Special Rept:On 890723,main Steam Line Area Radiation Monitor 2 Declared Inoperable Due to High Source Check Reading.Caused by Equipment Deterioration Resulting from Environ Conditions.Troubleshooting of Channel Initiated
ML20245J894
Person / Time
Site: Yankee Rowe
Issue date: 08/11/1989
From: Henderson T
YANKEE ATOMIC ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BYR-89-125, NUDOCS 8908180223
Download: ML20245J894 (3)


Text

- - - _ ,

m,, .

0' L

YANKEEJATOMICIELECTRIC COMPANY r.i.v on.

u cars, a2s.s2e, .

^ Star Route, Rowe, Massachusetts 01367 Y4mxse

~ .

August 11, 1989 BYR 89-125 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Special Report:

No. 2 Main Steam Line Monitor Inoperable for Greater Than 7 Days (Proposed T.S. 3.3.3.1, Table 3.3-4 Item 2(c))

Dear Sir:

In accordance with our Proposed Change No. 228 to Technical Specification 3.3.3.1, Table 3.3-4, Item 2(c) and Technical Specification 6.9.6.k, the attached Special Report outlining the actions taken, the cause of the inoperability and the plans and schedule for restoring the instruments to operable status is hereby submitted.

Very truly yours, Of W p d e ==

Timothy K. Henderson Acting Plant Superintendent ELM / elm Enclosure cc: [3] NSARC Chairman (YAEC)

[1] Institute of Nuclear Power Operations (INPO)

[1] USNRC, Region I

[1] Resident Inspector hUEfGK3 890811 S. 05000029 y% ff PNU 3 I l

i

- e,w-L. #'

YANKEE ATOMIC ELECTRIC COMPANY Page 1 BYR.89-125 .

B&CKGgoMND Proposed Change 228 to the Technical Specifications has been formulated and submitted for review and approval by the NRC

~

on 7/7/89.- The change will add the Main Steam Line Area Radiation Monitors (MSLARMs) and Primary Vent Stack noble gas monitor to Technical Specification 3.3.3.1 and will address the actions to be taken if the monitors are not operable.

These~ actions include initiating a preplanned alternate monitoring method'and restoring the channel (s) to operable  !

status within seven days or generating a Special Report i within fourteen days outlining the actions taken, cause of the inoperability and the plans and schedule to restore the system to operable' status.

During the time period required for the NRC to review and j approve-the proposed Technical Specification change the plant j will adhere to the proposed requirements.

On 7/23/89, No. 2 Main Steam Line Area Radiation Monitor l (MSLARM) was declared inoperable because of a high source  ;

check reading. This condition was found during the performance of a routine surveillance conducted by Radiation Protection Department personnel in accordance with procedure q OP-4816, " Functional' Test and Alarm Settings of the Area '!

Radiation Monitoring System. Maintenance Request (MR) No. l 1445 was initiated. l 1

ACTION TAKEN .

1 Troubleshooting of the channel was initiated by Instruments and Controls Department personnel. Following the i replacement of detector's cable and an instrumentation.

realignment the No. 2 MSLARM was declared operational on j 7/31/89. )

i During the time the channel was inoperable necessary manual

' measurements to compensate for the loss of remote-instrumentation were available as outlined in plant procedure OP-8741, " Determination of Noble Gas Release Rates from the ,

Main Steam Lines with the Victoreen Channels Inoperable".  !

_CAUSE OF Tile INOPE_RABJJdTJ The root cause of the inoperability was attributed to i equipment deterioration resulting from environmental conditions. The monitor is mounted in an area that is subject to temperature and humidity fluctuations. The MSLARMs' installation, environmental conditions and performance remains under evaluation as part of the normal surveillance and maintenance program.

__y

YANKEE ATOMIC ELECTRIC COMPANY Page 2

, BYR_89-125,,

S C H E D U L E __F O R R E S T_O_R A T I O N No. 2 MSLARM was returned to service during the report preparation period.