Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20207B373 | 21 May 1999 | Notice of Violation from Insp on 990322-26,0514 & 21. Violations Noted:On 980225,licensee Delivered Licensed Matl to Carrier for Transport Under General License Pursuant to 10CFR71.12 & Did Not Comply with Terms & Conditions | |
ML20198B419 | 14 December 1998 | Notice of Violation from Insp on 981109-13.Violation Noted: Failure to Control Decommissioning Operations So That Operators Would Verify That Disassembled Equipment Was Free from Visible U Deposits Before Staging with Other Equipment | |
ML20236R274 | 17 July 1998 | Notice of Violation from Insp on 980615-19.Violation Noted: Operational Safety Activities Not Implemented Iaw/Documented Standard Operating Procedures Appropriate to Circumstances in Listed Examples | Fuel cladding |
ML20198S496 | 16 January 1998 | Notice of Violation from Insp on 971215-19 & 971222-24. Violation Noted:On 971218,licensee Discovered That U Compounds Other than Oxide Pellets Were Being Stored in Temporary Storage Locations | |
ML20199B934 | 7 November 1997 | Notice of Violation from Insp on 971006-10.Violation Noted: April 1977 Loss of Moisture Control Incident at Dry Conversion Pilot Plant Was Not Adequately Reviewed & Appropriate Corrective Actions Were Not Taken | |
ML20216J085 | 12 September 1997 | Notice of Violation from Insp on 970731.Violation Noted: on 970413,RL Rumley,Lead Operator,Defeated Breathing Zone Air Sampler by Placing Rubber Glove Over Air Sampler at Respective Work Station | |
ML20141K578 | 23 May 1997 | Notice of Violation from Insp on 970414-18,23,24 & 0501. Violation Noted:On 960603,licensee Shipped 405 NT-IX Shipping Packages Containing Fissile Matl W/O Installing Cushioning Matl | |
ML20134C724 | 30 January 1997 | Notice of Violation from Insp on 970106-10.Violation Noted: Field Change Made Under Open ECN (No.5533L) & Not Documented or Included W/Ecn Package Prior to Startup Approval on 960806 | |
ML20133D023 | 3 January 1997 | Notice of Violation from Insp on 961202-05.Violation Noted: Licensee Failed to Update Posted Criticality Safety Limit Card for UF6 Cylinder Wash Operation to Reflect Change in CCS Limit | |
ML20134K792 | 12 November 1996 | Notice of Violation from Insp on 961021-25.Violation Noted: as of 961022,licensee Had Not Calibrated Three Sets of direct-reading Dosimeters Maintained for Er Since 950918,for Two Sets & Since 950725,for the Third Set | |
ML20149H458 | 10 November 1994 | Notice of Violation from Insp on 940926-30 & 1012-14. Violations Noted:Licensee Did Not Provide Training to Operators Relative to Modification or Evaluate Need to Revise Operating Procedures Prior to Restarting Sys | |
ML20056C841 | 2 July 1993 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $12,500.Noncompliance Noted:Ecn Not Used for Mod of Discharge Tube of Feed Hoppers on All Four Blenders by Installing Interlocks for Direct Control of Discharges | |
ML20126B331 | 4 December 1992 | Notice of Violation from Insp on 921015-17 & 29.Violation Noted:Licensee Personnel Did Not Immediately Rept to Safety, Security & Licensing Abnormal Conditions Where U Accumulated in Unsafe Geometry Vessel | |
ML20195F981 | 18 November 1988 | Notice of Violation from Insp on 880906-09 & 23.Violations Noted:Inadequate Survey Performed as Evidenced by Set of Coveralls Having Measurable Contamination Being Discovered on Coat Rack | |
ML20212K806 | 14 August 1986 | Notice of Violation from Insp on 860721-25 | |
ML20154K220 | 5 March 1986 | Notice of Violation from Insp on 860203-07 & 20 | |
ML20135A323 | 30 August 1985 | Notice of Violation from Insp on 850729 | |
ML20126L392 | 17 April 1981 | Notice of Violation from Insp on 810312-13 |