Request Change in Implementation Period for 6 Applications for Fermi 2 Operating License Amends Currently Under NRC Review.Applications Requested Timed Period of 60 Days within Which to Implement License Amend Following NRC Approval
ML20248L330
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 03/10/1998
From: Earley A
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-98-0036, CON-NRC-98-36 NUDOCS 9803190349
Download: ML20248L330 (3)


Text

_ - - - - - - _ _

, Anthony F. Earicy, Jr.

President and Chief Operating Officer The Detroit Edison Company 20002nd Ave., Detroit,MI 482261279 Tel: 313.235.8000 Detroit Edison 10CFR50.92 March 10,1998 NRC-98-0036 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555-0001

Reference:

Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43

Subject:

Implementation Period for Operatine License Amendments I The purpose of this letter is to request a change in the implementation period for six applications for Fermi 2 Operating License Amendments currently under review by the NRC. Each of these applications requested a time period of 60 days within which to implement a License Amendment following its approval by the NRC. As part of the assessment ofits License Amendment implementation process, the Fermi 2 staff has identified that the Fermi 2 implementation process could be improved by generally allowing a longer time period to perform implementation t.ctivities. These implementation activities typically include revising procedures, revising the Updated Final Safety Analysis Report, revising the surveillance scheduling program, and providing training to plant operators and support staff. Accordingly, future applications for License Amendments submitted by the Fermi 2 staff will typically request an implementation period of 90 days.

In order to provide for a similar 90 day implementation period for six applications l for License Amendments currently under NRC review, the Fermi 2 staffis requesting  ! i that their implementation periods also be increased to 90 days. Specifically, it is ,.I  !

requested that the following applications for License Amendments be approved by ) {!

the NRC with c period of 90 days within which to implement the License Amendment:

9803190349 980310 PDR ADOCK 05000341 P PDR, _ A DTE Energy Company

,. USNRC NRC-98-0036 Page 2 Fermi 2 Letter Number /DaterrAC# Subiect l NRC-97-0089 - September 29,1997 Relocation ofInstrumentation (TAC M99746) Technical Specifications per Generic Letter 95-10 l NRC097-0037 - June 20,1997 Relocation ofMG Set Scoop Tube (TAC M99071) Stop Setting Surveillance NRC-96-0085 - September 25,1996 Deletion of Periodic Testing of (TAC M96664) Thermal Overload Protective Devices NRC-98-0003 - January 28,1998 Revision ofThermal-Hydraulic (TAC MA0721) Stability, Idle Recirculation Loop Startup, and Post Accident Monitoring Technical Specifications

, NRC-98-0006 - January 28,1998 Extension of Leak Rate Test (TAC MA0719) Surveillance Interval for the Pressure Isolation Valves NRC-98-0008 - January 28,1998 Permit Testing of the Reactor Mode (TAC MA0718) Switch Refuel Position Interlocks with One or More Control Rods Withdrawn from Defueled Cells Should you have any questions or require additional information, please contact Mr. Norman K. Peterson of my staff at (734) 586-4258.

Sincerely, 1 -

Anthony F. ' th" cc: A. B. Beach B. L. Burgess G. A. Harris A. J. Kugler  ;

Supervisor, Electric Operators, J Michigan Public Service Commission l

. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -____n

m.' USNRC I NRC-98-0036 Page 3

~{

I, ANTHONY F. EARLEY, JR., do hereby affirm that the foregoing statements are based on facts and circumstances which are true and accurate to the best of my knowledge and belief.

j sa, /

AN'THONY #EAMY, JR. / '

President and Chief Operating O icer On this day of .1998 before me personally appeared Anthony F. Earley, Jr., being first duly sworn and says that he executed the foregoing as his free act and deed.

uMEOR Notary Public l l

BERNADETTE E. WILSON Noery Putsc, Wayne county,MI  !

% Openission Erpires Dec.7,301 l