MONTHYEARML20214K7721987-05-20020 May 1987 Proposed Changes to Tech Specs Re Fire Protection to Assist in Transfer of Fire Protection Program to Updated Sar,Per Generic Ltr 86-10.Safety Evaluation & Significant Hazards Consideration Encl Project stage: Request ML20214K7241987-05-20020 May 1987 Forwards Application for Amend to License NPF-3,revising Tech Specs Re Fire Protection to Assist in Transfer of Fire Protection Program to Updated Sar,Per Generic Ltr 86-10.Fee Paid Project stage: Request ML20214K7551987-05-20020 May 1987 Application for Amend to License NPF-3,revising Tech Specs Re Fire Protection to Implement Guidance of Generic Ltr 86-10 & to Transfer Fire Protection Program to Updated SAR Project stage: Request ML20236N1671987-11-0707 November 1987 Discusses 871029 & 30 Fire Protection Meetings in Bethesda, MD Re Issues Which Have Arisen in Conjunction W/Licensee App R Reappraisal Effort,Including Status of Fire Protection on Plant Mods.List of Attendees Encl Project stage: Meeting ML20236X8331987-12-0707 December 1987 Application for Amend to License NPF-3,revising Tech Specs Re Fire Protection Project stage: Request ML20236X8591987-12-0707 December 1987 Proposed Tech Specs Re Fire Protection Project stage: Other ML20236X8221987-12-0707 December 1987 Forwards Application for Amend to License NPF-3,revising Tech Specs Re Fire Protection Per Generic Ltr 86-10 Project stage: Request ML20237A6881987-12-0808 December 1987 Informs of Changes Necessary to Support Fifth Refueling Outage in Feb 1988.Key Amend Requests Placed Into 1 of 3 Listed Categories.Nrc Should Allocate Necessary Resources to Provide Timely Support for Review & Issuance of Amends Project stage: Other ML20237B4261987-12-11011 December 1987 Notice of Consideration of Issuance of Amend to License NPF-3 & Opportunity for Prior Hearing Re Util 871207 Application to Revise Tech Specs Concerning Certain Facility Fire Protection Features Project stage: Other ML20149J9641988-02-10010 February 1988 Environ Assessment & Finding of No Significant Impact Based on Util 871207 Application for Amend to License NPF-3, Updating Tech Specs to Reflect Current Plant Design,Testing & Compensatory Measures Re Fire Protection Features Project stage: Other ML20149J9031988-02-10010 February 1988 Forwards Environ Assessment & Finding of No Significant Impact Re Util 871207 Application for Amend to License NPF-3 to Update Tech Specs to Reflect Current Plant Design, Testing & Compensatory Measures Re Fire Protection Features Project stage: Other ML20154N9081988-09-23023 September 1988 Summary of 880721 Meeting/Util in Rockville,Md Re Licensee App R Reappraisal Efforts.List of Meeting Attendees & Viewgraphs Encl Project stage: Meeting 1987-12-08
[Table View] |
Text
I DU Docket No. 50-346 g
License No. NPF-3 DONALD C. SHELTON Serial No. 1385
[EsMs*9 May 20, 1987 United States Nuclear Regulatory Commission Document Control Desk Washington, D. C.
20555 Gentlemen:
Under separate cover, we are transmitting an application for an Amendment to Facility Operating License No. NPF-3 for the Davis-Besse Nuclear Power Station, Unit No. 1.
This application (assigned TAC No. 65361) requests that the Davis-Besse Nuclear Power Station, Unit No. 1 Operating License, Appendix A, Technical Specifications be revised to reflect the changes attached. The proposed changes involve revisions and additions to the Technical Specifications related to Fire Protection.
Toledo Edison intends to implement the guidance of NRC Generic Letter 86-10 which requests that the Fire Protection Program and major commit-ments made in Operating Licenses and Technical Specifications be deleted and referred to in the Updated Safety Analysis Report (USAR). However, these proposed revisions to the Technical Specifications are developed in order to reflect the current plant design, testing and compensatory measures considered to be adequate and practical.
Implementation of these changes will then allow a transfer to the USAR without further change.
Toledo Edison requests that this amendment be approved and issued by December 31, 1987. This change is to be effective 30 days after issuance of the License Amendment.
Enclosed is a check for $150 as required by 10CFR170.12(c) for a license amendment application.
Very trul y urs, f
AA./
DCS:MHL.plf 8705290041 870520 PDR ADOCK 05000346
{
Attachments P
PDR cc: DB-1 NRC Resident Inspector g }
A. B. Davis, Regional Administrator (2 copies) i State of Ohio A. W. DeAgazio, NRC/NRR Davis-Besse Project Manager kC, hd/* cit. 7/S.CO THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652