ML21014A350

From kanterella
Revision as of 00:46, 23 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Attachment 2 - Report and Analysis Summary
ML21014A350
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 01/05/2021
From:
Southern California Edison Co
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML21014A347 List:
References
Download: ML21014A350 (2)


Text

Attachment 2 Report and Analysis Summary

Reference. EPP-2 SAN ONOFRE NUCLEAR GENERATING STATION REPORT AND ANALYSIS

SUMMARY

10 CFR 50.54(q)(5) / 10 CFR 72.44(f)

Document Number: EPP-1, Revision 1

Title:

Emergency Response Action Request #: 0820-76520 Change Description Analysis Summary The 10CFR50.54(q) evaluation for EPP-1 Revision 1 is covered The changes do not contradict the licensing basis or the emergency plan content. The under AR 0820-76520 assignment 3. This revision includes: changes do not modify the licensing basis with regards to a- reduction in effectiveness.

  • Directions to develop an ERO relief shift roster. Formal briefings are administrative in nature. Briefings are provided to ensure the
  • Clarification of the timing of Follow-Up Notifications. Emergency Response Organization (ERO) is aware of the latest status of the
  • Clarification of steps that are required when radiological emergency. Given the small size of the ERO, they are in contact continuously and surveys are performed. aware of the current situation via normal communications and updates.
  • Instructions to set up an electronic dosimeter.
  • Revision to the frequency of formal briefings. Adding directions to develop an ERO relief shift roster ensures the response organization Is staffed on a continuing basis.
  • Editorial changes.

Clarifying the timing of Follow-Up Notifications ensures notifications are completed as required per the Emergency Plan, and when significant changes In event status occur.

Clarifying steps that are required when radiological surveys are performed and adding instructions to set up an electronic dosimeter ensure emergency workers have resources for controlling radiological exposures, and personnel understand how to utilize dosimeters during emergency conditions.

The Emergency Plan maintains a response organization with staff to respond and augment the initial response on a continuing basis. The Emergency Plan continues to have procedures for notification of State and local governmental agencies that can alert them of the declared emergency within 60 minutes after declaration of an emergency and providing follow-up notifications. The Emergency Plan maintains means for controlling emergency workers radiological exposures during an emergency.

The Emergency Plan continues to meet the regulatory requirements of 10CFR50.47(b) and 10CFR50 Appendix E, as exempted. The capability and timeliness to perform the planning functions and elements related to the planning functions are maintained.

The chanQes can be implemented without prior NRC approval.

PREPARED BY: Lucia Sischo REVIEWED BY: Kelli Sholler DATE: 12-15-2020 DATE: 12-16-2020 EP SOA Rev O 08/20 Page 1 of 1