ML21014A348

From kanterella
Jump to navigation Jump to search
The Independent Spent Fuel Storage Installation, Revised Emergency Implementing Procedures
ML21014A348
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 01/05/2021
From: Bates A
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML21014A347 List:
References
Download: ML21014A348 (2)


Text

Al Bates An EDISON llfl'ERNATTONALt> Company Manager, Regulatmy Affairs &

Oversight U.S. Nuclear Regulatory Commission A TIN: Document Control Desk Washington, D.C. 20555-0001 January 5, 2021

Subject:

Docket Nos. 50-206, 50-361, 50-362, and 72-41 Revised Emergency Plan Implementing Procedures (EPIPs)

San Onofre Nuclear Generating Station (SONGS) Units 1, 2, and 3 and the Independent Spent Fuel Storage Installation

Dear Sir or Madam:

10 CFR 50.54{q)

Pursuant to 1 0 CFR 50.54{q)(5), Attachment 1 of this letter provides a copy of the following revised Emergency Plan Implementing Procedure:

Procedure Rev.

Effective Date EPP-1, Emergency Response 1

December 7, 2020 As specified in 10 CFR 50.54(q)(5), Attachment 2 provides a report and analysis summary for the EPIP changes. These changes do not reduce the effectiveness of the Emergency Plan or the EPIPs.

There are no commitments contained in this letter or its attachments.

Document Control Desk If you have any questions, please contact me at (949) 368-7024.

Attachments: 1. Revised Emergency Plan Implementing Procedure

2. Report and Analysis Summary cc:

Emergency Response Coordinator, NRC Region IV (2 copies of Attachment 1)

S. A. Morris, Regional Administrator, NRC Region IV A. M. Snyder, NRC Project Manager, SONGS Units 1, 2 and 3