IR 05000272/2023004 | 5 February 2024 | Integrated Inspection Report 05000272/2023004 and 05000311/2023004 | |
ML24030A875 | 1 February 2024 | Operator Licensing Examination Approval | |
IR 05000354/2023004 | 1 February 2024 | Integrated Inspection Report 05000354/2023004 | Shutdown Margin High Radiation Area Internal Flooding Enforcement Discretion Operating Basis Earthquake Functionality Assessment Locked High Radiation Area Missed surveillance Significance Determination Process Operability Determination Fire Protection Program |
ML24009A102 | 26 January 2024 | Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) | |
IR 05000272/2023401 | 22 January 2024 | Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 | |
IR 05000354/2023401 | 22 January 2024 | Material Control and Accounting Program Inspection Report 05000354/2023401 | |
ML23341A137 | 16 January 2024 | Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning | |
ML24004A154 | 8 January 2024 | Notification of Conduct of a Fire Protection Team Inspection | |
ML23307A153 | 15 December 2023 | NRC Investigation Report No. 1-2023-001 | Significance Determination Process Inattentive |
ML23335A112 | 15 December 2023 | Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers | |
LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days | 7 December 2023 | Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days | |
LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion | 29 November 2023 | Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion | Loop seal |
ML23270C007 | 29 November 2023 | Notice of Proposed Amendment to Decommissioning Trust Agreement | |
ML23324A307 | 17 November 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Time of Discovery Contraband Exemption Request |
IR 05000272/2023003 | 13 November 2023 | Integrated Inspection Report 05000272/2023003 and 05000311/2023003 | Boric Acid Temporary Modification Functionality Assessment Significance Determination Process Operability Determination Maintenance Rule Program Biofouling Through Wall Leak Fire Protection Program Operability Assessment |
IR 05000354/2023003 | 7 November 2023 | Integrated Inspection Report 05000354/2023003 | Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment Condition Adverse to Quality Significance Determination Process Scram Discharge Volume Operability Determination Fire Protection Program Downpower |
LR-N23-0072, Core Operating Limits Report Cycle 30 | 1 November 2023 | Core Operating Limits Report Cycle 30 | |
IR 05000272/2023402 | 12 October 2023 | and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) | Affidavit |
IR 05000272/2023010 | 12 October 2023 | Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 | Safe Shutdown Cyber Security Significance Determination Process Fire Protection Program |
LR-N23-0065, Submittal of 2023 Annual 10 CFR 50.46 Report | 2 October 2023 | Submittal of 2023 Annual 10 CFR 50.46 Report | |
LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement | 8 September 2023 | and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement | |
ML23249A261 | 6 September 2023 | License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary | Deep Dose Equivalent |
IR 05000272/2023005 | 31 August 2023 | Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) | Fitness for Duty Cyber Security |
IR 05000354/2023005 | 31 August 2023 | Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2023005) | Fitness for Duty Cyber Security License Renewal |
ML23233A076 | 21 August 2023 | Requalification Program Inspection | |
ML23192A821 | 14 August 2023 | and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location | Fire Protection Program |
IR 05000272/2023002 | 9 August 2023 | Integrated Inspection Report 05000272/2023002 and 05000311/2023002 | Safe Shutdown Boric Acid High Radiation Area Fire Barrier Internal Flooding Fire impairment Nondestructive Examination Temporary Modification Functionality Assessment Locked High Radiation Area Significance Determination Process Operability Determination COVID-19 Fire Protection Program Fire Watch Dissimilar Metal Weld Incremental Core Damage Probability Deficit Power change Operability Assessment |
LR-N23-0055, Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days | 3 August 2023 | Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days | |
IR 05000354/2023002 | 3 August 2023 | Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001 | Shutdown Margin Packing leak Temporary Modification Functionality Assessment FLEX Significance Determination Process Operability Determination COVID-19 Fire Protection Program |
IR 05000354/2023010 | 3 August 2023 | Biennial Problem Identification and Resolution Inspection Report 05000354/2023010 | Safe Shutdown Safe Shutdown Earthquake Functionality Assessment Operability Determination |
LR-N23-0052, Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.1 | 31 July 2023 | Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.1 | |
LR-N23-0054, In-Service Inspection Activities | 26 July 2023 | In-Service Inspection Activities | |
LR-N23-0042, Spent Fuel Cask Registration | 12 July 2023 | Spent Fuel Cask Registration | |
LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 2023 | 10 July 2023 | Emergency Plan Document Revisions Implemented June 28, 2023 | Deep Dose Equivalent Power change |
LR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | 23 June 2023 | License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | Hot Short Safe Shutdown Boric Acid High winds Weld Overlay Internal Flooding Probabilistic Risk Assessment Coatings Emergency Lighting Incorporated by reference FLEX Aging Management Test box Thermoset Local Leak Rate Testing Foreign Material Exclusion Large early release frequency Moisture barrier License Renewal Fuel cladding Power Uprate |
ML23139A147 | 5 June 2023 | Relief Request Associated with Fourth Interval In-service Inspection Limited Examinations of Weld Coverage | Nondestructive Examination VT-2 Incorporated by reference Pressure Boundary Leakage Through-Wall Leak Dissimilar Metal Weld |
ML23096A184 | 9 May 2023 | Issuance of Amendment No. 328 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report | Shutdown Margin High Radiation Area Offsite Dose Calculation Manual Anticipated operational occurrence Hydrostatic Pressure and Temperature Limits Report Surveillance Frequency Control Program Process Control Program Pressure Boundary Leakage |
IR 05000272/2023001 | 3 May 2023 | Integrated Inspection Report 05000272/2023001 and 05000311/2023001 | Safe Shutdown Boric Acid Enforcement Discretion Temporary Modification Functionality Assessment Condition Adverse to Quality Aging Management Significance Determination Process Design basis earthquake Operability Determination License Renewal Fire Protection Program Downpower |
ML23081A466 | 2 May 2023 | Issuance of Amendment Nos. 346 and 327 Revise Technical Specifications to Extend Allowable Outage Time for Inoperable Emergency Diesel Generator | Safe Shutdown Probabilistic Risk Assessment FLEX Battery sizing Maintenance Rule Program Offsite Circuit Fire Protection Program |
IR 05000272/2023301 | 1 May 2023 | Initial Operator Licensing Examination Report 05000272/2023301 and 05000311/2023301 | |
ML23121A141 | 1 May 2023 | Senior Reactor and Reactor Operator Initial License Examinations | |
IR 05000354/2023011 | 1 May 2023 | Commercial Grade Dedication Report 05000354/2023011 | Commercial Grade Dedication |
LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR) | 27 April 2023 | 2022 Annual Radioactive Effluent Release Report (ARERR) | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report |
LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station | 27 April 2023 | 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Annual Radiological Effluent Release Report Tritium |
LR-N23-0033, Core Operating Limits Report Cycle 27 | 26 April 2023 | Core Operating Limits Report Cycle 27 | |
IR 05000354/2023001 | 26 April 2023 | Integrated Inspection Report 05000354/2023001 | Safe Shutdown Earthquake Enforcement Discretion Probabilistic Risk Assessment Functionality Assessment Condition Adverse to Quality Significance Determination Process Scram Discharge Volume Operability Determination Fire Protection Program Power change Downpower |
LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location | 21 April 2023 | License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location | Offsite Dose Calculation Manual |
LR-N23-0009, License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains | 18 April 2023 | License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains | Ultimate heat sink Anticipated operational occurrence GOTHIC |
ML23087A149 | 17 April 2023 | NRC to PSEG Salem, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek | |