ML20215L839
Letter Sequence Other | |
---|---|
TAC:66415, (Open) | |
Initiation Questions
Results
Other: ML20096C682, ML20149J903, ML20149J964, ML20151X241, ML20209H917, ML20215L839, ML20216H604, ML20235W129, ML20236H021, ML20236X859, ML20237A688 | |
MONTHYEARML20096C6631984-08-27027 August 1984
[Table View]Application for Amend to License NPF-3,revising Tech Specs to Reflect Changes in Reactor Vessel Matls Irradiation Surveillance Schedule & Flow Verification of Auxiliary Feedwater Sys.Fee Paid Project stage: Request ML20096C6401984-08-27027 August 1984 Forwards Application to Amend License NPF-3,revising Tech Specs to Reflect Changes in Reactor Vessel Matls Irradiation Surveillance Schedule & Flow Verification of Auxiliary Feedwater Sys Project stage: Request ML20096C6821984-08-27027 August 1984 Proposed Tech Specs Reflecting Changes in Reactor Vessel Matls Irradiation Surveillance Schedule & Flow Verification of Auxiliary Feedwater Sys Project stage: Other B12414, Application for Amend to License NPF-49,extending 18-month Surveillance Testing Requirements for Diesel Generator Up to 4 Months Beyond Max Allowed by Tech Spec Section 4.0.2,on one-time Basis1987-01-30030 January 1987 Application for Amend to License NPF-49,extending 18-month Surveillance Testing Requirements for Diesel Generator Up to 4 Months Beyond Max Allowed by Tech Spec Section 4.0.2,on one-time Basis Project stage: Request ML20209H9171987-01-31031 January 1987 Proposed Tech Specs,Extending Diesel Generator 18-month Surveillance Requirements Up to 4 Months Beyond Max Allowed by Tech Spec Section 4.0.2 on one-time Basis Project stage: Other B12448, Submits Addl Info Re 870130 Application for Amend to License NPF-49,revising Tech Specs to Extend Diesel Generator 18-month Surveillance Testing Requirements,Per 870224 Telcon1987-03-0606 March 1987 Submits Addl Info Re 870130 Application for Amend to License NPF-49,revising Tech Specs to Extend Diesel Generator 18-month Surveillance Testing Requirements,Per 870224 Telcon Project stage: Request ML20215K3801987-05-0404 May 1987 Requests Reissuance of Table 3.6-2, Containment Isolation Valves of Tech Spec 3/4.6.3,correcting Typos in 840911 Application to Amend License NPF-3 Project stage: Request ML20215L8141987-05-0404 May 1987 Forwards Application for Amend to License NPF-3,deleting Portion of Tech Spec Surveillance Requirement 4.7.1.2d to Reflect Mods to Steam Line Piping to Auxiliary Feed Pump Turbine Following 850609 Loss of Feedwater Event.Fee Paid Project stage: Request ML20215L8351987-05-0404 May 1987 Application for Amend to License NPF-3,deleting Portion of Tech Spec Surveillance Requirement 4.7.1.2d Re Auxiliary Feedwater Sys as Result of 850609 Loss of Feedwater Event. Supporting Documentation Encl Project stage: Request ML20215L8391987-05-0404 May 1987 Proposed Tech Specs Re Auxiliary Feedwater Sys Surveillance Requirement 4.7.1.2d Project stage: Other ML20214K7241987-05-20020 May 1987 Forwards Application for Amend to License NPF-3,revising Tech Specs Re Fire Protection to Assist in Transfer of Fire Protection Program to Updated Sar,Per Generic Ltr 86-10.Fee Paid Project stage: Request ML20214K7551987-05-20020 May 1987 Application for Amend to License NPF-3,revising Tech Specs Re Fire Protection to Implement Guidance of Generic Ltr 86-10 & to Transfer Fire Protection Program to Updated SAR Project stage: Request ML20214K7721987-05-20020 May 1987 Proposed Changes to Tech Specs Re Fire Protection to Assist in Transfer of Fire Protection Program to Updated Sar,Per Generic Ltr 86-10.Safety Evaluation & Significant Hazards Consideration Encl Project stage: Request ML20216H6041987-06-25025 June 1987 Advises That Based on B&W Analytical Studies for Primary Sys Blowdown Using RELAP5,use of Blowdown Valves Not Practicable for Feed & Bleed,Per 851204 Commitment.Listed Proposed Mods Will Be Implemented to Enhance Makeup Sys Project stage: Other ML20235W1291987-10-0909 October 1987 Proposed Tech Specs,Allowing one-time Extension of 18 Month Emergency Diesel Generator Surveillance Interval Project stage: Other ML20235W1271987-10-0909 October 1987 Application for Amend to License NPF-3,revising Tech Specs to Allow one-time Extension of 18 Month Surveillance Interval for Insp & Operability Testing of Emergency Diesel Generators Project stage: Request ML20235W1121987-10-0909 October 1987 Forwards Application for Amend to License NPF-3.Amend Revises Tech Specs to Allow one-time Extension in 18 Month Surveillance Interval for Insp & Operability Testing of Emergency Diesel Generators.Fee Paid Project stage: Request ML20236H0211987-10-27027 October 1987 Proposed Tech Specs,Changing Section 3/4.3.2, Safety Sys Instrumentation, Table 3.3-5 & Section 3/4.6.3, Containment Isolation Valves, Table 3.6-2 to Support Enhanced Feed & Bleed Mods Project stage: Other ML20236G9801987-10-27027 October 1987 Application for Amend to License NPF-3,revising Tech Spec Section 3/4.3.2, Safety Sys Instrumentation, Table 3.3-5 & Section 3/4.6.3, Containment Isolation Valves, Table 3.6-2 to Support Enhanced Feed & Bleed Mods.Fee Paid Project stage: Request ML20236N1671987-11-0707 November 1987 Discusses 871029 & 30 Fire Protection Meetings in Bethesda, MD Re Issues Which Have Arisen in Conjunction W/Licensee App R Reappraisal Effort,Including Status of Fire Protection on Plant Mods.List of Attendees Encl Project stage: Meeting ML20236X8591987-12-0707 December 1987 Proposed Tech Specs Re Fire Protection Project stage: Other ML20236X8331987-12-0707 December 1987 Application for Amend to License NPF-3,revising Tech Specs Re Fire Protection Project stage: Request ML20236X8221987-12-0707 December 1987 Forwards Application for Amend to License NPF-3,revising Tech Specs Re Fire Protection Per Generic Ltr 86-10 Project stage: Request ML20237A6881987-12-0808 December 1987 Informs of Changes Necessary to Support Fifth Refueling Outage in Feb 1988.Key Amend Requests Placed Into 1 of 3 Listed Categories.Nrc Should Allocate Necessary Resources to Provide Timely Support for Review & Issuance of Amends Project stage: Other ML20236Y3421987-12-0808 December 1987 Forwards Application for Amend to License NPF-3,revising Tech Spec 4.6.1.2c.3,Section 3/4.6.1.2 Re Containment Sys & Containment Leakage.Fee Paid Project stage: Request ML20149J9031988-02-10010 February 1988 Forwards Environ Assessment & Finding of No Significant Impact Re Util 871207 Application for Amend to License NPF-3 to Update Tech Specs to Reflect Current Plant Design, Testing & Compensatory Measures Re Fire Protection Features Project stage: Other ML20149J9641988-02-10010 February 1988 Environ Assessment & Finding of No Significant Impact Based on Util 871207 Application for Amend to License NPF-3, Updating Tech Specs to Reflect Current Plant Design,Testing & Compensatory Measures Re Fire Protection Features Project stage: Other ML20150B0321988-03-0707 March 1988 Forwards Application for Amend to License NPF-3 Changing Tech Spec Section 4.6.1.2.a to Allow Third Type a Test & 10-yr Inservice Insps to Be Uncoupled & Performed in Separate Refueling Outages.Fee Paid Project stage: Request ML20151X2411988-04-29029 April 1988 Forwards Discussion of & Proposed Revs to Tech Specs for Resolution of NRC Comments Concerning Deletion of Auxiliary Feedwater Pump Turbine Inlet Steam Pressure Interlock Operability Requirements,Per 880406 Telcon Project stage: Other ML20154N9081988-09-23023 September 1988 Summary of 880721 Meeting/Util in Rockville,Md Re Licensee App R Reappraisal Efforts.List of Meeting Attendees & Viewgraphs Encl Project stage: Meeting 1987-12-08 |
ML20215L839 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 05/04/1987 |
From: | TOLEDO EDISON CO. |
To: | |
Shared Package | |
ML20215L818 | List: |
References | |
TAC-66415, NUDOCS 8705120395 | |
Download: ML20215L839 (4) | |
Similar Documents at Davis Besse | |
---|---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20216E6111999-09-0707 September 1999
[Table view]Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210H0731999-07-28028 July 1999 Proposed Tech Specs 3/4.7.5.1, Ultimate Heat Sink, Allowing Plant Operation in Modes 1-4 with Water Temp Less than or Equal to 90 F ML20210G4311999-07-27027 July 1999 Proposed Tech Specs,Changing TSs 6.4, Training, 6.5.2.8, Audits, 6.10, Record Retention, 6.14, Process Control Program & 6.15, Odcm ML20210G4801999-07-26026 July 1999 Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210G9161999-07-26026 July 1999 Proposed Tech Specs 3/4.3.3.1, Radiation Monitoring Instrumentation, 3/4.3.3.2, Instrumentation - Incore Detectors & 3/4.3.3.9, Instrumentation - Waste Gas Sys Oxygen Monitor ML20210G5391999-07-26026 July 1999 Proposed Tech Specs Re Implementation of 10CFR50,App J, Option B for Type B & C Containment Leakage Rate Testing ML20195F9351999-06-10010 June 1999 Proposed Tech Specs,Revising TS 3/4.6.4.4, Hydrogen Purge Sys, TS 3/4.6.5.1, Shield Bldg Emergency Ventilation Sys & TS 3/4.6.5.1, Crevs ML20207E7941999-05-21021 May 1999 Proposed Tech Specs Allowing Use of Expanded Spent Fuel Storage Capability ML20205E5031999-03-19019 March 1999 Proposed Tech Specs Withdrawing Proposed New Action B, Previously Submitted in 981027 Application ML20204F1821999-03-0909 March 1999 Proposed Tech Specs,Adopting Changes in Frequency & Scope of Volumetric & Surface Exams Justified by W TR WCAP-14535A ML20155E3231998-10-28028 October 1998 Proposed Tech Specs Revising Various Sections of 6.0, Administrative Controls, Including Relocation of 6.11 Contents to Plant Ufsar,Per NUREG-1430,Rev 1 ML20155E4971998-10-28028 October 1998 Proposed Tech Specs 4.0.2 Re Applicability of 25% Surveillance Interval Extension Allowance ML20155D7791998-10-27027 October 1998 Proposed Tech Specs Relocating TS SR 4.6.5.1.d.4 Re Evs Negative Pressure Testing to TS 3/4.6.5.2,deleting TS Definition 1.24 & Making Related Changes Associated with Deletion of Subject Definition ML20155E0721998-10-27027 October 1998 Proposed Tech Specs Revising 3/4.3.1.1 Re RPS Instrumentation & 3/4.3.2.3 Re ARTS Instrumentation,To Provide Potential Reduction in Spurious Trip Rate for Potential Cost Savings in Excess of $50,000 ML20155D8521998-10-27027 October 1998 Proposed Tech Specs Revising SRs 4.8.2.3.2.d,4.8.2.3.2.e, 4.8.2.3.2.f & Table 4.8-1 Re Testing of 125 Volt DC Station Batteries & Applicable TS Bases ML20151W2991998-09-0808 September 1998 Proposed Tech Specs Revising Section 3/4.7.6, Plant Systems - CREVS & Associated Bases ML20151W3071998-09-0808 September 1998 Proposed Tech Specs Permitting Use of Framatome Cogema Fuels M5 Advanced Alloy for Fuel Rod Cladding & Fuel Assembly Spacer Grids ML20217P8351998-04-24024 April 1998 Proposed Tech Specs Clarifying Discussion of Margin Between RPS High Pressure Trip Setpoint & Lift Setting for Pressurizer Code Safety Valves ML20217P8811998-04-24024 April 1998 Proposed Tech Specs 3/4.3.1.1,3/4.3.2.1,3/4.3.2.2 & Associated Bases Relocating Tables of Response Time Limits to Plant USAR Technical Requirements Manual ML20217C4881998-03-20020 March 1998 Proposed Tech Specs SR 4.4.5.3.c.1,providing Greater Specificity as to Location of Addl Insps in Unaffected SG ML20217N4471998-02-27027 February 1998 Proposed Tech Specs Pages Provided to Modify Proposed New Action 3.7.6.1.b to Make More Consistent w/NUREG-1431 ML20203L1111998-02-26026 February 1998 Proposed Tech Specs Pages Re Amend to License NPF-3 Involving Incorporation of New Repair Roll Process for SG Tubes W/Defects in Upper Tube Sheet ML20197J2621997-12-23023 December 1997 Proposed Tech Specs Pages Re Changes to TS Definition 1.2, TS 3/4/9.5 & New TS 3.0.6 & Associated Bases.Ts Index Rev to Reflect Change to TS 3/4.9.5,included ML20197J5971997-12-23023 December 1997 Proposed Tech Specs Pages,Revising TS Surveillance Requirements for ISI Requirements of Internal Auxiliary Feedwater Header,Header to Shroud Attachment Welds & External Header Thermal Sleeves ML20217R2821997-08-26026 August 1997 Proposed Tech Specs,Clarifying LCO 3.6.1.3.a & Revising Surveillance Requirement 4.6.1.3.c ML20217R2871997-08-26026 August 1997 Proposed Tech Specs,Modifying TS 3.2.5 Action Statement to Require Power Reduction to Less than 5% of Rated Thermal Power within Four Hrs If RCS Flow Rate Is Less than Specified Limit for Greater than Two Hrs ML20217G5981997-07-29029 July 1997 Proposed Tech Specs 3/4.4.3 Re Safety Valves & Pilot Operated Relief valve-operating ML20141F1101997-06-24024 June 1997 Proposed Tech Specs,Deleting Requirements for Safety Features Actuation Sys Containment High Radiation Monitors ML20138C3261997-04-18018 April 1997 Proposed Tech Specs 3/4.7.6 Revising Limiting Condition for Operation to Include New Required Actions in Event That One or Both Channels of Radiation Monitoring Instrumentation Becomes Inoperable ML20138A6891997-04-18018 April 1997 Proposed Tech Specs 3/4.5.3.2.1 & 3/4.5.2 Modifying Presently Specified 18-month Surveillance Frequencies to New Specified Frequencies of Once Each 24-months ML20138M1281997-02-14014 February 1997 Proposed Tech Specs 3.5.2 Re Emergency Core Cooling Systems & 4.5.2.f Re Surveillance Requirements ML20134L0561997-02-13013 February 1997 Proposed Tech Specs Re Changes Made Concerning Decay Heat Removal Sys Valve ML20134D7621997-01-30030 January 1997 Proposed Tech Specs Revising SR Intervals from 18 to 24 Months Based on Results of DBNPS Instrument Drift Study & TS 2.2, Limiting Safety Sys Settings, Based on Results of Revised Framatome RPS Instrument String Error ML20134F1811997-01-30030 January 1997 Proposed Tech Specs Re Possession & Use of SNM as Reactor Fuel ML20134B0591997-01-20020 January 1997 Proposed Tech Specs 3/4.5.3 Re ECCS Subsystems ML20132B7031996-12-11011 December 1996 Proposed Tech Specs Revising TS Definitions,Instrumentation TS & ECCS TS for Conversion to 24 Month Fuel Cycle for License NPF-3 ML20134F1891996-10-28028 October 1996 Proposed Tech Specs 3/4.8 Re Electrical Power Systems ML20117P5311996-09-17017 September 1996 Proposed Tech Specs,Supporting Conversion of DBNPS from 18 Month to 24 Month Fuel Cycle ML20117N8531996-09-12012 September 1996 Proposed Tech Specs Re Reactivity Control Systems & Emergency Core Cooling Systems ML20117M2201996-09-0404 September 1996 Proposed Tech Specs 6.2.3,removing Specific Overtime Limits & Working Hours ML20116K2631996-08-0707 August 1996 Proposed Tech Specs Re Definitions,Applicability Bases, Containment Spray Sys & Containment Isolation Valve for Conversion to 24 Month Fuel Cycle ML20117K1911996-05-28028 May 1996 Proposed Tech Specs 3/4.3.1.1 - RPS Instrumentation & TS 3/4.3.2.3 - Anticipatory RTS Instrumentation Increasing Trip Device Test Interval ML20101M1921996-03-29029 March 1996 Proposed Tech Specs 3/4.6.4.4 - HPS,3/4.6.5.1 - Shield Building Evs & 3.4.7.6.1 - CREVS Re Changing Surveillance Requirements for Charcoal Filter Lab Testing to Revise Methodology Used to Determine Operability in ESF AHUs ML20101C6961996-03-0606 March 1996 Proposed Tech Specs,Allowing Deferment of SR 4.5.2.b for ECCS Flowpath Containing HPI Pump 1-2 Until 10th Refueling Outage,Scheduled to Begin 960408 ML20100E0101996-02-0505 February 1996 Proposed TS 3/4.3.2.1,Table 3.3-3,safety Features Actuation Sys Instrumentation,Reflecting Design & Actuation Logic of Plant Sequencers & Essential Bus Undervoltage Relays ML20095F5891995-12-12012 December 1995 Proposed Tech Specs Re Containment Sys ML20094D0611995-10-31031 October 1995 Proposed TS Page 6-18,deleting TS 6.9.2.d, Seismic Event Analysis ML20098C5181995-10-0202 October 1995 Proposed Tech Specs,Revising TS Section 5.0,design Features & Adopting Improved STS for B&W Plants Format & Content ML20098C4111995-09-29029 September 1995 Proposed TS 3/4.1.2.8 Re Reactivity Control Sys - Borated Water Sources - Shutdown TS 3/4.1.2.8 Re Reactivity Control Sys - Operating & TS 3/4.5.1 Re ECCS - Core Flooding Tanks ML20098C1121995-09-29029 September 1995 Proposed TS 3.4.3 & Associated Bases,Modifying Lift Setting of Pressurizer Code Safety Valves to Greater than or Equal to 2,575 Psig,Corresponding to Lift Setting Tolerance of +3% of Nominal Lift Pressure 1999-09-07 Category:TECHNICAL SPECIFICATIONS & TEST REPORTS MONTHYEARML20216E6111999-09-0707 September 1999
[Table view]Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210H0731999-07-28028 July 1999 Proposed Tech Specs 3/4.7.5.1, Ultimate Heat Sink, Allowing Plant Operation in Modes 1-4 with Water Temp Less than or Equal to 90 F ML20210G4311999-07-27027 July 1999 Proposed Tech Specs,Changing TSs 6.4, Training, 6.5.2.8, Audits, 6.10, Record Retention, 6.14, Process Control Program & 6.15, Odcm ML20210G4801999-07-26026 July 1999 Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210G9161999-07-26026 July 1999 Proposed Tech Specs 3/4.3.3.1, Radiation Monitoring Instrumentation, 3/4.3.3.2, Instrumentation - Incore Detectors & 3/4.3.3.9, Instrumentation - Waste Gas Sys Oxygen Monitor ML20210G5391999-07-26026 July 1999 Proposed Tech Specs Re Implementation of 10CFR50,App J, Option B for Type B & C Containment Leakage Rate Testing ML20195F9351999-06-10010 June 1999 Proposed Tech Specs,Revising TS 3/4.6.4.4, Hydrogen Purge Sys, TS 3/4.6.5.1, Shield Bldg Emergency Ventilation Sys & TS 3/4.6.5.1, Crevs ML20207E7941999-05-21021 May 1999 Proposed Tech Specs Allowing Use of Expanded Spent Fuel Storage Capability ML20205E5031999-03-19019 March 1999 Proposed Tech Specs Withdrawing Proposed New Action B, Previously Submitted in 981027 Application ML20204F1821999-03-0909 March 1999 Proposed Tech Specs,Adopting Changes in Frequency & Scope of Volumetric & Surface Exams Justified by W TR WCAP-14535A ML20155E4971998-10-28028 October 1998 Proposed Tech Specs 4.0.2 Re Applicability of 25% Surveillance Interval Extension Allowance ML20197G5521998-10-28028 October 1998 Rev 8 to Dbnps,Unit 1 Technical Requirements Manual ML20155E3231998-10-28028 October 1998 Proposed Tech Specs Revising Various Sections of 6.0, Administrative Controls, Including Relocation of 6.11 Contents to Plant Ufsar,Per NUREG-1430,Rev 1 ML20155D7791998-10-27027 October 1998 Proposed Tech Specs Relocating TS SR 4.6.5.1.d.4 Re Evs Negative Pressure Testing to TS 3/4.6.5.2,deleting TS Definition 1.24 & Making Related Changes Associated with Deletion of Subject Definition ML20155D8521998-10-27027 October 1998 Proposed Tech Specs Revising SRs 4.8.2.3.2.d,4.8.2.3.2.e, 4.8.2.3.2.f & Table 4.8-1 Re Testing of 125 Volt DC Station Batteries & Applicable TS Bases ML20155E0721998-10-27027 October 1998 Proposed Tech Specs Revising 3/4.3.1.1 Re RPS Instrumentation & 3/4.3.2.3 Re ARTS Instrumentation,To Provide Potential Reduction in Spurious Trip Rate for Potential Cost Savings in Excess of $50,000 ML20151W3071998-09-0808 September 1998 Proposed Tech Specs Permitting Use of Framatome Cogema Fuels M5 Advanced Alloy for Fuel Rod Cladding & Fuel Assembly Spacer Grids ML20151W2991998-09-0808 September 1998 Proposed Tech Specs Revising Section 3/4.7.6, Plant Systems - CREVS & Associated Bases ML20206D2721998-08-28028 August 1998 Rev 11,change 1 to Odcm ML20217P8351998-04-24024 April 1998 Proposed Tech Specs Clarifying Discussion of Margin Between RPS High Pressure Trip Setpoint & Lift Setting for Pressurizer Code Safety Valves ML20217P8811998-04-24024 April 1998 Proposed Tech Specs 3/4.3.1.1,3/4.3.2.1,3/4.3.2.2 & Associated Bases Relocating Tables of Response Time Limits to Plant USAR Technical Requirements Manual ML20217C4881998-03-20020 March 1998 Proposed Tech Specs SR 4.4.5.3.c.1,providing Greater Specificity as to Location of Addl Insps in Unaffected SG ML20217N4471998-02-27027 February 1998 Proposed Tech Specs Pages Provided to Modify Proposed New Action 3.7.6.1.b to Make More Consistent w/NUREG-1431 ML20203L1111998-02-26026 February 1998 Proposed Tech Specs Pages Re Amend to License NPF-3 Involving Incorporation of New Repair Roll Process for SG Tubes W/Defects in Upper Tube Sheet ML20197J2621997-12-23023 December 1997 Proposed Tech Specs Pages Re Changes to TS Definition 1.2, TS 3/4/9.5 & New TS 3.0.6 & Associated Bases.Ts Index Rev to Reflect Change to TS 3/4.9.5,included ML20197J5971997-12-23023 December 1997 Proposed Tech Specs Pages,Revising TS Surveillance Requirements for ISI Requirements of Internal Auxiliary Feedwater Header,Header to Shroud Attachment Welds & External Header Thermal Sleeves ML20217M5601997-09-0505 September 1997 Rev 11.0 to Davis-Besse Odcm ML20217R2821997-08-26026 August 1997 Proposed Tech Specs,Clarifying LCO 3.6.1.3.a & Revising Surveillance Requirement 4.6.1.3.c ML20217R2871997-08-26026 August 1997 Proposed Tech Specs,Modifying TS 3.2.5 Action Statement to Require Power Reduction to Less than 5% of Rated Thermal Power within Four Hrs If RCS Flow Rate Is Less than Specified Limit for Greater than Two Hrs ML20217G5981997-07-29029 July 1997 Proposed Tech Specs 3/4.4.3 Re Safety Valves & Pilot Operated Relief valve-operating ML20141F1101997-06-24024 June 1997 Proposed Tech Specs,Deleting Requirements for Safety Features Actuation Sys Containment High Radiation Monitors ML20138C3261997-04-18018 April 1997 Proposed Tech Specs 3/4.7.6 Revising Limiting Condition for Operation to Include New Required Actions in Event That One or Both Channels of Radiation Monitoring Instrumentation Becomes Inoperable ML20138A6891997-04-18018 April 1997 Proposed Tech Specs 3/4.5.3.2.1 & 3/4.5.2 Modifying Presently Specified 18-month Surveillance Frequencies to New Specified Frequencies of Once Each 24-months ML20140D9481997-04-0909 April 1997 ODCM, Rev 10 ML20138M1281997-02-14014 February 1997 Proposed Tech Specs 3.5.2 Re Emergency Core Cooling Systems & 4.5.2.f Re Surveillance Requirements ML20134L0561997-02-13013 February 1997 Proposed Tech Specs Re Changes Made Concerning Decay Heat Removal Sys Valve ML20134F1811997-01-30030 January 1997 Proposed Tech Specs Re Possession & Use of SNM as Reactor Fuel ML20134D7621997-01-30030 January 1997 Proposed Tech Specs Revising SR Intervals from 18 to 24 Months Based on Results of DBNPS Instrument Drift Study & TS 2.2, Limiting Safety Sys Settings, Based on Results of Revised Framatome RPS Instrument String Error ML20134B0591997-01-20020 January 1997 Proposed Tech Specs 3/4.5.3 Re ECCS Subsystems ML20132B7031996-12-11011 December 1996 Proposed Tech Specs Revising TS Definitions,Instrumentation TS & ECCS TS for Conversion to 24 Month Fuel Cycle for License NPF-3 ML20134F1891996-10-28028 October 1996 Proposed Tech Specs 3/4.8 Re Electrical Power Systems ML20117P5311996-09-17017 September 1996 Proposed Tech Specs,Supporting Conversion of DBNPS from 18 Month to 24 Month Fuel Cycle ML20117N8531996-09-12012 September 1996 Proposed Tech Specs Re Reactivity Control Systems & Emergency Core Cooling Systems ML20117M2201996-09-0404 September 1996 Proposed Tech Specs 6.2.3,removing Specific Overtime Limits & Working Hours ML20116K2631996-08-0707 August 1996 Proposed Tech Specs Re Definitions,Applicability Bases, Containment Spray Sys & Containment Isolation Valve for Conversion to 24 Month Fuel Cycle ML20117K1911996-05-28028 May 1996 Proposed Tech Specs 3/4.3.1.1 - RPS Instrumentation & TS 3/4.3.2.3 - Anticipatory RTS Instrumentation Increasing Trip Device Test Interval ML20101M1921996-03-29029 March 1996 Proposed Tech Specs 3/4.6.4.4 - HPS,3/4.6.5.1 - Shield Building Evs & 3.4.7.6.1 - CREVS Re Changing Surveillance Requirements for Charcoal Filter Lab Testing to Revise Methodology Used to Determine Operability in ESF AHUs ML20101C6961996-03-0606 March 1996 Proposed Tech Specs,Allowing Deferment of SR 4.5.2.b for ECCS Flowpath Containing HPI Pump 1-2 Until 10th Refueling Outage,Scheduled to Begin 960408 ML20100E0101996-02-0505 February 1996 Proposed TS 3/4.3.2.1,Table 3.3-3,safety Features Actuation Sys Instrumentation,Reflecting Design & Actuation Logic of Plant Sequencers & Essential Bus Undervoltage Relays ML20107C3101995-12-21021 December 1995 Rev 9 to Odcm 1999-09-07 |
Text
r ,
1 THIS PAGE PROVIDED l l
PLANT SYSTEMS 81'0 l
AUXILIARY FEEDWATER SYSTEM T0 0 ""
LIMITING CONDITION FOR OPERATION 3.7.1.2 Two independent steam generator auxiliary feedwater pumps and associated flow paths shall be OPERABLE.
APPLICABILITY: MODES 1,-2 and 3*.
ACTION:
- a. With one Auxiliary Feedwater System inoperable, restore the inoperable system to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.7.1.2 Each Auxiliary Feedwater System shall be demonstrated OPERABLE:
- a. At least once per 31 days on a STAGGERED TEST BASIS by:
- 1. Verifying that each steam turbine driven pump develops a differential pressure of > 1070 psid on recirculation flow when the secondary steam supply pressure is greater than 800 psia, as measured on PI SP 12B for pump 1-1 and PI SP 12A for pump 1-2.
- 2. Verifying that each valve (power operated or automatic) in the flow path is in its correct position.
. 3. Verifying that all manual valves in the auxiliary feedwater pump suction and discharge lines that affect the system's capacity to deliver water to the steam generator are locked in their proper position.
- b. At least once per 18 months by:
- 1. Verifying that each automatic valve in the flow path actuates to its correct position on an auxiliary feedwater actuation test signal prior to entering MODE 3.
- 2. Verifying that each pump starts automatically upon receipt of an auxiliary feedwater actuation test signal prior to entering MODE 2.
- 3. Verifying that there is a flow path between each auxiliary feedwater pump and each steam generator by pumping water from the Condensate Storage Tank to the steam generator.
- Provision of section 3.0.4 is not applicable for entry into MODE 3.
DAVIS-BESSE, UNIT 1 3/4 7-4 Amendment No. 96 8705120395 B70504 PDR ADOCK 05000346 p PDR
.- THIS PAllE PROVIDED PLANT SYSTEMS FORINFORETION DE SURVEILLANCE REQUIREMENTS (Continued)
- f. Following each extended cold shutdown (> 30 days in MODE 5), by:
- 1. Verifying that there is a flow path between each auxiliary feedwater pump and each steam generator by pumping Conden-sate Storage Tank water to the steam generator. The flow path to the steam generator shall be verified by either steam generator level change or Auxiliary Feedwater Safety Grade Flow Indication.
Verification of the Auxiliary Feedwater System's flow capacity is not_ required.
DAVIS-BESSE, UNIT 1 3/4 7-Sa Amendment No. 96 L . - - - . . _