ML17303A077

From kanterella
Jump to navigation Jump to search
Revised Emergency Plan Implementing Procedure and the Independent Spent Fuel Storage Installation
ML17303A077
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 10/26/2017
From: Bates A
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML17303A067 List:
References
Download: ML17303A077 (2)


Text

SOUTHERN CALIFORNIA Al Bates EDISON*~ Manager, Regulatory Affairs An EDISON INTERNATIONAL Company October 26, 2017 10 CFR 50.54(q)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

Subject:

Docket Nos. 50-206, 50-361, 50-362, and 72-41 Revised Emergency Plan Implementing Procedure (EPIP)

San Onofre Nuclear Generating Station (SONGS) Units 1, 2, and 3 and the Independent Spent Fuel Storage Installation

Dear Sir or Madam:

Pursuant to 10 CFR 50.54(q)(5), Attachment 1 of this letter provides a copy of the following revised Emergency Plan document:

Procedure Rev. Effective Date S0123-Vlll-ADMIN-1, Emergency 4 September 26, 2017 Preparedness Program Maintenance As specified in 10 CFR 50.54(q)(5), Attachment 2 provides a report and analysis summary for these EPIP changes. These changes do not reduce the effectiveness of the Emergency Plan or the EPIPs.

There are no commitments contained in this letter or its attachments.

flY4f: .

rJ f45S Zf,,,

~M~s P. 0. Box 128 San Clemente, CA 92672 tJ{l/(

Document Control Desk If you have any questions, please contact me at (949) 368-6945.

Sincerely, Ott Attachments: 1. Revised Emergency Plan Implementing Procedure

2. Report and Analysis Summary cc: Emergency Response Coordinator, NRC Region IV (2 copies of Attachment 1)

K. M. Kennedy, Regional Administrator, NRC Region IV M. G. Vaaler, NRC Project Manager, SONGS Units 1, 2 and 3 W. C. Allen, NRC Project Manager, SONGS ISFSI P. 0. Box 128 San Clemente, CA 92672