ML20212K806

From kanterella
Revision as of 21:13, 20 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notice of Violation from Insp on 860721-25
ML20212K806
Person / Time
Site: Framatome ANP Richland
Issue date: 08/14/1986
From: Thomas R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML20212K804 List:
References
70-1257-86-05, 70-1257-86-5, NUDOCS 8608250067
Download: ML20212K806 (1)


Text

. ._. ._. . .

(  :

~

APPENDIX A'

.w 4 NOTICE OF' VIOLATION. .

^

^

Exxon Nuclear Company, Inc. . Docket No. 70-1257 2101 Horn Rapids Road. License No. SNM-1227 Richland,LW'ashington' 99352 As a result of. t'he -inspection conducted July _21-25,.1986, and in ac'cordance

- with NRC Enforcement Policy 10 CFR'Part 2 Appendix C,. the following violation was identified:

License Condition 9' states, the-licensee shall conduct their program in

- accordance with_ statements, representations'and conditions-contained in the

. license. application dated.May 31, 1979, as supplemented by letters to the

. Commission. Section 2.3.'4.a)',of the' license application requires preparation and use of-detailed work and operating procedures and training of employees. -

A. Procedure No. XN-NF-P91, 001 Revision 1, " General Facility Radiation Work Procedure", page 1 requires that workers inform HPT personnel whenever-

-visible ~or smearable contamination in excesslof 10,000 dpm/100 cm 2 is known o'r, suspected to exist outside of'a ventilated enclosure within a contamination control area.

(

Contiary tothis requirement, at the time of .the inspection, an -

T

' electrician;while^ performing equipment maintenance at the North end of the.Line 2;calciner inside the contamination control area'of-the UOz.

Building,1 spilled uncontained visible UO2 Powder which was not reported by the worker to HPT; '

This is.la Severity Level IV-Violation;(Supplement VI).

~

Purs'u ant'to the provisions'of.10 CFR 2.201, Exxon Nuclear Company is hereby

- required.to submit.to this office within thirty days of the date of this -

' Notice, a' written statement or explanation in reply, including: (1) the

~

corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further items of noncompliance; and (3) th'e date when full compliance will be achieved. Consideration may be given to.cxtending your response time for good cause shown.

AUG 141986 gp Dated A R. Thomas, Chiqf v Nuclear Materials Safety Section 9608250067 860814 PDR ADOCK 07001257

? C PDR t

- , - - . ~ . . . . , . . - - , ~ , ,. . . _ . . . , , ,, , . .