NRR E-mail Capture - ANO-1 - Acceptance Review of Relief Request ANO1-ISI-034
ML20262H076
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 09/18/2020
From: Thomas Wengert
NRC/NRR/DORL/LPL4
To: Keele R
Entergy Nuclear Operations
Wengert T
References
L-2020-LLR-0110
Download: ML20262H076 (3)


Text

From: Wengert, Thomas Sent: Friday, September 18, 2020 10:37 AM To: Keele Jr, Riley D Cc: Clark, Robert; BICE, DAVID B (ANO); Dixon-Herrity, Jennifer

Subject:

ANO Acceptance Review of Relief Request ANO1-ISI-034 (EPID L-2020-LLR-0110)

By letter dated August 11, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20227A112), Entergy Operations, Inc. (the licensee) requested that, pursuant to Section 50.55a(z)(1) of Title 10 of the Code of Federal Regulations (10 CFR),

the Nuclear Regulatory Commission (NRC) approve relief for the Arkansas Nuclear One, Unit 1 (ANO-1) high pressure injection (HPI) nozzle D dissimilar metal weld containing Alloy 82/182.

This alternative request would permit the one-time extension of the volumetric examination frequency of Code Case N-770-5, Alternative Examination Requirements and Acceptance Standards for Class 1 PWR [Pressurized Water Reactor] Piping and Vessel Nozzle Butt Welds Fabricated with UNS N06082 or UNS W86182 Weld Filler Material with or without Application of Listed Mitigation Activities, Inspection Item B-1, as conditioned by 10 CFR 50.55a from the required frequency of not to exceed seven years, to a proposed nominal frequency of 7.5 calendar years.

The regulation in 10 CFR 50.55a(z)(1) states that alternatives to the requirements of 10 CFR 50.55a may be authorized by the NRC if the licensee demonstrates that the proposed alternative would provide an acceptable level of quality and safety.

The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review.

The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated the jobhour expenditures to total approximately 150 hours0.00174 days <br />0.0417 hours <br />2.480159e-4 weeks <br />5.7075e-5 months <br />. The NRC staff expects to complete its review of the request by your requested date of February 10, 2021. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change due to several factors, including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me.

Tom Wengert Project Manager - Arkansas Nuclear One NRC/NRR/DORL/LPL4 (301) 415-4037

Hearing Identifier: NRR_DRMA Email Number: 793 Mail Envelope Properties (DM6PR09MB47593120E2627ED02C6C98818F3F0)

Subject:

ANO Acceptance Review of Relief Request ANO1-ISI-034 (EPID L-2020-LLR-0110)

Sent Date: 9/18/2020 10:37:04 AM Received Date: 9/18/2020 10:37:00 AM From: Wengert, Thomas Created By: Thomas.Wengert@nrc.gov Recipients:

"Clark, Robert" <RCLARK@entergy.com>

Tracking Status: None "BICE, DAVID B (ANO)" <DBICE@entergy.com>

Tracking Status: None "Dixon-Herrity, Jennifer" <Jennifer.Dixon-Herrity@nrc.gov>

Tracking Status: None "Keele Jr, Riley D" <rkeele@entergy.com>

Tracking Status: None Post Office: DM6PR09MB4759.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3751 9/18/2020 10:37:00 AM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: