ML20216J378

From kanterella
Revision as of 19:16, 5 March 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Repts for Aug 1997 for DNPS
ML20216J378
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 08/31/1997
From: Abrell G
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20216J359 List:
References
NUDOCS 9709170266
Download: ML20216J378 (10)


Text

.

e 4

I 4

MONTHLY NRC

SUMMARY

OF OPERATING EXPERIENCE, i

PER REGULATORY GUIDE 1.16 FOR DRESDEN NUCLEAR POWER STATION COMMONWEALTH EDISON COMPANY FOR AUGUST 1997 UNIT DOCKET LICENSE 1 050-010 DPR-2 2 050-237 DPR-19 3 050-249 DPR-25 1

Lt \llf O\l361\M150\97\ 94W9M a 9709170266 970910 PDR ADOCK 05000010 ,

R PDR

4 TABLE OF CONTENTS AUGUST 1997 NRC REPORT 1.0 Introduction 2.0 Summary of Operating Experience 2.1 Unit 2 Monthly Operating Experience Summary.

2.2 Unit 3 Monthly Operating Experience Summary.

3.0 Operating Data Statistics 3.1 Operating Data Report - Dresden Unit 2 3.2 Operating Data Report - Dresden Unit 3 3.3 Unit 2 Shutdowns 3.4 Unit 3 Shutdowns 4.0 Unique Reporting Requirements 4.1 Main Steam Relief and/or Safety Valve Operations -

Unit 2 and Unit 3 t

2 Li \9 )tsc\8 301 \MI SC\ bii % 7 0 WS DI , uA t

4 i -

i j .

1.0 Introduction Dresden Nuclear Power Station is a three reactor generating facility owned and operated by the Comed ,

Company of Chicago, Illinois. Dresden Station is  ;

located at the confluence of the Kankakee and Des

, Plaines Rivers, in Grundy County, near Morris, i

Illinois.

Dresden Unit 1 is a General Electric Boiling Water

Reactor with a design net electrical output rating of 200 megawatts electrical (MWe). The unit is being decommissioned with all nuclear fuel removed from the j reactor vessel. Therefore, no Unit 1 operating data is 4

provided in this report.

Dresden Units 2 and 3 are General Electric Boiling Water Reactors, each licensed at 2527 megawatts thern..l. The gross outputs of Units 2 and 3 are 832 and 834 megawatts electrical, respectively, with design net electrical output ratings of 794 MWe each. The commercial service date for Unit 2 is 11 August 1970, and 30 October 1971 for Unit 3.

-Waste heat is rejected to a man-made cooling lake using the Kankakee River for make-up and the Illinois River for blowdown.

The Architect-Engineer for-Dresden Units 2 and was Sargent and Lundy of Chicago, Illinois.

This report for AUGUST 1997, was compiled by Gary A.

Abrell of Dresden Regulatory Assurance Staff, telephone number (815) 942-2920, extension 3749, 3

1.1 \ 9 h D \ t .101 \MI Sci vi d M M 01. 0A

9 8

, 1 t

l i

2.0

SUMMARY

OF OPERATING EXPERIENCE FOR AUGUST 1997 i 1

2.1 UNIT 2 MONTHLY OPERATING EXPERIENCE

SUMMARY

i Unit 2 began the period with the reactor critical in preparation for synchronizing to the grid. At 0414 on August 1, 1997 the unit was placed on system. The unit began power ascension and reached full load at approximately 2100 on August 4, 196', /W unit remained at full power except for- mit " 0 # drops for surveillance or maintenance .;tivity.

4 Lt \9)t 0\9 301\MI50 \ 9 7 9'Mif". 3 .A

4 .

4 i .

4 i .

2.0 SU14%RY OF OPERATING EXPERIENCE FOR AUGUST 1997 2.2 UNIT 3 MONTHLY OPERATING EXPERIENCE

SUMMARY

i

! Unit 3 operated near full power throughout the

t period with minor load changes for surveillance ,

i and maintenance activity.

)

i I

i b

I 1

s a

1 I

f 5

uunmmeo+ e : a 1

g e---+- va -e-2 -yr- e - -,-wrmmv---- -gr,-. w m--w-e-, *-- -v-y------. -- = - , - - -- 4-w,--- --o- - - ,

e--r - - = -ri- - -* - - -

e 3.0 OPERATING DATA STATISTICS 3.1 OPERATING DATA REPORT - DRESDEN UNIT TWO DOCKET No. 050-237 DATE SEPTEMBER 4, 1997 COMPLETED BY G. A. ABRELL TELEPHONE (815) 942-2920 OPERATING STATUS

1. REPORTING PERIOD: AUGUST 1997
2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) : 2,527 MAXIMUM DEPENDABLE CAPACITY (MWe NET) : 772 DESIGN ELECTRICAL RATING (MWe Net): 794
3. POWER LEVEL TO WHICH RESTRICTED (MWe Net): No restrictions
4. REASONS FOR RESTRICTIONS (IF ANY): See Section 2.1 of this report.

REPORTING PERIOD DATA PARAMET ER i THis MONTH YEAR TO DATEi CUMULATIVE HOURS IN FERIOD 744 b,831 237,167 TINE REACTOR CRITICAL 744 4,996 172,158 TIME REACTOR RE8ERVE SHUTDOWN (Hours) 0 0 0 TIME GENERATOR OH LINE (Houts) 740 4,907 163,922 TIME GENERATOR RESERVE SHUTDOWN (Hours) 0 0 1 THElHAL ENERGY GENERATED (IMit Gross) 1,788,bl9 11,411,bbt 343,Ilb,4b7 ELECTRICAL ENERDY OENERATED (HWEHe cross) b76,131 3,674,495 109,b72,431 ELECTRICAL ENERGY GENERATED (HWEHe Net) 550,teh 3,b11,341 103,613,070 REACTOR SERVICE FACTOR (t) 99.$5 8b.7% 72.61 REACTOR AVAILABILITY FACTOR (t) 100.0t 8b.71 72.6%

GENERATOR SERVICE FACTOR (4) 99.St 84.21 69.11 GENTRATOR AVAIIABLILITY FACTOR (t) 99.$t 84.2% 69.I1 CAPACITY FACTOR (Using ICD Net) (t) 95.91 78.01 56.66 CAPACITY FACTOR (Using DER Net) (1) 93.2t 7b.61 bb,04 FVRCED OVTAGE FACTOR (4) 11 1b.9 12.9t

20. Shutdowns scheduled over the next 6 months: none
21. If shutdown at end of report period, estimated date startup: N/A 6

L a \B 3e.0\8 Kl' HISJ W 7 4 ' f. W 8 s1

. .t1 t

3.0 OPERATING DATA STATISTICS 3.2 OPERATING DATA REPORT - DRESDEN UNIT TilREE DOCKET No. 050-249 DATE SEPTEMBER 4, 1997 COMPLETED BY G. A. ABRELL TELEPllONE (815) 942-2920 i OPERATING STATUS i

1. REPORTING PERIOD
AUGUST 1997
2. CURRENTLY AUTliOP.IZED POWER LEVEL (MWth): 2,527 MAXIMUM DEPENDABLE CAPACITY (MWe Net) : 773 DESIGN ELECTRICAL RATING (MWe Net): 794
3. POWER LEVEL TO WilIC11 RESTRICTED: No restriction i 4. REASONS FOR RESTRICTIONS (IF ANY): See Section 2.2 of i

this report.

REPORTING PERIOD DATA PARAMETER THIS MONTH YEAR TO DATE CUMULATIVE 5 Houka 1H PEAloD 144 5,e)) 270,487 6 f1* msACron cnificAL 744 3232 159, opp 7 T1w. maActoa nr.stavt SHUTDOWN (Hours) 0.0 0 C 8 T1 2 gen RAtok oN*LINE (Hours) 744 J,07! lb),bkV 9 T12 GENthAfoR RESERVE SHUTUoWN (Hours) 0.0 ( l 10 TNasmAL ENEAay otNtnATED (MwHL oross) 1,eot, Set 6,17 9,9 9ti 116,39/,471 11 81ACTRICAL BWEMT GENERATED petune erossi b94,but 1,993,431 101,2 t,6 $ 7 a 12 ELECTRICAL ens.hGY OENthATED (MWEHe Net) b69,029 1,eH9,46t 9 5, 9 71, 9_b t 13 REACTOR 8tRVICE FACTOR (6) 100.04 55.46 70. 5 14 htActok AVA11ABIL17Y FACToA (t) 100.06 LS.46 70.24 15 atsamAtok stavact FActok (t) 200.06 S2.79 06.94 16 GENEAAfok AVAILABLIL17Y FACTok (t) 100.04 62.76 (t.99 17 CAPAC17Y I ACToA (Using PCD Net) (t) 99.14 42.09 S4.96 18 CAPAC17Y rACTOR (Using DER Net) (t) 96.J6 40.89 b3.46 19 ronctD outAat rActoa (t) 0.09) 19.96 14.6.

20. Shutdowns scheduled over the next 6 months: None
21. If shutdown at end of report period, estimated date of startup: N/A 7

Li\9360\t301\M180\t1\t1011001.GA

3.3 UNIT 2 SHUTDOWHS REPORT MONTH OF AUGUST 1997 NO DATE TYl'E DURATION REASON METilOD CORRECTIVE ___

(1) (llOURS ) * (2) Op ACTIONS /

SHUTTING CO!HENTS DOWN RFACTOR (3) 6 970728 r 4 G 2 LER 97-010 Year-to-date forced outage hours = 925 {

Cumulative forced outage hours = 24,331 TABLE KEY:

(1) (3)

F: Forced Method:

S: Scheduled 1. Manual

2. Manual Scram (2) 3. Automatic Scram Reason: 4. Other (Explain)

A Equipment Failure (Explain) 5. Load Reduction B Maintenance or Test C Refueling D Regulatory Restriction E Operator Training & ,

Licensing Exam F Administrative G Operational Error H Other (Explain) 8 l 1.s\8)f0\9301\ MISC \$1\97011001.GA l

_ _ _ _ _ _ . _ _ _ . . _ . . ~ . _ _ -_ _ _ . _ _ _ . . _ . . _ _ . _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _

I 3.4 UNIT 3 SilOTDOWNS REPORT MONTH AUGUST 1937 no tan mrm nn-u ion

. o w.: o ro ,oe . 4 mm n 4. i i Wit'ht ) ' S H Ti l k , A T1v e I* &N C stilhT!

F F A. i 4 l

Year-to-date forced outage hours = 763 Cumulative forced outage hours = 25,839 TABLE KEY:

(1) (3)

F: Forced Method:

S: Scheduled 1. Manual

2. Manual Scram (2) 3. Automatic Scram Reason: 4. Other (Explain)

A Equinment Failure S. Load Reduction (Explain)

B Maintenance or Test C Refueling D Regulatory Restriction E Operator Training &

Licensing Exam F Administrative G Operational Error H Other (Explain) 1 9

umme inww:mm:* a . .1

1 I

1 4.0 UNIQUE REPORTINC REQUIREMENTS 4.1 MAIN STEAM RELIEF AND/OR SAFETY VALVE OPERATIONS - UNIT 2 AND UNIT 3 None 10 t as.w me m mis o m e c o a . a