Recommends Restart of Plant Pending Util Completion & NRC Insp & Closeout of Issues Identified in Encl Restart Readiness Assessment Rept. Restart Readiness Assessment for Pilgrim Nuclear Power Station, Encl
ML20207K238
Person / Time
Site: Pilgrim
Issue date: 09/26/1988
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20204H358 List:
References
NUDOCS 8810030394
Download: ML20207K238 (3)


Text

-_ _ ._ ._- _ _ __

Y SEP 261988 MEMORANDUM FOR: William T. Russell Regional Administrator FROM: Samuel J. Collins, Chairman Pilgrim Restart Assessment Panel l

$UILIECT: PILGRIM RESTART RECOMMENDATION j

The memorandum from W. F. Kane to you dated July 8,1987, estabitshed the Charter for tha Pilgrim Restart Assessment Panel. In accordance with that ,

Charter, this forwards the Panel's Report documenting its conclusions and their bases concerning the Boston Edtsen Company's (BEco) readiness to restart the i Pilgria Nuclear Power Station (PNPS) from a management effectiveness and '

technical perspective.  !

Based on the entensive and comprehensive review documented in the enclosed Restart Readiness Assessment Report, it is the consensus view of the Panel that  !

the management and technical problems existing at the time of shutdown in j April 1986 have been resolved. Further, the Panel concludes that BECo's management controls, programs, and personnel are generally ready and performing l; at a level to support safe startup and operation of the Ptigria Nuclear Power Station. {

\

The Pilgrim Restart Assessment Panel therefore recommends authertzing restart of the Ptigrim Nuclear Power Station pending BECo's completion and NRC i

{

inspection and closeout of those issues identified as restart items in the enclosed report.

ORIGINAL SIGNi.0 BY I l

Samuel J. Collins, Chairman i Ptigrim Restart Assessment Panel l l

Enclosure:

i As stated '

0FFICIAL RECORD COPY PILGRIM RAR - 0001.0.0 ff r ~

09/25/88 88100 403v4 WUYd6 + /

PDR 4D3CK 050Cg3 g pp. J /

l

\

. i Hemorandum for William T. Russell 2 SEP z61988 l

cc w/ encl:

R. Bird, Senior Vice President - Nuclear, BEco Chairman, Board of Selectmen, Plynouth Chairman, Board of Selectmen, Carver 1 Chairman, Board of Selectmen, Duxbury l Chairman, Board of Selectmen, Marshfield Chairman, Board of Selectmen, Kie.gston The Honorable Edward P. Kirby The Honorable Peter V. Forman The Honorable Edward J. Markey Plymouth Civil Defense Ofrector P. Agnes, Assistant Secretary of Public Safety, Commonwealth of Massachusetts H. Ernst. Cemittee on Energy, Commonwealth of Massachusetts S. Pollard, Energy Secretary, Commonwealth of Massachusetts  ;

B. McIntyre, Chairman, Department of Public Utilities  !

N. Johnson, Chairman, Duxbury Nuclear Comittee R. Boulay H. Conyngham H. Jeka K. Andarson Pubite Document Room (POR)

Local Public Document Room (LPOR)

Nuclear Safety Inforoation Center (NSIC)

NRC Resident inspector Comenwealth of Massachusetts (2)

F I

l i

' OFFICIAL RECORD COPY PILGR!H RAR - 0002.0.0 09/25/83 ,

.i 1

. =- -

I V.

. Memorandum for William T. Russell 3 SEP 261988 bec w/ enc 1:

Region ! Docket Room (with concurrences)

T. Hurley, NRR B. Clayton E00  !

W. Kane, R!

T. Martin, R!

5. Ebneter, RI Pilgrim Restart Panel Members
5. Collins, R!

J. Wiggins, RI A. Blough, RI R. Bellamy, RI J. Durr, RI B. Boger, NRR ,

R. Wessman, NRR

0. Mcdonald, NRR L. Doerflein, R!

C. Warren. SRI - Ptigrim M. Miller, RI K. Abraham, R1 (2)

M. J. DIDonato, RI (2) bec w/o enc 1:

E. Wenzinger, R!

J. Linville, RI F. Miragita NRR D. Crutchfield, NRR

5. Varga, NRR C.. Rossi, NRR F. Akstulewicz, NRR J. Roe, NRR F. Congel, NRR YR!:0RP \ I:0RP II:0!:P , P LDoerfletn/mjd Bicugh itns JWiggps 9/ai/88 9/id/88 9/ l# 88 9/$/88 0FFICIAL RECORD COPY P!LGRIM RAR - 0003.0.0 09/25/88