The Independent Spent Fuel Storage Installation - Revised Emergency Plan Implementing Procedures
ML18345A051
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 12/05/2018
From: Bates A
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML18345A066 List:
References
Download: ML18345A051 (2)


Text

SOUTHERN CALIFORNIA EDISON~

An EDISON INTERNATIONAL Company U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 December 5, 2018

Subject:

Docket Nos. 50-206, 50-361, 50-362, and 72-41 Al Bates Manager, Regulatory Affairs 10 CFR 50.54(q)

Revised Emergency Plan Implementing Procedures (EPIPs)

San Onofre Nuclear Generating Station (SONGS) Units 1, 2, and 3 and the Independent Spent Fuel Storage Installation

Dear Sir or Madam:

Pursuant to 1 O CFR 50.54(q)(5), Attachment 1 of this letter provides a copy of the following.

revised Emergency Plan documents:

Procedure Rev.

Effective Date S0123-VIII-ER0-6, Dose Assessments 3

November 6, 2018 S0123-VIII-ADMIN-1, Emergency 7

November 13, 2018 Preparedness Program Maintenance As specified in 10 CFR 50.54(q)(5), Attachment 2 provides a report and analysis summary for the EPIP changes. These changes do not reduce the effectiveness of the Emergency Plan or the EPIPs.

There are no commitments contained in this letter or its attachments.

P. 0. Box 128 San Clemente, CA 92672

)/ '-lS

,/N5S L/p

//I-ft..

/IJH~ s

\\

Document Control Desk If you have any questions, please contact me at (949) 368-6945.

Sincerely, Attachments: 1. Revised Emergency Plan Implementing Procedures

2. Report and Analysis Summaries cc:

Emergency Response Coordinator, NRC Region IV (2 copies of Attachment 1)

K. M. Kennedy, Regional Administrator, NRC Region IV M. G. Vaaler, NRC Project Manager, SONGS Units 1, 2 and 3 W. C. Allen, NRC Project Manager, SONGS ISFSI