargers by Incorporating Attached Changes Into CPSES Units 1 & 2 TSs ML20115E7991996-07-10010 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,changing TS 3/4.7.11 to Revise Lco,Actions & SRs to Take Credit for Addition of Train Oriented Fan Coil Units for Each UPS & Distribution Room ML20115C9271996-07-0909 July 1996 LAR 96-003 to Licenses NPF-87 & NPF-89,increasing Allowable Value for Steam Line pressure-low for Cpses,Unit 1 ML20113B5831996-06-21021 June 1996 Application for Amends to Licenses NPF-87 & NPF-89,removing Request to Relocate MSIV Full Closure Time Requirement to Program Administratively Controlled by TS & Revising Associated Bases to Include Addl Info TXX-9600, Application for Amends to Licenses NPF-87 & NPF-89,changing TS 3/4.6.1 & Adding TS 6.8.3g to Implement New Containment Leakage Rate Testing Program Required by 10CFR50 App J, Option B1996-03-12012 March 1996 Application for Amends to Licenses NPF-87 & NPF-89,changing TS 3/4.6.1 & Adding TS 6.8.3g to Implement New Containment Leakage Rate Testing Program Required by 10CFR50 App J, Option B ML20100J0611996-02-22022 February 1996 Application for Amends to Licenses NPF-87 & NPF-89,revising TS LCO 3.9.4 to Allow Both Door of Pal to Remain Open If One Is Capable of Being Closed ML20096B3181996-01-0505 January 1996 Application for Amends to Licenses NPF-87 & NPF-89, Consisting of LAR 96-001 Revising TS Re Wide Range RCS Temp.-Th Remote Shutdown Indication.Changes Submitted on CPSES Unit 1 for Administrative Purposes Only TXX-9528, LAR 95-008 to License NPF-87 & NPF-89,incorporating Revised Core Safety Limit Curves & Revised N-16 Overtemp Reactor Trip Setpoints,Resulting from Reload Analyses for CPSES Unit 2,Cycle 31995-11-21021 November 1995 LAR 95-008 to License NPF-87 & NPF-89,incorporating Revised Core Safety Limit Curves & Revised N-16 Overtemp Reactor Trip Setpoints,Resulting from Reload Analyses for CPSES Unit 2,Cycle 3 ML20094N6161995-11-21021 November 1995 Application for Amends to Licenses NPF-87 & NPF-89,allowing Containment Personnel Airlock Doors to Remain Open During Movement of Irradiated Fuel & During Core Alterations for Plant ML20087K1721995-08-15015 August 1995 Requests Amend to Licenses NPF-87 & NPF-89,consisting of Change Request 95-05,moving Shutdown Margin Limits from TS to COLR & Providing Guidelines for Removal of cycle-specific Parameter Limits from TS ML20087J7921995-08-15015 August 1995 LAR 95-04 to Licenses NPF-87 & NPF-89,moving Overtemp N-16 Limits from TS to Colr,Per GL 88-16.Changes in LAR 95-04 Originally Submitted in LAR 95-03 on 950512.LAR 95-03 Being Divided Into Four Separate LARs for Ease in Processing ML20087E2521995-08-11011 August 1995 Suppl to Application for Amends to Licenses NPF-37,NPF-66, NPF-72 & NPF-77,revising TS 3.6.1.7, Containment Purge Ventilation Sys ML20083M8531995-05-12012 May 1995 Application for Amend to Licenses NPF-87 & NPF-89,consisting of LAR 95-03,removing cycle-specific Parameter Limits from Ts,Per GL 88-16 TXX-9509, Application for Amends to Licenses NPF-87 & NPF-89.Amends Would Reduce Min Fuel Oil Vol Requirement During Modes 5 & 6 for Operable EDGs1995-05-0101 May 1995 Application for Amends to Licenses NPF-87 & NPF-89.Amends Would Reduce Min Fuel Oil Vol Requirement During Modes 5 & 6 for Operable EDGs ML20082C6401995-04-0303 April 1995 Suppl to Application for Amends to Licenses NPF-87 & NPF-89 Re Quadrant Power Tilt Ratio TXX-9505, LAR 95-001 to Licenses NPF-87 & NPF-89,changing TS to Address Performance Requirements of Containment Spray Pumps1995-02-28028 February 1995 LAR 95-001 to Licenses NPF-87 & NPF-89,changing TS to Address Performance Requirements of Containment Spray Pumps ML20079B4721994-12-30030 December 1994 LAR 94-022 to Licenses NPF-87 & NPF-89,incorporating Changes to TS to Increase Spent Fuel Storage Capacity.Rev 0 of CPSES Fuel Storage Licensing Rept,Cpses Expansion of Spent Fuel Storage Capacity Encl ML20078R8071994-12-19019 December 1994 Application for Amends to Licenses NPF-87 & NPF-89 to Allow Testing of RPS & ESFAS W/Channel Under Test in Bypass ML20078S0891994-12-19019 December 1994 Application for Amends to Licenses NPF-87 & NPF-89, Requesting Approval of Converted TSs to Format & Content of Improved STSs ML20077F0881994-12-0707 December 1994 License Amend Request 94-020 to Licenses NPF-87 & NPF-89, Revising TS LCO for MSIVs to Increase Allowed Outage Time in Mode 1 & Relocate MSIVs to Full Closure Time Requirement to Program Administratively Controlled ML20077F1951994-12-0606 December 1994 Application for Amends to Licenses NPF-87 & NPF-89, Consisting of LAR 94-021,revising TS to Allow Appropriate Remedial Action for High Particulate Levels in DG Fuel Oil & Other out-of-limit Properties in New DG Fuel Oil ML20077A7071994-11-18018 November 1994 LAR 94-019 to Licenses NPF-87 & NPF-89,removing Accelarated Testing & Special Reporting Requirements for EDGs from TS, Based on GL 94-01 ML20078K7461994-11-18018 November 1994 LAR 94-018 to Licenses NPF-87 & NPF-89,revising TS Re Heat Flux Hot Channel Factor ML20078G7281994-11-11011 November 1994 Application for Amends to Licenses NPF-87 & NPF-89,revising TSs Re Exclusion of Failures from Total Number of Failures Used to Determine Diesel Generator Test Frequency ML20073B6491994-09-19019 September 1994 Application for Amends to Licenses NPF-87 & NPF-89, Incorporating Encl Change Into Licensee Units 1 & 2 TSs 1999-08-26
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20211J4031999-08-27027 August 1999 Errata to Amends 66 & 66 to Licenses NPF-87 & NPF-89, Respectively.Footnote on TS Page 3.8-26 Was Incorrectly Deleted ML20211G3041999-08-26026 August 1999 Suppl 981002 to LAR-98-006 to Licenses NPF-87 & NPF-89, Amending Tech Specs 4.0.6, SG Surveillance Requirements Which Provides Tube Insp Requirements & Acceptance Criteria to Determine Level of Degradation ML20210R6881999-08-13013 August 1999 Supplemental Application to License Amend Request LAR 98-010,for Licenses NPF-87 & NPF-89,correcting Existing Errors in Calculations of Original Lar.Revised Ts,Encl ML20209E1781999-07-0909 July 1999 Supplemental Application for LAR 99-002 for Licenses NPF-87 & NPF-89,proposing to Add Reactor Core Safety Limit Figures to Section 5.6.5 (COLR) of TSs TXX-9913, LAR 99-005 to Licenses NPF-87 & NPF-89,revising EDG Start to Emergency Start Instead of Normal Start Following Loss of Offsite Power1999-06-23023 June 1999 LAR 99-005 to Licenses NPF-87 & NPF-89,revising EDG Start to Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5311999-06-0404 June 1999 Supplemental Application for Amend to Licenses NPF-87 & NPF-89,proposing Addl Editorial Corrections.Corrections Are to Be Considered Administrative ML20195B6411999-05-27027 May 1999 LAR 99-004 to Licenses NPF-87 & NPF-89 by Incorporating Attached Change Re Plant Battery Surveillance Into TS ML20195B6571999-05-24024 May 1999 LAR 99-002 to Licenses NPF-87 & NPF-89,adding to COLR & Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206T5231999-05-14014 May 1999 Application for Amends to Licenses NPF-87 & NPF-89,changing Corporate Name of Licensee Texas Utilities Electric Co to Txu Electric Co. Marked-up OL Pages,Encl ML20206G7051999-05-0404 May 1999 LAR 99-001 for Amends to Licenses NPF-87 & NPF-89,revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections TXX-9826, Application for Amends to Licenses NPF-87 & NPF-89,proposing Increase in Licensed Power for Operation of Cpses,Unit 2 to 3445 Mwt (Approx 1%) & Changes Administratively for Unit 1.Supporting TSs & TR WCAP-10263,encl1998-12-21021 December 1998 Application for Amends to Licenses NPF-87 & NPF-89,proposing Increase in Licensed Power for Operation of Cpses,Unit 2 to 3445 Mwt (Approx 1%) & Changes Administratively for Unit 1.Supporting TSs & TR WCAP-10263,encl ML20195F1611998-11-13013 November 1998 LAR 98-08 to Licenses NPF-87 & NPF-89,changing Suppl to LAR 96-06,original Description & Assessment Provided in Ltr Dtd 960802,revised to Reflect Addition of Configuration Risk Mgt Program ML20195F5191998-11-11011 November 1998 LAR 98-007 to Licenses NPF-87 & NPF-89,revising Reactor Trip Setpoint for Cycle 5 ML20154C8971998-10-0202 October 1998 Application for Amends to Licenses NPF-87 & NPF-89,revising TS 4.0.6, SG Sr. Encls Contain Supporting Tss,Proprietary TR WCAP-15004,non-proprietary TR WCAP-15005 & W Proprietary Authorization Ltr.Proprietary Encl,Withheld TXX-9810, LAR 98-005 to Licenses NPF-87 & NPF-89,incorporating Encl Change Into Plant,Units 1 & 2 Ts.Change Is Applicable to Unit 2 & Administrative for Unit 1.Affidavit,encl1998-04-0909 April 1998 LAR 98-005 to Licenses NPF-87 & NPF-89,incorporating Encl Change Into Plant,Units 1 & 2 Ts.Change Is Applicable to Unit 2 & Administrative for Unit 1.Affidavit,encl ML20216B1321998-04-0606 April 1998 Application for Amend to License NPF-89,requesting Enforcement Discretion to Allow Plant to Continue to Operate W/O Having Performed Portions of Listed SRs ML20217A3841998-03-18018 March 1998 LAR 98-004 to Licenses NPF-87 & NPF-89,requesting Enforcement Discretion to Allow Units 1 & 2 to Perform Shutdown Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power ML20248L3161998-03-12012 March 1998 Application for Amends to Licenses NPF-87 & NPF-89,re Enforcement of Discretion & Compliance W/Ts 4.8.1.1.2f ML20216D5841998-03-0909 March 1998 Revised LAR 98-002 for Licenses NPF-87 & NPF-89,temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a), for Unit 2 Only TXX-9803, Application for Amends to Licenses NPF-87 & NPF-89, Increasing RWST low-low Level Setpoint1998-02-27027 February 1998 Application for Amends to Licenses NPF-87 & NPF-89, Increasing RWST low-low Level Setpoint ML20203J4921998-02-25025 February 1998 Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Attached Change Into TS to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements ML20212C3801997-10-24024 October 1997 Application for Amends to Licenses NPF-87 & NPF-89, Incorporating Encl Changes Re Reactor Trip Setpoint for Cycle 7 Into TS TXX-9711, Application for Amends to Licenses NPF-87 & NPF-89, Consisting of Change Request 97-002 Re Rev to Unit 2 Rt Setpoint1997-05-16016 May 1997 Application for Amends to Licenses NPF-87 & NPF-89, Consisting of Change Request 97-002 Re Rev to Unit 2 Rt Setpoint ML20141C9271997-05-15015 May 1997 Application for Amends to Licenses NPF-87 & NPF-89,adding License Conditions to Address SRs Not Previously Performed by Existing Requirements or Tests.Attachments 1-20 Encl ML20116F0421996-08-0202 August 1996 LAR 96-006 to Licenses NPF-87 & NPF-89,increasing Allowed Outage Time for Charging Pump from 72 H to 7 Days ML20116F3561996-07-31031 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,revising Unit 1 Rx Trip Setpoints & Incorporating TU Electric SBLOCA TR on COLR Ts,Applicable to Both Units ML20116E8471996-07-31031 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,modifying Inverter/Battery Chargers by Incorporating Attached Changes Into CPSES Units 1 & 2 TSs ML20115E7991996-07-10010 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,changing TS 3/4.7.11 to Revise Lco,Actions & SRs to Take Credit for Addition of Train Oriented Fan Coil Units for Each UPS & Distribution Room ML20115C9271996-07-0909 July 1996 LAR 96-003 to Licenses NPF-87 & NPF-89,increasing Allowable Value for Steam Line pressure-low for Cpses,Unit 1 ML20113B5831996-06-21021 June 1996 Application for Amends to Licenses NPF-87 & NPF-89,removing Request to Relocate MSIV Full Closure Time Requirement to Program Administratively Controlled by TS & Revising Associated Bases to Include Addl Info TXX-9600, Application for Amends to Licenses NPF-87 & NPF-89,changing TS 3/4.6.1 & Adding TS 6.8.3g to Implement New Containment Leakage Rate Testing Program Required by 10CFR50 App J, Option B1996-03-12012 March 1996 Application for Amends to Licenses NPF-87 & NPF-89,changing TS 3/4.6.1 & Adding TS 6.8.3g to Implement New Containment Leakage Rate Testing Program Required by 10CFR50 App J, Option B ML20100J0611996-02-22022 February 1996 Application for Amends to Licenses NPF-87 & NPF-89,revising TS LCO 3.9.4 to Allow Both Door of Pal to Remain Open If One Is Capable of Being Closed ML20096B3181996-01-0505 January 1996 Application for Amends to Licenses NPF-87 & NPF-89, Consisting of LAR 96-001 Revising TS Re Wide Range RCS Temp.-Th Remote Shutdown Indication.Changes Submitted on CPSES Unit 1 for Administrative Purposes Only ML20094N6161995-11-21021 November 1995 Application for Amends to Licenses NPF-87 & NPF-89,allowing Containment Personnel Airlock Doors to Remain Open During Movement of Irradiated Fuel & During Core Alterations for Plant TXX-9528, LAR 95-008 to License NPF-87 & NPF-89,incorporating Revised Core Safety Limit Curves & Revised N-16 Overtemp Reactor Trip Setpoints,Resulting from Reload Analyses for CPSES Unit 2,Cycle 31995-11-21021 November 1995 LAR 95-008 to License NPF-87 & NPF-89,incorporating Revised Core Safety Limit Curves & Revised N-16 Overtemp Reactor Trip Setpoints,Resulting from Reload Analyses for CPSES Unit 2,Cycle 3 ML20087J7921995-08-15015 August 1995 LAR 95-04 to Licenses NPF-87 & NPF-89,moving Overtemp N-16 Limits from TS to Colr,Per GL 88-16.Changes in LAR 95-04 Originally Submitted in LAR 95-03 on 950512.LAR 95-03 Being Divided Into Four Separate LARs for Ease in Processing ML20087K1721995-08-15015 August 1995 Requests Amend to Licenses NPF-87 & NPF-89,consisting of Change Request 95-05,moving Shutdown Margin Limits from TS to COLR & Providing Guidelines for Removal of cycle-specific Parameter Limits from TS ML20087E2521995-08-11011 August 1995 Suppl to Application for Amends to Licenses NPF-37,NPF-66, NPF-72 & NPF-77,revising TS 3.6.1.7, Containment Purge Ventilation Sys ML20083M8531995-05-12012 May 1995 Application for Amend to Licenses NPF-87 & NPF-89,consisting of LAR 95-03,removing cycle-specific Parameter Limits from Ts,Per GL 88-16 TXX-9509, Application for Amends to Licenses NPF-87 & NPF-89.Amends Would Reduce Min Fuel Oil Vol Requirement During Modes 5 & 6 for Operable EDGs1995-05-0101 May 1995 Application for Amends to Licenses NPF-87 & NPF-89.Amends Would Reduce Min Fuel Oil Vol Requirement During Modes 5 & 6 for Operable EDGs ML20082C6401995-04-0303 April 1995 Suppl to Application for Amends to Licenses NPF-87 & NPF-89 Re Quadrant Power Tilt Ratio TXX-9505, LAR 95-001 to Licenses NPF-87 & NPF-89,changing TS to Address Performance Requirements of Containment Spray Pumps1995-02-28028 February 1995 LAR 95-001 to Licenses NPF-87 & NPF-89,changing TS to Address Performance Requirements of Containment Spray Pumps ML20079B4721994-12-30030 December 1994 LAR 94-022 to Licenses NPF-87 & NPF-89,incorporating Changes to TS to Increase Spent Fuel Storage Capacity.Rev 0 of CPSES Fuel Storage Licensing Rept,Cpses Expansion of Spent Fuel Storage Capacity Encl ML20078R8071994-12-19019 December 1994 Application for Amends to Licenses NPF-87 & NPF-89 to Allow Testing of RPS & ESFAS W/Channel Under Test in Bypass ML20078S0891994-12-19019 December 1994 Application for Amends to Licenses NPF-87 & NPF-89, Requesting Approval of Converted TSs to Format & Content of Improved STSs ML20077F0881994-12-0707 December 1994 License Amend Request 94-020 to Licenses NPF-87 & NPF-89, Revising TS LCO for MSIVs to Increase Allowed Outage Time in Mode 1 & Relocate MSIVs to Full Closure Time Requirement to Program Administratively Controlled ML20077F1951994-12-0606 December 1994 Application for Amends to Licenses NPF-87 & NPF-89, Consisting of LAR 94-021,revising TS to Allow Appropriate Remedial Action for High Particulate Levels in DG Fuel Oil & Other out-of-limit Properties in New DG Fuel Oil ML20078K7461994-11-18018 November 1994 LAR 94-018 to Licenses NPF-87 & NPF-89,revising TS Re Heat Flux Hot Channel Factor ML20077A7071994-11-18018 November 1994 LAR 94-019 to Licenses NPF-87 & NPF-89,removing Accelarated Testing & Special Reporting Requirements for EDGs from TS, Based on GL 94-01 ML20078G7281994-11-11011 November 1994 Application for Amends to Licenses NPF-87 & NPF-89,revising TSs Re Exclusion of Failures from Total Number of Failures Used to Determine Diesel Generator Test Frequency 1999-08-27
[Table view] |
Text
- - - - - _ _ _ -- ._
,1-4
[ ,
h r7 Log # TXX-95215 File # 916 (3/4.1)
,_' ..-- 916 (6.0) clo p
10010 Ref. # 10CFR50.90 7t# ELECTRIC 10CFR50.36 August 15. 1995 C. lance Terry -
Groep Vkr PrrMent,Nwirar l: U. S. Nuclear Regulatory Commission
! Attn: Document Control Desk Washington. DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50 445 AND 50 446 SUBMITTAL OF LICENSE AMENDMENT REQUEST 95 05 CYCLE SPECIFIC PARAMETER LIMITS - SHUTDOWN MARGIN REF: 1) TV Electric letter logged. TXX 95076 from C. L. Terry to the NRC dated May 12. 1995 Gentlemen:
Pursuant to 10CFR50.90. TU Electric hereby requests an amendment to the f CPSES Unit 1 Operating License (NPF 87) and CPSES Unit 2 Operating License (NPF 89) by incorporating the attached changes into the CPSES Units 1 and 2 Technical Specifications. These changes apply equally to CPSES Units 1 and 2.
The proposed changes in this license amendment request (LAR) were originally submitted in LAR 95 03 on May 12, 1995 (reference 1). Based on subsequent discussions with the NRC. LAR 95-03 is being divided into four separate LARs for ease in processing by the NRC and to allow review of the four basic changes separately. The changes which move the Shu.tdown Margin limits from the Technical Specifications to the Core Operating Limits l Report are resubmitted herein. The proposed changes will result in resource savings for TV Electric and the NRC by eliminating license amendment requests now required to change the values of these parameters.
The proposed changes are consistent with the intent of Generic Letter (GL) 8816 which provides guidelines for the removal of cycle-specific parameter limits from the Technical Specifications.
Attachment 2 provides a detailed description of the proposed changes. a safety analysis of the changes, and TV Electric's determination that the proposed changes do not involve a significant hazard consideration.
Attachment 3 provides the affected Technical Specification pages (NUREG-1468), marked up to reflect the proposed changes.
TU Electric requests approval of this proposed license amendment by February 29, 1996, with implementation of the technical specification changes to occur within 30 days of approval, i
i O 9508230065 950815 DR ADOCK0500g5 \
emsy rian isoi aryan sneet o.n.s,Teus n20i.uti
.TXX 9'5215 Page 2 of 2 In accordance with 10CFR50.91(b), TU Electric is providing the State of Texas with a copy of this proposed amendment.
Should you have any questions, please contact Mr. Bob Dacko at (214) 812 8228.
Sincerely, C. L. Terry By:
, J. J. Kelley, Jr.
Vice President of Nuclear Engineering and Support BSD/bd Attachments:
i 1. Affidavit l 2. Description and Assessment
- 3. Affected Technical Specification page (NUREG 1468) as revised by all approved license amendments
Enclosure:
- 1. Generic Letter 88 16 c- Mr. L. J. Callan, Region IV Hr. T. J. Polich, NRR Hr. D. F. Kirsch, Region IV Resident Inspectors, CPSES Mr. Arthur C. Tate Bureau of Radiation Control Texas Department of Public Health 1100 West 49th Street Austin, Texas 78704
r . f _-
- 4 9'
. Attachment 1 to TXX-95215 Page 1 of 1-UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )
)
Texas Utilities Electric Company ) Docket Nos. 50-445
) 50 446
, (Comanche Peak Steam Electric ) License Nos. NPF 87 Station. Units 1 &'2) ) NPF-89 AFFIDAVIT J. J. Kelley. Jr. being duly sworn, hereby deposes and says that he is Vice President of Nuclear Engineering and Support for TV Electric, the licensee herein: that he is duly authorized to sign and file with the Nuclear Regulatory Commission this License Amendment Request 95 05: that he is familiar with the content thereof: and that the matters set forth therein are true and correct to the best of his' knowledge, information and belief.
f J. Kelley, Jr.
Vice President of Nuclear Engineering and Support STATE OF TEXAS )
)
COUNTY OF )
Subscribed and sworn to before me, on this I day of mosi o
Ik Notary Public
'*' DONALD R. WOODLAN
. . Notory Public State of Texas
%p Commission Expires +946
w q' .O .
.Attac'hment 2 to TXX 95215 Page 1 of 5 ,
DESCRIPTION AND ASSESSMENT I. BACKGROUND TU Electric proposes to remove several cycle specific parameter limits i from the Technical Specification (TS) and to add these limits to the Core Operating Limits Report (COLR). The addition of these limits to the COLR ,
is a result of the evolution from contractor performed reload analyses (Westinghouse) to TU Electric performed reload analyses. The content of the current COLR was primarily based on the Westinghouse determination of what plant specific parameter limits should be in the COLR to support reload analyses using their methodologies. TU Electric has largely replaced the need for Westinghouse reload methodologies through the ,
development and subsequent NRC approval of TU Electric reload methodologies. Part of the desirability of performing in house reload analyses is the ability to perform trade offs between operating margins and analytical design margins, whenever appropriate, to optimize the economic performance of the plant while maintaining the required margin of safety. The removal of these parameter limits from the TS and their addition to the COLR improves the efficiency of this process.
The removal of these limits from the TS is consistent with the guidance provided in Generic Letter (GL) 88 16. " Guidance for Technical Specification Changes for Cycle Specific Parameter Limits"-(reference 1).
The limits presented in the COLR may be modified, provided the requirements of Specification 6.9.1.6 are met (i.e., the modifications are determined using NRC approved methodologies and meet all applicable limits of the plant safety analysis). The proposed changes result in resource savings for TU Electric and the NRC by eliminating the periodic license amendment requests that would be required for changes to the values of these cycle specific parameters. ,
The changes contained in this request are plant specific and did not result from changes recommended in the improved Standard Technical Specifications for Westinghouse Plants, NUREG-1431. The CPSES Technical Specifications remain consistent with NUREG-1431. ,
II. DESCRIPTION OF TECHNICAL SPECIFICATIONS CHANGE RE0 VEST The affected Technical Specifications are:
- 1) 3/4.1.1, "Boration Control" The proposed changes remove the values for shutdown margin shown in Specifications 3.1.1.1, 4.1.1.1.1, 3.1.1.2, 4.1.1.2, 3.1.2.2, 3.1.2.4 and 3.1.2.6, add appropriate references to the COLR. and revise the related BASES (3/4.1.1.1 and 3/4.1.1.2 SHUTDOWN MARGIN and 3/4.1.2 B0 RATION SYSTEMS).
, 9,
, . Attachment 2 to TXX-95215 Page 2 of 5
- 2) 6.9.1.6, " Core Operating Limits Report" The proposed changes modify Specification 6.9.1.6a by adding the removed parameter limits to the list of items contained in the COLR, including a reference to tha implementing Technical Specifications.
Specification 6.9.1.6b is revised to add item 19), TU Electric Report, RXE 94 001 A, " Safety Analysis of the Postulated Inadvertent '
Boron Dilution Event in Modes 3, 4, and 5." This report provides NRC approved methodology used in the analysis of required shutdown margin. In addition, Specification 6.9.1.6b items 1) and 17) are revised to specify the removed parameter limits and their implementing specifications. ,
In summary, TU Electric proposes to revise the CPSES Technical Specifications and some of the related BASES by removing the cycle-specific parameter limits for minimum Shutdown Margin from the Technical Specifications, adding this parameter to the list of parameter limits in the COLR, and adding the appropriate references to Administrative Controls section of the Technical Specifications.
III. ANALYSIS Recognizing that the accident analyses may change from cycle to-cycle, the NRC issued Generic Letter (GL) 88 16 which provides guidelines for the removal of cycle specific limits of selected parameters from the Technical Specifications. In order to remove cycle-specific limits, the Generic Letter requires: (1) the addition of the definition of a named formal report that includes the cycle-specific parameter limits that have been established using NRC approved methodology and consistent with all applicable limits of the safety analysis, (2) the addition of an administrative reporting requirement to submit the formal report on cycle-specific parameter limits to the Commission for information, and (3) the modification of individual technical specification sections to note that the cycle specific parameters shall be maintained within the limits provided in the defined formal report.
TU Electric has previously defined the Core Operating Limits Report (COLR), in Specification 1.10, as the appropriate formal report for cycle-s)ecific parameter limits. Appropriate administrative controls requiring tie use of NRC-approved methodology and providing the reporting requirements for the COLR have also been previously defined in Specification 6.9.1.6.Section II above and Attachment 3 describe the modifications to the specific affected Technical Specification sections including appropriate references to the COLR.
The cycle specific nature of the parameter limits for minimum Shutdown Margin to be removed is discussed below:
The shutdown margin is based on the accident analyses performed for a specific cycle. As previously described, the accident analyses
- w a
. Attachment 2 to TXX 95215 :
Page 3 of 5' :
performed to justify the required shutdown margin would be performed in accordance with approved methodologies and must satisfy NRC-approved event acceptance criteria.
Administrative Controls Consistent with the requirements of GL 8816, the Administrative Controls section of the Technical Specifications has been revised to ensure that the removed parameter limits are contained in the COLR, and that those limits are established using NRC approved methodology and art consistent with all applicable limits of the safety analysis. As part of the revision to this section, Specification 6.9.1.6b has been revised to add item 19), TV Electric Report, RXE-94 001 A, " Safety Analysis of the Postulated Inadvertent Boron Dilution Event in Modes 3, 4, and 5." The methodology contained in this report is used in the analysis of required shutdown margin and has been approved by the NRC as documented in reference 2.
Summary l
The limits on the parameters which are removed from the Technical Specifications and added to the COLR must be developed or justified using i NRC approved methodologies. All accident analyses, performed in '
accordance with these methodologies, must meet the applicable NRC -
approved limits of the safety analysis. The removal of )arameter limits ;
from the Technical Specification and their addition to t1e COLR does not obviate the requirement to operate within those limits. Furthermore, any ,
changes to these limits must be performed in accordance with Specification L 6.9.1.6c. If any of the applicable limits of the safety analyses are not met, prior NRC approval of the change is required, just as is the case for a license amendment request. For the more routine modifications, where NRC approved methodologies and limits of the safety analysis remain applicable, the potentially burdensome and lengthy process of amending the .
Technical Specifications may be avoided. These changes are essentially !
administrative and the required level of safety is maintained.
1 IV. SIGNIFICANT HAZARDS CONSIDERATIONS ANALYSIS l TU Electric has evaluated whether or not a significant hazards i consideration is involved with the proposed changes by focusing on the three standards set forth in 10CFR50.92(c) as discussed below:
- 1. Do the proposed changes involve a significant increase in the probability or consequences of an accident previously evaluated?
The proposed changes remove cycle specific parameter limits from the Technical Specifications, add them to the list of limits contained in the Core Operating Limits Report (COLR), and revise the Administrative Controls section of the Technical Specifications. ,
The' changes do not, by themselves, alter any of the parameter l
l
- c. ; '
.Attabhment2toTXX-95215 Page 4 of 5 limits. The changes are administrative in nature and have no adverse effect on the probability of an accident or on the consequences of an accident previously evaluated. The removal of parameter. limits from the Technical Specifications does not eliminate the requirement to comply with the parameter limits.
The parameter limits in the COLR may be revised without prior NRC approval. However, Specification 6.9.1.6c continues to ensure that the parameter limits are developed using NRC approved methodologies and that applicable limits of the safety analyses are met. While future changes to the COLR parameter limits could result in event consequences which are either slightly less or slightly more severe than the consequences for the same event using the present parameter limits, the differences would not be significant and would be bounded by the requirement of specification 6.9.1.6c to meet the applicable limits in the safety analysis.
Based on the above, removal of the parameter limits from the Technical Specifications and the addition of these limits the list of limits in the COLR thus allowing revision of the parameter limits without prior NRC approval, has no significant effect on the probability or consequences of an accident previously evaluated.
- 2. Do the proposed changes create the possibility of a new or different kind of accident from any accident previously evaluated?
The proposed changes remove certain parameter limits from the Technical Specifications and add these limits to the list of limits in the COLR, removing the requirement for prior NRC approval of revisions to those parameters. The changes do not add new hardware or change plant operations and therefore cannot initiate an event nor cause an analyzed event to progress differently. Thus, the possibility of a new or different kind of accident is not created.
- 3. Do the proposed changes involve a significant reduction in a margin of safety?
The margin of safety, as it relates to a parameter limit is the difference between the acceptance criterion for that parameter and its failure value. The proposed changes do not affect the failure values for any system. Through the accident analyses, all relevant event acceptance criteria (as described in the NRC approved analysis methodologies) are shown to be satisfied; therefore, there is no impact on an event acceptance criteria. Because neither the failure ,
values nor the acceptance criteria are affected, the proposed change has no effect on the margin of safety.
Based on the above evaluations. TV Electric concludes that the activities ,
associated with the proposed changes satisfy the no significant hazards consideration standards of 10CFR50.92(c) and accordingly, a no significant hazards consideration finding is justified.
e, n "l
. Attachment 2 to TXX 95215 Page 5 of 5 V. ENVIRONMENTAL EVALUATION j TV Electric has evaluated the proposed changes and has determined that the I' changes do not involve (1) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of g any effluent that may be released offsite, or (iii) a significant increase L in individual or cumulative occupational radiation exposure. Accordingly, the proposed changes meet the eligibility criterion for categorical exclusion set forth in 10CFR51.22(c)(9). Therefore, pursuant to 10CFR51.22(b), an environmental assessment of the proposed change is not required.
VI. REFERENCES
- 1. Generic Letter 8816 " Guidance for Technical Specification Changes for Cycle Specific Parameter Limits," October 4, 1988
- 2. NRC letter from Thomas A. Bergman to Mr. William J. Cahill, Jr.,
dated November 3, 1993.
.I i
l l
l l
I
j y N[g **
l i
.i l
'I t 5 ) .
, i i
5
~ Attachment 3 t
AFFECTED TECHNICAL SPECIFICATION PAGES !
(NUREG 1468) ,
i (Pages-3/4 1-1, 3/4 1 3 3/4 1 8, 3/4 1 10. 3/4 1 13.
B 3/4 1 1, B 3/4 1 2, B 3/4 1 3, 6 20, 6-21, 6 21a) -j i
i f
.i
-i i
5 I
4 r
.t 1
b t
t h
i i
I f
t t
.k i