Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20217C7961999-10-0606 October 1999 Marked-up & Type Written Proposed TS Pages,Revising TSs 1.0, 3.6,Bases 3.0,Bases 3.6 & 5.5,to Adopt Implementation Requirements of 10CFR50,App J,Option B for Performance of Type A,B & C Containment Leakage Rate Testing ML20209A7351999-06-23023 June 1999 Proposed Tech Specs Pages 3.3-4 & 3.3-6,replacing Page 3.3-6 Re Recirculation Loop Flow Transmitters & Applicable SRs Associated with Function 2.b ML20196B4741999-06-17017 June 1999 Proposed Tech Specs Bases Changes Made at Plant Subsequent to Receipt of License Amend 178,dtd 980731,for Conversion to Its,Through 990610 ML20195E9101999-06-0808 June 1999 Proposed Tech Specs,Correcting Described Method by Which SGTS Heaters Are to Be Tested ML20205H2891999-03-31031 March 1999 Proposed Tech Specs Modifying ACs for Unit Staff Qualifications for Shift Supervisor,Senior Operator,Licensed Operator,Shift Technical Advisor & Radiation Manager Positions ML20236W1141998-07-28028 July 1998 Proposed Tech Specs Re Implementation of BWR Thermal Hydraulic Stability Solution ML20151Q0621998-07-28028 July 1998 Final Version of Improved TS & Bases Re Proposed Change to Conversion to Improved Standard TS ML20236R9821998-07-16016 July 1998 Proposed Tech Specs Section 6.5.1,re Implementation of BWR Thermal Hydraulic Stability Solution ML20236Q0641998-07-13013 July 1998 Proposed Tech Specs Re Rev B to Conversion to Improved STS ML20216H0801998-04-15015 April 1998 Proposed Tech Specs Sections 2.1.A.1.d & 3.2.C,deleting Max Rated Power for APRM Rod Block Trip Setting ML20216H0571998-04-15015 April 1998 Proposed Tech Specs 4.2.C,exempting Neutron Detectors from Channel Calibr Requirements ML20216B4481998-04-0202 April 1998 Proposed Tech Specs 4.2.C,exempting Neutron Detectors from Channel Calibr Requirements ML20148G3481997-05-30030 May 1997 Proposed Tech Specs,Changing Frequency of Testing RHR Cross Tie valve,RHR-MOV-MO20,position Indication from Once Per Month to Once Per Operating Cycle ML20138J0751997-05-0505 May 1997 Proposed Tech Specs,Relocating Control of Standby Liquid Control Relief Valve Setpoint in TS 4.4.A.2.a & Associated Bases ML20148B0041997-05-0202 May 1997 Proposed Tech Specs,Deleting SLC Relief Valve Testing Described in TS Section 4.4.A.2.a & Associated Bases in Bases Section 3.4.A Since Testing Is Already Performed Under ISI Program ML20134K3771997-02-10010 February 1997 Proposed Tech Specs Re Requirements for Avoidance & Protection from Thermal Hydraulic Instabilities to Be Consistent w/NEDO-31960 & NEDO-31960,Suppl 1, BWR Owners Group Long-Term Stability Solutions.. ML20117K3291996-06-0606 June 1996 Proposed Tech Specs Revising Safety Limit MCPR from 1.06 to 1.07 for Dual Recirculation Loop Operation & from 1.07 to 1.08 for Single Recirculation Loop Operation ML20100R4431996-03-0505 March 1996 Proposed Tech Specs,Consisting of Change Request 142, Revising TS, DG Enhancements ML20086K4421995-07-14014 July 1995 Revised Proposed Tech Specs Re DG Enhancements Reflecting More Conservative Approach to Enhancing DGs ML20086B7061995-06-28028 June 1995 Proposed Tech Specs Re Increasing Required RPV Boron Concentration & Modifying Surveillance Frequency for SLC Pump Operability Testing ML20085J2631995-06-15015 June 1995 Proposed Tech Specs Re Extension of Surveillance Intervals for Logic Sys Functional Testing for ECCS ML20083A7241995-05-0505 May 1995 Proposed Tech Specs Reflecting Changes to TSs & Associated Bases for License DPR-46 ML20083A1341995-05-0202 May 1995 Proposed Tech Specs Re Temporary Rev to SR to Extend Two Year LLRT Interval Requirement ML20149H8821994-12-27027 December 1994 Proposed Tech Specs Re Control Room Emergency Filter Sys ML20078S5711994-12-22022 December 1994 Proposed Tech Specs Re Definition of Lco,Per GL 87-09 ML20073J2371994-09-26026 September 1994 Proposed TS LCOs 3.5.C.1 & 3.5.C.4,increasing Min Pressure at Which HPCI Sys Required to Be Operable from Greater than 113 Psig to Greater than 150 Psig ML20071K1541994-07-26026 July 1994 Proposed Tech Specs to Increase Flow Capacity of Control Room Emergency Filter System ML20070M6671994-04-26026 April 1994 Proposed Tech Specs Re Intermittent Operation of Hydrogen/ Oxygen Analyzers ML20065K1931994-04-12012 April 1994 Proposed Tech Specs,Reflecting Removal of Definitions 1.0.Z.B.1 Through 5,change to LCO 3.21.B.1.a (Line 5) Re Ref to 10CFR20.106 & Change to Paragraphs 1,4,5 & 6 (Lines 6,3,8 & 2 Respectively) Re Ref to 10CFR20.106 ML20058N2321993-12-10010 December 1993 Proposed Tech Specs 3/4.21, Environ/Radiological Effluents, 6.5, Station Reporting Requirements & 6.5.1.C.2 Re 10CFR50.59(b) Rept ML20058N2881993-12-10010 December 1993 Proposed Tech Specs for Pressure Vs Temp Operating Limit Curves ML20058M2591993-09-28028 September 1993 Proposed Tech Specs Modifying Organizational Structure by Removing Mgt Positions of Site Manager & Senior Manager of Operation ML20056G5971993-08-31031 August 1993 Proposed TS Re Primary Containment Isolation Valve Tables ML20056G5821993-08-31031 August 1993 Proposed TS Re Primary & Secondary Containment Integrity ML20056G2341993-08-25025 August 1993 Proposed Tech Specs Bases Section to Reflect Operational & Design Changes Made to CNS Svc Water Sys During 1993 Refueling Outage ML20056F3331993-08-23023 August 1993 Proposed Tech Specs 6.0, Administrative Controls, Reflecting Creation of Mgt Position of Vice President - Nuclear ML20045D8991993-06-23023 June 1993 Proposed TS SR 4.9.A.2 Re Determination of Particulate Concentration Level of Diesel Fuel Oil Storage Tanks ML20045C0031993-06-14014 June 1993 Proposed Tech Specs Associated W/Dc Performance Criteria ML20045C8301993-06-14014 June 1993 Proposed Tech Specs Incorporating New Requirements of 10CFR20 ML20128L5561993-02-12012 February 1993 Proposed TS Table 4.2.D, Min Test & Calibr Frequencies for Radiation Monitoring Sys & TS Pages 81 & 84 Re Notes for Tables 4.2.A Through 4.2.F ML20128E6201993-02-0101 February 1993 Proposed Tech Specs Reflecting Current NRC Positions Re Leak Detection & ISI Schedules,Methods,Personnel & Sample Expansion,Per GL 88-01 ML20127B8331993-01-0505 January 1993 Proposed TS Pages 53,55,70 & 71,removing Bus 1A & 1B Low Voltage Auxiliary Relays ML20115F8531992-10-15015 October 1992 Proposed Tech Specs Page 48,reflecting Relocation of Mechanical Vacuum Pump Isolation SRs ML20115A3481992-10-0808 October 1992 Proposed TS Section 6.1.2 Re Offsite & Onsite Organizations, Delineating Responsibilities of Site Manager & 6.2.1.A Re Min Composition of Station Operations Review Committee ML20104B2091992-09-0909 September 1992 Proposed TS 3.1.1 Re Reactor Protection Sys Instrumentation Requirements & TS Table 3.2.D Re Radiation Monitoring Sys That Initiate &/Or Isolate Sys ML20104A8691992-09-0202 September 1992 Proposed TS 3.9 & 4.9 Re Auxiliary Electrical Sys ML20099D4151992-07-28028 July 1992 Proposed TS 3.6 Re LCO for Primary Sys Boundary & 4.6 Re Surveillance Requirements for Primary Sys Boundary ML20113G8241992-05-0404 May 1992 Proposed Tech Spec Pages for Removal of Component Lists,Per Generic Ltr 91-08 ML20096D6111992-05-0404 May 1992 Proposed Tech Specs Change 100 to Eliminate Main Steam Line Radiation Monitor Scram & Isolation Functions ML20090A8061992-02-25025 February 1992 Proposed Tech Specs Re Dc Power Sys 1999-06-08
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217C7961999-10-0606 October 1999 Marked-up & Type Written Proposed TS Pages,Revising TSs 1.0, 3.6,Bases 3.0,Bases 3.6 & 5.5,to Adopt Implementation Requirements of 10CFR50,App J,Option B for Performance of Type A,B & C Containment Leakage Rate Testing ML20209A7351999-06-23023 June 1999 Proposed Tech Specs Pages 3.3-4 & 3.3-6,replacing Page 3.3-6 Re Recirculation Loop Flow Transmitters & Applicable SRs Associated with Function 2.b ML20196B4741999-06-17017 June 1999 Proposed Tech Specs Bases Changes Made at Plant Subsequent to Receipt of License Amend 178,dtd 980731,for Conversion to Its,Through 990610 ML20195E9101999-06-0808 June 1999 Proposed Tech Specs,Correcting Described Method by Which SGTS Heaters Are to Be Tested ML20207A0761999-05-14014 May 1999 Rev 3 to CNS Strategy for Achieving Engineering Excellence ML20206J2661999-04-22022 April 1999 CNS Offsite Dose Assessment Manual (Odam) ML20205H2891999-03-31031 March 1999 Proposed Tech Specs Modifying ACs for Unit Staff Qualifications for Shift Supervisor,Senior Operator,Licensed Operator,Shift Technical Advisor & Radiation Manager Positions ML20151Q0621998-07-28028 July 1998 Final Version of Improved TS & Bases Re Proposed Change to Conversion to Improved Standard TS ML20236W1141998-07-28028 July 1998 Proposed Tech Specs Re Implementation of BWR Thermal Hydraulic Stability Solution ML20236R9821998-07-16016 July 1998 Proposed Tech Specs Section 6.5.1,re Implementation of BWR Thermal Hydraulic Stability Solution ML20236Q0641998-07-13013 July 1998 Proposed Tech Specs Re Rev B to Conversion to Improved STS ML20206P9051998-07-0707 July 1998 Rev 2, Strategy for Achieving Engineering Excellence, for Cooper Nuclear Station ML20216H0571998-04-15015 April 1998 Proposed Tech Specs 4.2.C,exempting Neutron Detectors from Channel Calibr Requirements ML20216H0801998-04-15015 April 1998 Proposed Tech Specs Sections 2.1.A.1.d & 3.2.C,deleting Max Rated Power for APRM Rod Block Trip Setting ML20216D8971998-04-0808 April 1998 Rev 1 to Strategy for Achieving Engineering Excellence ML20216B4481998-04-0202 April 1998 Proposed Tech Specs 4.2.C,exempting Neutron Detectors from Channel Calibr Requirements ML20203G4271998-02-24024 February 1998 Rev 0 to First Ten-Year Interval Containment Insp Program for Cns ML20202H5311998-02-11011 February 1998 Strategy for Achieving Engineering Excellence ML20216G1571997-09-0505 September 1997 Rev 2.1 to Third 10-Yr Interval Inservice Insp Program ML20210H5641997-08-0707 August 1997 Rev 2 to NPPD CNS Third Interval Inservice Testing Program ML20148G3481997-05-30030 May 1997 Proposed Tech Specs,Changing Frequency of Testing RHR Cross Tie valve,RHR-MOV-MO20,position Indication from Once Per Month to Once Per Operating Cycle ML20148G8531997-05-0909 May 1997 Nebraska Public Power District Nuclear Power Group Phase 3 Performance Improvement Plan, Closure Rept ML20138J0751997-05-0505 May 1997 Proposed Tech Specs,Relocating Control of Standby Liquid Control Relief Valve Setpoint in TS 4.4.A.2.a & Associated Bases ML20148B0041997-05-0202 May 1997 Proposed Tech Specs,Deleting SLC Relief Valve Testing Described in TS Section 4.4.A.2.a & Associated Bases in Bases Section 3.4.A Since Testing Is Already Performed Under ISI Program ML20138H3861997-04-29029 April 1997 Rev 1.2 to CNS Third Interval IST Program ML20134K3771997-02-10010 February 1997 Proposed Tech Specs Re Requirements for Avoidance & Protection from Thermal Hydraulic Instabilities to Be Consistent w/NEDO-31960 & NEDO-31960,Suppl 1, BWR Owners Group Long-Term Stability Solutions.. ML20134E1091996-10-25025 October 1996 NPPD Cooper Nuclear Station Third Interval IST Program, Rev 1 ML20117K3291996-06-0606 June 1996 Proposed Tech Specs Revising Safety Limit MCPR from 1.06 to 1.07 for Dual Recirculation Loop Operation & from 1.07 to 1.08 for Single Recirculation Loop Operation ML20100R4431996-03-0505 March 1996 Proposed Tech Specs,Consisting of Change Request 142, Revising TS, DG Enhancements ML20101L8381995-12-31031 December 1995 Reactor Containment Bldg Integrated Leak Rate Test. W/ ML20113B0531995-12-29029 December 1995 Rev 4.1 to NPPD CNS Second Ten Yr Interval ISI Program for ASME Class 1,2 & 3 Components ML20093L1901995-10-18018 October 1995 Rev 0 to Third Ten-Yr Interval ISI Program for Cns ML20086K4421995-07-14014 July 1995 Revised Proposed Tech Specs Re DG Enhancements Reflecting More Conservative Approach to Enhancing DGs ML20086H7341995-07-14014 July 1995 Rev 7 to CNS Second Ten Yr Interval IST Program ML20086H7601995-06-30030 June 1995 Rev 4 to CNS Second Ten Yr Interval ISI Program for ASME Class 1,2 & 3 Components ML20086B7061995-06-28028 June 1995 Proposed Tech Specs Re Increasing Required RPV Boron Concentration & Modifying Surveillance Frequency for SLC Pump Operability Testing ML20085J2631995-06-15015 June 1995 Proposed Tech Specs Re Extension of Surveillance Intervals for Logic Sys Functional Testing for ECCS ML20083A7241995-05-0505 May 1995 Proposed Tech Specs Reflecting Changes to TSs & Associated Bases for License DPR-46 ML20083A1341995-05-0202 May 1995 Proposed Tech Specs Re Temporary Rev to SR to Extend Two Year LLRT Interval Requirement ML20083M0401995-01-20020 January 1995 Rev 1 to Restart Readiness Program ML20083M0901995-01-13013 January 1995 Rev 2 to Startup & Power Ascension Plan ML20149H8821994-12-27027 December 1994 Proposed Tech Specs Re Control Room Emergency Filter Sys ML20078S5711994-12-22022 December 1994 Proposed Tech Specs Re Definition of Lco,Per GL 87-09 ML20083M0141994-11-0909 November 1994 Rev 3 to Phase 1 Plan, ML20083M0321994-11-0808 November 1994 Rev 0 to Restart Readiness Program ML20073J2371994-09-26026 September 1994 Proposed TS LCOs 3.5.C.1 & 3.5.C.4,increasing Min Pressure at Which HPCI Sys Required to Be Operable from Greater than 113 Psig to Greater than 150 Psig ML20149F9921994-09-15015 September 1994 Rev 1 to CNS Startup Plan ML20071K9311994-07-27027 July 1994 Diagnostic Self Assessment (DSA) Implementation Plan ML20071K1541994-07-26026 July 1994 Proposed Tech Specs to Increase Flow Capacity of Control Room Emergency Filter System ML20070M6671994-04-26026 April 1994 Proposed Tech Specs Re Intermittent Operation of Hydrogen/ Oxygen Analyzers 1999-06-08
[Table view] |
Text
- . - - _ _ _ _ _ _ _ _ _ _ _ _
LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS b) Conducting a hose hydrostatic test at a pressure at least 50 psig greater than the maximum pressure available at that hose station.
4.19 FIRE AREA BARRIERS AND PENETRATION 3.19 FIRE AREA BARRIERS AND PENETRATION FIRE SEALS FIRE SEALS Applies to the integrity of Fire Area APPLICABILITY __ Barriers and Penetration Fire Seals protecting Fire Areas containing safe Applies to the integrity of Fire Area shutdown systems, equipment, or components, Barriers and Penetration Fire Seals and fire barriers separating portions of protecting Fire Areas containing safe redundant safe shutdown systems within a shutdown systems , equipment, or fire area.
components. and fire barriers separating SPECIFICATIONS portions or, redundant safe shutdown systems within a fire area. A. Fire Area Barriers and Fire Area Barrier Penetration Fire Seals shall -
OBJECTIVE be verified to be functional by at least every 18 months performing a To assure the integrity of Fire Area visual inspection of:
Barriers and Penetration Fire Seals y, g protecting Fire Areas containing safe shutdown systems, equipment, or components, and to assure the integrity of 2. Each fire damper and associated fire barriers separating portions of hardware.
redundant safe shutdown systems within a
- 3. At least 10 percent of each type of sealed penetration. If SPECIFICATIONS changes in appearance or abnormal degradations are found, a visual A. Fire Area Barrier and Fire Area inspection of an additional Barrier Penetration Fire Seal 10 percent of each type of sealed integrity shall be maintained. penetration shall be made. This
, inspection process shall continue B. If the requirement of 3.19.A cannot until a 10 percent sample is be met, a continuous fire watch shall f und with no abnormal degradation. Sa=ples shall be be established on at least 1 side of the penetration within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, or selected such that each penetration seal will be verify the operability of fire detectors on at least one side of the inspected at least once per non-functional fire barrier and 15 years.
establish an hourly fire watch B. Fire doors through Fire Area Barriers patrol. shall be verified to be functional by inspecting the automatic hold-open, release and closing mechanism and 8803160028 080304 latches at least once per 31 days, and PDR ADOCK 05000298 bv verifying:
P PDR *
- 1. At least once per 31 days, the operability of the fire door electrical supervision for each alarmed fire door by perfor=ing a channel functional test.
-216h-
l l
1 3.14-3.19/4.14-4.19 BASES 3.14/4.14 FIRE DETECTION INSTRUMENTATION OPERABILITY of the fire detection instrumentation ensures that adequate warning capability is available for the prompt detection of fires. This cap-ability is required in order to detecc and locate fires in their early stages.
Prompt detection of fires will reduce the potential for damage to safety related equipment and is an integral element in the overall facility fire protection program.
In the event that a portien of the fire detection instrumentation is in-operable, the establishment of frequent fire patrols in the affected areas is required to provide detection capability until the inoperable instrumentation is returned to service.
3.15-3.18/4.15-4.18 FIRE SUPPRESSION SYSTEMS THE OPERASILITY of the fire suppression systems ensures that adequate fire suppression capability is available to confine and extinguish fires occur.ing in any portion of the facility where safety related equipment is located. The fire suppression system consists of the water system, spray and/or sprinklers, CO 2' Halen 1301, and fire hose stations. The collective capability of the fire .
suppression syste=s is adequate to minimize potential damage to safety related equipment and is a major element in the facility fire protection program. The Halon Fire Suppression System consists of two storage tanks, each exceeding the design capacity required for extinguishment of a fire in the service water pump room in accordance with the National Fire Protection Association Standards.
In the event that portions of the fire suppression systems are inoperable, alternate backup fire fighting equipment is required to be made available in the affected areas until the affected equipment can be restored to service.
In the event the fire suppression water system becomes inoperable, im-eediate corrective measures must be taken since this system provides the major fire suppression capability of the plant. The require =ent for twenty-four hour report to the Commission provides for prompt evaluation of the acceptability of the corrective measures to provide adequate fire suppression capability for the continued protection of the nuclear plant.
3.19/4.19 FIRE AREA BARRIERS AND PENETRATION SEALS The functional intekrity of the fire area barrier penetration seals ensures that fires will be confined or adequately retarded from spreading to adjacent portions of the facility. This design feature minimizes the possibility of a single fire rapidly involving several areas of the facility prior to detection and extinguish-ment. The fire area barrier penetration seals are a passive element in the facility fire protection program and are subject to periodic inspections. l During periods of time when the seals are not functional, a continuous fire watch is required to be maintained in the vicinity of the af f ected seal, or an hourly fire watch patrol can be established once the operability of a fire detector on at least one side of the affected fire barrier has been verified. A vacch or patrol will be maintained until the seal is restored to functional status.
1
-216m-
3.19/4.19 FIRE AREA BARRIERS AND PENETRATION SEALS Fire area barriers are those components of construction which establish the boundaries of the fire areas described in the CNS. Fire Hazards Analysis (current revision). They consist of walls, floors, and' supports'(Beams, joists, columns)'1 ,
penetration seals or closures, fire doors, and fire dampers that are rated by approving laboratories or by other means in hours of resistance to fire and are used to prevent the spread of fire. Also subject to the operability and surveillance requirements are those fire barriers that separate portions of redundant safe shutdown systems'within a fire area. The specific fire barriers which were installed to separate portions of redundant safe shutdown systems within a fire area are identified as exemptions to' 10CFR50 Appendix R in the "CNS Response to 10CFR50 Appendix R ' Fire Protection of Safe Shutdown Capability'."
Fire area barrier penetration seals include cable penetration barriers, fire doors, and fire da=pers.
i 1
i l
c
-216m1-
, - .