ML20153D380

From kanterella
Revision as of 03:39, 24 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of Significant Licensee Meeting 86-023 on 860305 W/Util in Plymouth,Ma to Discuss SALP Mgt Meeting
ML20153D380
Person / Time
Site: Pilgrim
Issue date: 02/19/1986
From: Lester Tripp
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8602240122
Download: ML20153D380 (2)


Text

_

vr ,o FEB 191986 U.S. NUCLEAR REGULATORY COMMISSION No.86-023 REGION I ,

NOTICE OF SIGNIFICANT LICENSEE MEETING Licensee: Boston Edison Company Facility: Pilgrim Nuclear Power Station Docket No.: 50-293 Time and Date: 1:00 p.m., March 5, 1986 Location: Chiltonville Training Center, Plymouth, Massachusetts i l

Purpose:

Systematic Assessment'of Licensee Performance (SALP) Management Meeting NRC Attendees: T. Murley Regional Administrator R. Starostecki Director, Division of Reactor Projects (DRP) l S. Ebneter Director, Division of Reactor Safety (DRS) H T. Martin Director, Division of Radiation Safety and '

Safeguards (DRSS)

J. Zwolinski Director, BWR Directorate No. 1, NRR E. Wenzinger Chief, Projects Branch No. 3, DRP L. Tripp Chief, Reactor Projects Section 3A, DRP P. Leech Project Manager, NRR M. McBride Senior Resident Inspector Licensee Attendees: S. Sweeney President W. Harrington Senior Vice President, Nuclear E. Howard Vice President, Nuclear Engineering and QA L. Oxsen Vice President, Nuclear Operations C. Mathis Nuclear Operations Manager Note: Attendance by NRC personnel at this meeting should be made known by 4:00 p.m., March 3, 1986, to L. Tripp, Region I, at FTS 8-486-1227.

Prepared by

,. L. E. Tripp, Chief, RPS 3A, DRP Distribution:

V. Stello, Acting Eaecutive Director for Operations J. Taylor, Director, Office of Inspection and Enforcement J. Axelrad, Director, Enforcement Staff, IE J. Lieberman, Director and Chief Counsel, Regional Operations and Enforcement Division, OELD J. Zwolinski, Director, BWR Directorate No. 1, NRR  ;

P. Leech, Project Manager, NRR Public Document Room (PDR)

Local Public Document Room (LPDR)

_J

,[ Q 2 tts 15 88'

- egional Administrator Deputy Regional Administrator Division Directors-Branch Chiefs Public Affairs Officer J. Gutierrez D.'Holody Region I Receptionist

.DRMA Files-RI:DRP If, RP er/meo Tripp

/14/86 g/g[g

ll '

0FFICIAL RECORD COPY I


_____.'