ML20135B702

From kanterella
Revision as of 18:10, 22 July 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of 961218 Public Meeting W/Util in Arlington, Tx to Discuss Status of Plant Performance Improvement Program
ML20135B702
Person / Time
Site: Waterford Entergy icon.png
Issue date: 11/27/1996
From: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9612050105
Download: ML20135B702 (5)


Text

- ~ . . . ~ . - . - . - - ~ - - - . _ - _ . ~ . - . ~ . - ~ - - - . . _ . . _ . . - - . - ~ . - .

UNITED STAVES

.$g*

  • "' %q$*t NUCLEAR REGULATORY COMMISSION  !

REGloN IV e - .*g s f 611 RYAN PLAZA DRIVE, SulTE 400 9**..*/ ARLINGTON TEXAS 76011-8064 NOV 2 71996  !

NOTICE OF LICENSEE MEETING {

Name of Licensee: Entergy Operations, Inc.

Name of Facility: Waterford Steam Electric Station Docket: 50-382 1

Date and Time December 18,1996 )

of Meeting: 1 p.m. - 3 p.m. '

l Location of Meeting: Region IV ]

Arlington, Texas Training Conference Room Purpose of Meeting: Public meeting to discuss the status of the Waterford i Performance improvement Program NRC Attendees: L. Callan, Regional Administrator J. Dyer, Director, Division of Reactor Projects (DRP)

T. Gwynn, Director, Division of Reactor Safety P. Harrell, Chief, Project Branch D, DRP l Licensee Attendees: M. Sellman, Vice President, Operations C. Dugger, General Manager, Plant Operations J. Fisicaro, Director, Nuclear Safety A. Wrape 111, Director, Design Engineering T. Gaudet, Manager, Licensing D. Vinci, Manager, Systems Engineering NOTE:

(1) This meeting is open to attendance by members of the general public.

i (2) NRC personnel, not listed above, that desire to attend this meeting should notify l Gregory Werner at (817)860-8269by COB on December 11,1996.

l 1

I i i

e

/ ,

Approved By:

J. E. Dyer, Director l l Division of Reactor Projects I DISTRIBUTION:

i See next page i

9612050105 961127 PDR ADOCK 05000382 P PDR

h Entergy Operations, Inc. cc: i Michael B. Sellman, Vice President Operations - Waterford Entergy Operations, Inc.

P.O. Box B j Killona, Louisiana 70066 i Executive Vice President and Chief Operating Officer Entergy Operations, Inc.

P.O. Box 31995 Jackson, Mississippi 39286-1995 l

Vice President, Operations Support Entergy Operations, inc.

P.O. Box 31995 Jackson, Mississippi 39286-1995 Wise, Carter, Child & Caraway P.O. Box 651 Jackson, Mississippi 39205 General Manager, Plant Operations Waterford 3 SES Entergy Operations, Inc.

P.O. Box B Killona, Louisiana 70066 Manager - Licensing Manager Waterford 3 SES Entergy Operations, Inc.

P.O. Box B Killona, Louisiana 70066 Chairman Louisiana Public Service Commission One American Place, Suite 1630 Baton Rouge, Louisiana 70825-1697 Director Nuclear Safety Waterford 3 SES Entergy Operations, Inc.

P.O. Box B Killona, Louisiana 70066

1 l

Entergy Operations, Inc. William H. Spell, Administrator Louisiana Radiation Protection Division P.O. Box 82135 Baton Rouge, Louisiana 70884-2135 Parish President St. Charles Parish P.O. Box 302 Hahnville, Louisiana 70057 i Mr. William A. Cross Bethesda Licensing Office 3 Metro Center Suite 610 Bethesda, Maryland 20814 i

Winston & Strawn l 1400 L Street, N.W.

Washington, D.C. 20005-3502 i

I i

i

4 Entergy Operations, Inc. NOV 2 71996 E-Mail To: FOR 1

(4) NRC Attendees PMNS Mtg Announcement Coordinator SAM J. L. Milhoan, DEDR PAB H. L. Thompson, DEDS WTR W. T. Russell, D/NRR ACT A. C. Thadani, ADT/NRR RPZ R. P. Zimmerman, ADP/NRR CPP Project Manager, NRR OEMAIL J. Lieberman, D/OE LJC L. J. Chandler, OGC LAK L. A. Keller, Senior Resident inspector CAH C. A. Hackney, RSLO DMK1 D. M. Kunihiro, WCFO GFS G. F. Sanborn, EO BWH B. Henderson, PAO MFH2 M. Hammond, PAO JAC1, CMS, CJG RA Secretaries LAT, DLF, CAM 3 DRP Division LMB, CLG DRS Division CLS1, NLH, WSW DNMS Division LSO Linda Ousley cc:

DMB (IE 45)

OEDO RIV Coordinator (17G21) l Receptionist i ORA File j RIV File l 1

I To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy PE:DRP(p, n C:DRP/P, l'A0 M RSLO 14 D:Q$9 ,

GEWeg#r g PHhDjf{ W b BWHenderson CAHackney JEIf8erM 11/X /96 11/.ls/96 11/g /96 11/ 1 7 /96 11/ 2 7 /96 OFFICIAL F,ECORD COPY )

i l

I

. i i

4 Entergy Operations, Inc. -4 NOV 2 71996 l l

l l

1 E-Mail To: FOR l

1 (4) NRC Attendees PMNS Mtg Announcement Coordinator SAM J. L. Milhoan, DEDR PAB H. L. Thompson, DEDS WTR W. T. Russell, D/NRR ACT A. C. Thadani, ADT/NRR RPZ R. P. Zimmerman, ADP/NRR CPP Project Manager, NRR OEMAIL J. Lieberman, D/OE 1 LJC L. J. Chandler, OGC LAK L. A. Keller, Senior Resident inspector CAH C. A. Hackney, RSLO DMK1 D. M. Kunihiro, WCFO GFS G. F. Sanborn, EO BWH B. Henderson, PAO MFH2 M. Hammond, PAO JAC1, CMS, CJG RA Secretaries LAT, DLF, CAM 3 DRP Division LMB, CLG DRS Division CLS1, NLH, WSW DNMS Division LSO Linda Ousley cc: _.,.,..,,e., .

g;DMB (IE 45)"'

OEDO RIV Coordinator (17G21)

Receptionist ORA File RIV File I

t D To receive copy of document. Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy PE:DRP/p, ,, C:DRP/D. PA0 M RSLO M D:[P69 ,

GEWepi@QkL- PHhl'4({ W b BWHenderson CAHackney JMr 'N 11/X /96 11/.ls/96 11/1 /96 11/.1 C /96 11/ 2 7 /96 OFFICIAL RECORD COPY 050021