Category:Letter
MONTHYEARIR 05000272/20244032024-09-25025 September 2024 and Salem Nuclear Generating Station, Units 1 and 2, Cybersecurity Inspection Report 05000354/2024403, 05000272/2024403, and 05000311/2024403 (Cover Letter Only) ML24267A1082024-09-23023 September 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report IR 05000272/20244022024-09-23023 September 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) ML24255A8042024-09-11011 September 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N24-0057, In-Service Inspection Activities2024-09-10010 September 2024 In-Service Inspection Activities 05000354/LER-2024-001, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement2024-09-0505 September 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000354/20240052024-08-29029 August 2024 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2024005) IR 05000272/20240052024-08-29029 August 2024 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2024005 and 05000311/2024005) LR-N24-0044, Relief Request VR-042024-08-0606 August 2024 Relief Request VR-04 IR 05000354/20240022024-07-30030 July 2024 Integrated Inspection Report 05000354/2024002 IR 05000272/20240022024-07-30030 July 2024 Integrated Inspection Report 05000272/2024002 and 05000311/2024002 LR-N24-0012, Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding2024-07-24024 July 2024 Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding ML24200A0572024-07-18018 July 2024 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves NUREG-1433, – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 52024-07-16016 July 2024 – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 5 ML24197A0552024-07-15015 July 2024 Requalification Program Inspection ML24145A1772024-07-15015 July 2024 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary LR-N24-0048, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT)2024-07-0202 July 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) LR-N24-0030, License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves2024-06-28028 June 2024 License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves IR 05000272/20245012024-06-12012 June 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24099A1572024-05-29029 May 2024 Issuance of Amendment Nos. 348 and 330 Permanent Extension of Type a and Type C Containment Leak Rate Test Frequencies ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement ML24150A1002024-05-28028 May 2024 Core Operating Limits Report, Reload 25, Cycle 26, Revision 23 LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response LR-N24-0004, License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-05-20020 May 2024 License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML24142A4072024-05-20020 May 2024 License Amendment Request (LAR) - Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5 IR 05000272/20240102024-05-16016 May 2024 Fire Protection Team Inspection Report 05000272/2024010 and 05000311/2024010 LR-N24-0038, Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger2024-05-0909 May 2024 Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger IR 05000354/20240012024-05-0808 May 2024 Integrated Inspection Report 05000354/2024001 IR 05000354/20240102024-05-0707 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000354/2024010 IR 05000272/20240012024-05-0707 May 2024 Integrated Inspection Report 05000272/2024001 and 05000311/2024001 LR-N24-0039, Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage2024-05-0606 May 2024 Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000354/20243012024-04-10010 April 2024 Initial Operator Licensing Examination Report 05000354/2024301 LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums LR-N24-0027, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-03-19019 March 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram ML24071A2132024-03-12012 March 2024 Senior Reactor and Reactor Operator Initial License Examinations LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report LR-N24-0022, Spent Fuel Cask Registration2024-02-29029 February 2024 Spent Fuel Cask Registration IR 05000272/20230062024-02-28028 February 2024 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023006 and 05000311/2023006 IR 05000354/20230062024-02-28028 February 2024 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2023006) IR 05000272/20244012024-02-26026 February 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) LR-N24-0010, Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges2024-02-22022 February 2024 Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges IR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 LR-N24-0009, In-Service Inspection Activities2024-02-0505 February 2024 In-Service Inspection Activities 2024-09-05
[Table view] Category:Report
MONTHYEARML23335A1122023-12-15015 December 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers ML23249A2622023-09-0606 September 2023 Attachment 1: PSEG Site Hourly Meteorological Data (2019 - 2021) LR-N22-0012, License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature2022-08-0707 August 2022 License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature ML21179A2352021-06-25025 June 2021 PSEG Salem Generating Station - Incidental Take Report Atlantic Sturgeon 6/24/2021 ML21078A0002021-03-25025 March 2021 Review of the Spring 2020 Steam Generator Tube Inspection Report LR-N21-0004, U.S Additional Protocol for Salem, Unit 12021-01-31031 January 2021 U.S Additional Protocol for Salem, Unit 1 LR-N21-0007, Report of Changes, Tests, and Experiments2021-01-28028 January 2021 Report of Changes, Tests, and Experiments LR-N20-0072, License Amendment Request to Amend Tech Specs to Revise and Relocate the Reactor Coolant System Pressure & Temperature Limits & Pressurizer Overpressure Protection System Limits to a Pressure & Temperature Limits Report2020-12-0606 December 2020 License Amendment Request to Amend Tech Specs to Revise and Relocate the Reactor Coolant System Pressure & Temperature Limits & Pressurizer Overpressure Protection System Limits to a Pressure & Temperature Limits Report ML20274A0762020-09-25025 September 2020 PSEG to NRC, Biological and Engineering Evaluation of Alternatives in Connection with Reinitation of Endangered Species Act Section 7 Consultation LR-N20-0010, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology2020-04-24024 April 2020 License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology ML20121A1332020-03-0303 March 2020 Biological Opinion 2019 Annual Incidental Take Report LR-N19-0103, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 20192019-11-26026 November 2019 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2019 LR-N19-0010, U.S. Additional Protocol for Salem Unit 1 2018 Report2019-01-31031 January 2019 U.S. Additional Protocol for Salem Unit 1 2018 Report ML19029B0172019-01-29029 January 2019 Containment Building, Salem Nuclear Generating Station, Structural Analysis & Design LR-N18-0056, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2018-07-25025 July 2018 Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions LR-N18-0057, Pressure and Temperature Limits Report, Revision 12018-06-0808 June 2018 Pressure and Temperature Limits Report, Revision 1 ML18337A3262018-01-30030 January 2018 Sturgeon Incidental Take Report and Data Collection Form for April 11, 2018 (1 of 2) ML18337A3252018-01-30030 January 2018 Sturgeon Incidental Take Report and Data Collection Form for March 28, 2018 ML18337A3242018-01-30030 January 2018 Sturgeon Incidental Take Report and Data Collection Form for February 6, 2018 LR-N17-0163, License Amendment Request - Safety Limit Minimum Critical Power Ratio Change, Non-Proprietary2017-11-0909 November 2017 License Amendment Request - Safety Limit Minimum Critical Power Ratio Change, Non-Proprietary LR-N17-0076, Focused Evaluation of External Flooding2017-06-30030 June 2017 Focused Evaluation of External Flooding LR-N17-0092, Supplemental Information to License Amendment Request to Amend the Technical Specifications (TS) to Revise and Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report2017-04-28028 April 2017 Supplemental Information to License Amendment Request to Amend the Technical Specifications (TS) to Revise and Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report ML17188A2672017-03-31031 March 2017 Enclosure 12 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1132NP, Meter Factor Calculation and Accuracy Assessment for Hope Creek Nuclear Generating Station, Revision 2, (Non-Proprietary Version) LR-N17-0044, Enclosure 12 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1132NP, Meter Factor Calculation and Accuracy Assessment for Hope Creek Nuclear Generating Station, Revision 2, (Non-Proprietary Version)2017-03-31031 March 2017 Enclosure 12 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1132NP, Meter Factor Calculation and Accuracy Assessment for Hope Creek Nuclear Generating Station, Revision 2, (Non-Proprietary Version) LR-N17-0051, Annual Report of Specific Activity Analysis - TS 6.9.1.5c2017-02-16016 February 2017 Annual Report of Specific Activity Analysis - TS 6.9.1.5c LR-N17-0049, Submittal of Cycle 21 Summary of Report of Plant Startup in Accordance with the Requirements of Technical Specification 6.9.1.12017-02-0909 February 2017 Submittal of Cycle 21 Summary of Report of Plant Startup in Accordance with the Requirements of Technical Specification 6.9.1.1 LR-N17-0036, License Renewal Commitment Implementation, 90-Day Report for Refueling Outage 202017-02-0707 February 2017 License Renewal Commitment Implementation, 90-Day Report for Refueling Outage 20 ML17188A2652016-12-31031 December 2016 Enclosure 10 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1123NP, Bounding Uncertainty Analysis for Thermal Power Determination at Hope Creek, Unit 1 Nuclear Generating Station Using the LEFM System, Revision 2 (Non-Proprietary Versi LR-N17-0044, Enclosure 10 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1123NP, Bounding Uncertainty Analysis for Thermal Power Determination at Hope Creek, Unit 1 Nuclear Generating Station Using the LEFM System, Revision 2 (Non-Proprietary Ve2016-12-31031 December 2016 Enclosure 10 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1123NP, Bounding Uncertainty Analysis for Thermal Power Determination at Hope Creek, Unit 1 Nuclear Generating Station Using the LEFM System, Revision 2 (Non-Proprietary Versi LR-N16-0161, Flood Hazards Mitigating Strategies Assessment (MSA) Report Submittal2016-12-30030 December 2016 Flood Hazards Mitigating Strategies Assessment (MSA) Report Submittal LR-N16-0112, Flood Hazards Mitigating Strategies Assessment (MSA) Report Submittal2016-12-29029 December 2016 Flood Hazards Mitigating Strategies Assessment (MSA) Report Submittal ML16256A6412016-09-12012 September 2016 NUREG-0800, Appendix 18-A Assessment, Crediting Manual Operator Actions in the Diversity and Defense-in-Depth Analyses. LR-N16-0113, NUREG-0800, Appendix 18-A Assessment, Crediting Manual Operator Actions in the Diversity and Defense-in-Depth Analyses.2016-09-12012 September 2016 NUREG-0800, Appendix 18-A Assessment, Crediting Manual Operator Actions in the Diversity and Defense-in-Depth Analyses. ML16280A5232016-08-31031 August 2016 Technical Evaluation Report Salem Generating Station Storm Surge Hazard Reevaluation Review ML16256A6422016-08-31031 August 2016 NED0-33872, Rev. 0, Hope Creek Generating Station Numac Prnm Upgrade Phase 2. ML16256A6402016-08-31031 August 2016 Hope Creek Power Range Neutron Monitoring Upgrade - Human Factors Engineering Assessment LR-N16-0113, NED0-33872, Rev. 0, Hope Creek Generating Station Numac Prnm Upgrade Phase 2.2016-08-31031 August 2016 NED0-33872, Rev. 0, Hope Creek Generating Station Numac Prnm Upgrade Phase 2. LR-N16-0113, Hope Creek Power Range Neutron Monitoring Upgrade - Human Factors Engineering Assessment2016-08-31031 August 2016 Hope Creek Power Range Neutron Monitoring Upgrade - Human Factors Engineering Assessment ML16256A6432016-07-18018 July 2016 ISG-06 Enclosure B Roadmap, Phase 2 Documents. LR-N16-0113, ISG-06 Enclosure B Roadmap, Phase 2 Documents.2016-07-18018 July 2016 ISG-06 Enclosure B Roadmap, Phase 2 Documents. LR-N16-0099, GNF-003N5734-R1-NP, Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR Hope Creek Cycle 21.2016-05-31031 May 2016 GNF-003N5734-R1-NP, Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR Hope Creek Cycle 21. ML16049A6092016-02-29029 February 2016 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations for Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident and Staff Closure LR-N16-0026, Annual Report of Specific Activity Analysis - TS 6.9.1.5c2016-02-26026 February 2016 Annual Report of Specific Activity Analysis - TS 6.9.1.5c LR-N15-0218, Revised Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report2015-10-21021 October 2015 Revised Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report LR-N15-0207, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report2015-10-0707 October 2015 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report ML16256A6442015-09-30030 September 2015 NED0-33864, Rev. 0, Appendix B, Numac Systems Engineering Development Plan. LR-N15-0178, NEDO-33864, Revision 0, Hope Creek Generating Station Numac Prnm Upgrade, (Non-Proprietary)2015-09-30030 September 2015 NEDO-33864, Revision 0, Hope Creek Generating Station Numac Prnm Upgrade, (Non-Proprietary) LR-N16-0113, NED0-33864, Rev. 0, Appendix B, Numac Systems Engineering Development Plan.2015-09-30030 September 2015 NED0-33864, Rev. 0, Appendix B, Numac Systems Engineering Development Plan. ML15119A1612015-04-17017 April 2015 Report of Impingement of Atlantic Sturgeon LR-N14-0268, Special Report 272/2014-008, One Channel of Reactor Vessel Level Instrumentation System (RVLIS) Inoperable Greater than 30 Days2014-12-24024 December 2014 Special Report 272/2014-008, One Channel of Reactor Vessel Level Instrumentation System (RVLIS) Inoperable Greater than 30 Days 2023-09-06
[Table view] Category:Technical
MONTHYEARML23249A2622023-09-0606 September 2023 Attachment 1: PSEG Site Hourly Meteorological Data (2019 - 2021) LR-N22-0012, License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature2022-08-0707 August 2022 License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature LR-N21-0004, U.S Additional Protocol for Salem, Unit 12021-01-31031 January 2021 U.S Additional Protocol for Salem, Unit 1 LR-N20-0072, License Amendment Request to Amend Tech Specs to Revise and Relocate the Reactor Coolant System Pressure & Temperature Limits & Pressurizer Overpressure Protection System Limits to a Pressure & Temperature Limits Report2020-12-0606 December 2020 License Amendment Request to Amend Tech Specs to Revise and Relocate the Reactor Coolant System Pressure & Temperature Limits & Pressurizer Overpressure Protection System Limits to a Pressure & Temperature Limits Report ML20274A0762020-09-25025 September 2020 PSEG to NRC, Biological and Engineering Evaluation of Alternatives in Connection with Reinitation of Endangered Species Act Section 7 Consultation LR-N20-0010, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology2020-04-24024 April 2020 License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology ML20121A1332020-03-0303 March 2020 Biological Opinion 2019 Annual Incidental Take Report LR-N19-0103, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 20192019-11-26026 November 2019 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2019 ML19029B0172019-01-29029 January 2019 Containment Building, Salem Nuclear Generating Station, Structural Analysis & Design LR-N18-0057, Pressure and Temperature Limits Report, Revision 12018-06-0808 June 2018 Pressure and Temperature Limits Report, Revision 1 ML18337A3242018-01-30030 January 2018 Sturgeon Incidental Take Report and Data Collection Form for February 6, 2018 ML18337A3252018-01-30030 January 2018 Sturgeon Incidental Take Report and Data Collection Form for March 28, 2018 ML18337A3262018-01-30030 January 2018 Sturgeon Incidental Take Report and Data Collection Form for April 11, 2018 (1 of 2) LR-N17-0163, License Amendment Request - Safety Limit Minimum Critical Power Ratio Change, Non-Proprietary2017-11-0909 November 2017 License Amendment Request - Safety Limit Minimum Critical Power Ratio Change, Non-Proprietary LR-N17-0092, Supplemental Information to License Amendment Request to Amend the Technical Specifications (TS) to Revise and Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report2017-04-28028 April 2017 Supplemental Information to License Amendment Request to Amend the Technical Specifications (TS) to Revise and Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report ML17188A2672017-03-31031 March 2017 Enclosure 12 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1132NP, Meter Factor Calculation and Accuracy Assessment for Hope Creek Nuclear Generating Station, Revision 2, (Non-Proprietary Version) LR-N17-0044, Enclosure 12 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1132NP, Meter Factor Calculation and Accuracy Assessment for Hope Creek Nuclear Generating Station, Revision 2, (Non-Proprietary Version)2017-03-31031 March 2017 Enclosure 12 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1132NP, Meter Factor Calculation and Accuracy Assessment for Hope Creek Nuclear Generating Station, Revision 2, (Non-Proprietary Version) ML17188A2652016-12-31031 December 2016 Enclosure 10 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1123NP, Bounding Uncertainty Analysis for Thermal Power Determination at Hope Creek, Unit 1 Nuclear Generating Station Using the LEFM System, Revision 2 (Non-Proprietary Versi LR-N17-0044, Enclosure 10 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1123NP, Bounding Uncertainty Analysis for Thermal Power Determination at Hope Creek, Unit 1 Nuclear Generating Station Using the LEFM System, Revision 2 (Non-Proprietary Ve2016-12-31031 December 2016 Enclosure 10 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1123NP, Bounding Uncertainty Analysis for Thermal Power Determination at Hope Creek, Unit 1 Nuclear Generating Station Using the LEFM System, Revision 2 (Non-Proprietary Versi ML16256A6422016-08-31031 August 2016 NED0-33872, Rev. 0, Hope Creek Generating Station Numac Prnm Upgrade Phase 2. ML16280A5232016-08-31031 August 2016 Technical Evaluation Report Salem Generating Station Storm Surge Hazard Reevaluation Review LR-N16-0113, NED0-33872, Rev. 0, Hope Creek Generating Station Numac Prnm Upgrade Phase 2.2016-08-31031 August 2016 NED0-33872, Rev. 0, Hope Creek Generating Station Numac Prnm Upgrade Phase 2. ML16256A6442015-09-30030 September 2015 NED0-33864, Rev. 0, Appendix B, Numac Systems Engineering Development Plan. LR-N15-0178, NEDO-33864, Revision 0, Hope Creek Generating Station Numac Prnm Upgrade, (Non-Proprietary)2015-09-30030 September 2015 NEDO-33864, Revision 0, Hope Creek Generating Station Numac Prnm Upgrade, (Non-Proprietary) LR-N16-0113, NED0-33864, Rev. 0, Appendix B, Numac Systems Engineering Development Plan.2015-09-30030 September 2015 NED0-33864, Rev. 0, Appendix B, Numac Systems Engineering Development Plan. ML15030A3012014-09-22022 September 2014 Table 08, Unit 2 Seismic Gap Drain Tritium Analytical Results ML15030A2942014-09-22022 September 2014 Table 03, Effluent Data Tritium Activity ML15030A2762014-09-22022 September 2014 Figure 11, Station Wind Summary - Q1 2014 ML15030A2752014-09-22022 September 2014 Figure 10, Precipitation Measurements ML15030A2512014-09-22022 September 2014 Figure 9, Salem Generating Station Hydrogeologic Cross Section E-E' ML15030A2502014-09-22022 September 2014 Figure 8,Salem Generating Station Hydrogeologic Cross Section D-D' ML15030A2492014-09-22022 September 2014 Figure 7, Salem Generating Station Hydrogeologic Cross Section C-C' ML15030A2482014-09-22022 September 2014 Figure 6, Salem Generating Station Hydrogeologic Cross Section B-B' ML15030A2472014-09-22022 September 2014 Figure 5, Salem Generating Station Hydrogeologic Cross Section A-A' ML15030A2462014-09-22022 September 2014 Figure 4, Station Shallow Groundwater Elevation Contours - February 2014 ML15030A2452014-09-22022 September 2014 Figure 3, Salem Generating Station Layout Map ML15030A2792014-09-22022 September 2014 Figure 13, Tritium Isoconcentration Map - March 2014 ML15030A2802014-09-22022 September 2014 Figure 14, Historic Tritium Recovered Through Well Field Operation ML15030A2442014-09-22022 September 2014 Figure 2, Station Layout Map ML15030A2432014-09-22022 September 2014 Figure 1, Site Location Map ML15030A2422014-09-22022 September 2014 Appendix a, Mass Flux Calculations ML15030A2812014-09-22022 September 2014 Figure 15, Salem Unit 1 - Tritium Concentrations in Water Recovered Through Seismic Gap Drain Operation ML15030A2822014-09-22022 September 2014 Figure 16, Salem Unit 2 - Tritium Concentrations in Water Recovered Through Seismic Gap Drain Operation ML15030A2832014-09-22022 September 2014 Table 01, Well Construction Details ML15030A2842014-09-22022 September 2014 Table 02, Sample Collection Schedule - First & Second Quarter 2014 ML15030A2952014-09-22022 September 2014 Table 04, Groundwater Measurements and Elevations - First Quarter 2014 ML15030A2962014-09-22022 September 2014 Table 05, Groundwater Analytical Results (1.22.2003 Through 3.31.2014) ML15030A2982014-09-22022 September 2014 Table 06A, Groundwater Tritium Analytical Results for Well AC ML15030A2992014-09-22022 September 2014 Table 06B, Groundwater Analytical Results for Well AC ML15030A3002014-09-22022 September 2014 Table 07, Unit 1 Seismic Gap Drain Tritium Analytical Results 2023-09-06
[Table view] |