Category:CORRESPONDENCE-LETTERS
MONTHYEARML20058M5511990-08-0303 August 1990 Summarizes ACNW 22nd Meeting on 900730-31 to Review Plans for Decommissioning Plant,Per ML20245B4531989-06-0808 June 1989 Forwards Encl Listed Info on Decommissioned & Shutdown Reactors Requested During Discussions at Saxton on 890511 ML20125D1231985-02-14014 February 1985 Further Response to FOIA Request for Seven Categories of Documents Re Waste & Storage Disposal in South Dakota.Encl Documents Respond to Item 1 of Request.Search & Review of Remaining Documents Subj to Request Continuing ML20090M4981974-03-27027 March 1974 Forwards 1973 Annual Financial Rept,Including Certified Financial Statements.W/O Encl ML20058K8491973-03-21021 March 1973 Forwards 1972 Annual Financial Rept & Certified Financial Statements.W/O Encls ML20090L6181972-07-21021 July 1972 Requests That All Future Correspondence Re Util Licenses Be Directed to Manager of Power Operations ML20127H6101972-06-27027 June 1972 Forwards Endorsements 51 & 52 to Nelia Policy NF-106 for Pathfinder Power Plant,Endorsement 10 to Nelia Policy NF-197 for Prairie Island Power Plant & Endorsement 22 to Nelia Policy NF-174 for Monticello Power Plant ML20058K8521972-03-0808 March 1972 Forwards 1971 Annual Financial Rept & Certified Financial Statements.W/O Encls ML20127G8701972-01-28028 January 1972 Forwards Endorsements 50,9 & 18 to Nelia Policies NF-106, NF-197 & NF-174,respectively ML20125D7871969-05-14014 May 1969 Forwards Amend 4 to License DPR-11,amending License in Entirety ML20125D7711968-12-17017 December 1968 Informs of Change 17 to License DPR-11,cutting & Rerouting Main Steam Line & Feedwater Line,Isolating Feedwater Heater, Replacing Another Feedwater Heater W/Deaerating Heater & Installing New Feedwater Line ML20125D7601968-10-0202 October 1968 Informs of Change 17 to License DPR-11,authorizing Installation of fossil-fueled Boilers to Supply Steam to Turbine & Removal of off-gas Holdup Tanks from Plant & Storage on Present Site ML20125D7361968-08-12012 August 1968 Informs of Change 16 to License DPR-11,authorizing Removal of Fuel from Reactor & Placement in Fuel Storage Pool & Postponement of Next Class a Containment Leak Rate Test Until Just Prior to Fuel Reloading ML20125D7061967-08-0909 August 1967 Informs of Change 15 to License DPR-11,permitting Storage of New Core II Boiler & Superheater Fuel Elements in New Fuel Storage Vault ML20125D6711967-05-26026 May 1967 Informs of Change 13 to License DPR-11,authorizing Deletion of Separate Requirements on Max Boiler Power Fraction & Min Recirculation Flow for Given Total Reactor Power & Incorporating Min Allowable Burnout Ratio Requirement ML20056B6341967-01-31031 January 1967 Requests Current Estimated Schedule of Withdrawals & Returns of SNM Including Enrichment Levels for Pathfinder Reactor Under License DPR-11 to Complete Forecast of SNM Requirements for FY68 & FY69 ML20125D5951966-09-27027 September 1966 Informs of Change 12 to License DPR-11,permitting Reactor Cooling Rates in Excess of 200 F/Hr During Power Escalation Program Up to Full Power & Use of Reactor Noise Analysis Technique in Lieu of Rod Oscillator Technique ML20125D5821966-05-11011 May 1966 Informs of Change 9 to License DPR-11,allowing Increase in Ramp Reactivity Addition Rates Under Certain Operating Conditions,Changing Shutdown Margin Verification Procedures & Permitting Other Minor Mods to Reactor Facility ML20125D5711966-05-10010 May 1966 Informs of Change 11 to License DPR-11,permitting Reactor Cooling Rates in Excess of 200 F/Hr During Initial Reactor Tests When Reactor Superheater Drained ML20125D5631966-04-29029 April 1966 Informs of Change 8 to License DPR-11,allowing Reactor Startup W/Min Startup Channel Neutron Count Rate of 1/3 Counts Per Second Under Certain Conditions ML20125D5591966-04-28028 April 1966 Informs of Change 10 to License DPR-11,changing Min Sensitivity of Intermediate Range Channels from 10(-9) Amps/ 75 Kw to 5 X 10(-11) amps/200 Kw,Due to Problems Achieving Required Sensitivity During Low Power Operation ML20125D5511965-12-20020 December 1965 Informs of Change 7 to License DPR-11,permitting Continued Operation of Reactor at Power Levels Up to 1 Mwt W/Containment Leak Rate Not to Exceed 0.2% Per Day at Test Pressure of 78 Psig ML20125D5341965-12-0202 December 1965 Forwards Amend 3,Change 6,authorizing Operation at steady- State Power Levels Up to Max of 190 Mwt.Safety Evaluation Encl ML20125D4181965-05-27027 May 1965 Informs of Change 5 to License DPR-11,increasing Max Reactivity Addition Rate During R&D Testing Program ML20125D4041965-03-0404 March 1965 Forwards Amend 2,Change 4,authorizing Receipt,Possession & Use of 32,000 Ci Antimony to Be Used in Four antimony- Beryllium Neutron Sources.Fr Notice & Hazards Analysis Encl ML20125D3641965-03-0404 March 1965 Informs of Change 3 to License DPR-11,allowing Rescheduling of Integrated Leakage Rate Testing of Reactor Bldg ML20125D2411964-07-24024 July 1964 Forwards Amend 1,Change 2 to License DPR-11,authorizing Receipt,Possession & Use of 224 G Pu Encapsulated as Two 1-Ci & Two 6-Ci Pu/Be Neutron Sources ML20125D2081964-03-12012 March 1964 Informs of Change 1 to License DPR-11,changing Range of Stack Gas Monitor from 5 to 4 Decades & Footnoting Third Sentence of Section 4.2.1.2,Page 4-4,to Indicate That Value May Be Exceeded During Pump Startup W/Reactor at 1 Mwt 1990-08-03
[Table view] Category:NRC TO UTILITY
MONTHYEARML20125D7871969-05-14014 May 1969 Forwards Amend 4 to License DPR-11,amending License in Entirety ML20125D7711968-12-17017 December 1968 Informs of Change 17 to License DPR-11,cutting & Rerouting Main Steam Line & Feedwater Line,Isolating Feedwater Heater, Replacing Another Feedwater Heater W/Deaerating Heater & Installing New Feedwater Line ML20125D7601968-10-0202 October 1968 Informs of Change 17 to License DPR-11,authorizing Installation of fossil-fueled Boilers to Supply Steam to Turbine & Removal of off-gas Holdup Tanks from Plant & Storage on Present Site ML20125D7361968-08-12012 August 1968 Informs of Change 16 to License DPR-11,authorizing Removal of Fuel from Reactor & Placement in Fuel Storage Pool & Postponement of Next Class a Containment Leak Rate Test Until Just Prior to Fuel Reloading ML20125D7061967-08-0909 August 1967 Informs of Change 15 to License DPR-11,permitting Storage of New Core II Boiler & Superheater Fuel Elements in New Fuel Storage Vault ML20125D6711967-05-26026 May 1967 Informs of Change 13 to License DPR-11,authorizing Deletion of Separate Requirements on Max Boiler Power Fraction & Min Recirculation Flow for Given Total Reactor Power & Incorporating Min Allowable Burnout Ratio Requirement ML20125D5951966-09-27027 September 1966 Informs of Change 12 to License DPR-11,permitting Reactor Cooling Rates in Excess of 200 F/Hr During Power Escalation Program Up to Full Power & Use of Reactor Noise Analysis Technique in Lieu of Rod Oscillator Technique ML20125D5821966-05-11011 May 1966 Informs of Change 9 to License DPR-11,allowing Increase in Ramp Reactivity Addition Rates Under Certain Operating Conditions,Changing Shutdown Margin Verification Procedures & Permitting Other Minor Mods to Reactor Facility ML20125D5711966-05-10010 May 1966 Informs of Change 11 to License DPR-11,permitting Reactor Cooling Rates in Excess of 200 F/Hr During Initial Reactor Tests When Reactor Superheater Drained ML20125D5631966-04-29029 April 1966 Informs of Change 8 to License DPR-11,allowing Reactor Startup W/Min Startup Channel Neutron Count Rate of 1/3 Counts Per Second Under Certain Conditions ML20125D5591966-04-28028 April 1966 Informs of Change 10 to License DPR-11,changing Min Sensitivity of Intermediate Range Channels from 10(-9) Amps/ 75 Kw to 5 X 10(-11) amps/200 Kw,Due to Problems Achieving Required Sensitivity During Low Power Operation ML20125D5511965-12-20020 December 1965 Informs of Change 7 to License DPR-11,permitting Continued Operation of Reactor at Power Levels Up to 1 Mwt W/Containment Leak Rate Not to Exceed 0.2% Per Day at Test Pressure of 78 Psig ML20125D5341965-12-0202 December 1965 Forwards Amend 3,Change 6,authorizing Operation at steady- State Power Levels Up to Max of 190 Mwt.Safety Evaluation Encl ML20125D4181965-05-27027 May 1965 Informs of Change 5 to License DPR-11,increasing Max Reactivity Addition Rate During R&D Testing Program ML20125D4041965-03-0404 March 1965 Forwards Amend 2,Change 4,authorizing Receipt,Possession & Use of 32,000 Ci Antimony to Be Used in Four antimony- Beryllium Neutron Sources.Fr Notice & Hazards Analysis Encl ML20125D3641965-03-0404 March 1965 Informs of Change 3 to License DPR-11,allowing Rescheduling of Integrated Leakage Rate Testing of Reactor Bldg ML20125D2411964-07-24024 July 1964 Forwards Amend 1,Change 2 to License DPR-11,authorizing Receipt,Possession & Use of 224 G Pu Encapsulated as Two 1-Ci & Two 6-Ci Pu/Be Neutron Sources ML20125D2081964-03-12012 March 1964 Informs of Change 1 to License DPR-11,changing Range of Stack Gas Monitor from 5 to 4 Decades & Footnoting Third Sentence of Section 4.2.1.2,Page 4-4,to Indicate That Value May Be Exceeded During Pump Startup W/Reactor at 1 Mwt 1969-05-14
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20245B4531989-06-0808 June 1989 Forwards Encl Listed Info on Decommissioned & Shutdown Reactors Requested During Discussions at Saxton on 890511 ML20125D1231985-02-14014 February 1985 Further Response to FOIA Request for Seven Categories of Documents Re Waste & Storage Disposal in South Dakota.Encl Documents Respond to Item 1 of Request.Search & Review of Remaining Documents Subj to Request Continuing ML20125D7871969-05-14014 May 1969 Forwards Amend 4 to License DPR-11,amending License in Entirety ML20125D7711968-12-17017 December 1968 Informs of Change 17 to License DPR-11,cutting & Rerouting Main Steam Line & Feedwater Line,Isolating Feedwater Heater, Replacing Another Feedwater Heater W/Deaerating Heater & Installing New Feedwater Line ML20125D7601968-10-0202 October 1968 Informs of Change 17 to License DPR-11,authorizing Installation of fossil-fueled Boilers to Supply Steam to Turbine & Removal of off-gas Holdup Tanks from Plant & Storage on Present Site ML20125D7361968-08-12012 August 1968 Informs of Change 16 to License DPR-11,authorizing Removal of Fuel from Reactor & Placement in Fuel Storage Pool & Postponement of Next Class a Containment Leak Rate Test Until Just Prior to Fuel Reloading ML20125D7061967-08-0909 August 1967 Informs of Change 15 to License DPR-11,permitting Storage of New Core II Boiler & Superheater Fuel Elements in New Fuel Storage Vault ML20125D6711967-05-26026 May 1967 Informs of Change 13 to License DPR-11,authorizing Deletion of Separate Requirements on Max Boiler Power Fraction & Min Recirculation Flow for Given Total Reactor Power & Incorporating Min Allowable Burnout Ratio Requirement ML20056B6341967-01-31031 January 1967 Requests Current Estimated Schedule of Withdrawals & Returns of SNM Including Enrichment Levels for Pathfinder Reactor Under License DPR-11 to Complete Forecast of SNM Requirements for FY68 & FY69 ML20125D5951966-09-27027 September 1966 Informs of Change 12 to License DPR-11,permitting Reactor Cooling Rates in Excess of 200 F/Hr During Power Escalation Program Up to Full Power & Use of Reactor Noise Analysis Technique in Lieu of Rod Oscillator Technique ML20125D5821966-05-11011 May 1966 Informs of Change 9 to License DPR-11,allowing Increase in Ramp Reactivity Addition Rates Under Certain Operating Conditions,Changing Shutdown Margin Verification Procedures & Permitting Other Minor Mods to Reactor Facility ML20125D5711966-05-10010 May 1966 Informs of Change 11 to License DPR-11,permitting Reactor Cooling Rates in Excess of 200 F/Hr During Initial Reactor Tests When Reactor Superheater Drained ML20125D5631966-04-29029 April 1966 Informs of Change 8 to License DPR-11,allowing Reactor Startup W/Min Startup Channel Neutron Count Rate of 1/3 Counts Per Second Under Certain Conditions ML20125D5591966-04-28028 April 1966 Informs of Change 10 to License DPR-11,changing Min Sensitivity of Intermediate Range Channels from 10(-9) Amps/ 75 Kw to 5 X 10(-11) amps/200 Kw,Due to Problems Achieving Required Sensitivity During Low Power Operation ML20125D5511965-12-20020 December 1965 Informs of Change 7 to License DPR-11,permitting Continued Operation of Reactor at Power Levels Up to 1 Mwt W/Containment Leak Rate Not to Exceed 0.2% Per Day at Test Pressure of 78 Psig ML20125D5341965-12-0202 December 1965 Forwards Amend 3,Change 6,authorizing Operation at steady- State Power Levels Up to Max of 190 Mwt.Safety Evaluation Encl ML20125D4181965-05-27027 May 1965 Informs of Change 5 to License DPR-11,increasing Max Reactivity Addition Rate During R&D Testing Program ML20125D4041965-03-0404 March 1965 Forwards Amend 2,Change 4,authorizing Receipt,Possession & Use of 32,000 Ci Antimony to Be Used in Four antimony- Beryllium Neutron Sources.Fr Notice & Hazards Analysis Encl ML20125D3641965-03-0404 March 1965 Informs of Change 3 to License DPR-11,allowing Rescheduling of Integrated Leakage Rate Testing of Reactor Bldg ML20125D2411964-07-24024 July 1964 Forwards Amend 1,Change 2 to License DPR-11,authorizing Receipt,Possession & Use of 224 G Pu Encapsulated as Two 1-Ci & Two 6-Ci Pu/Be Neutron Sources ML20125D2081964-03-12012 March 1964 Informs of Change 1 to License DPR-11,changing Range of Stack Gas Monitor from 5 to 4 Decades & Footnoting Third Sentence of Section 4.2.1.2,Page 4-4,to Indicate That Value May Be Exceeded During Pump Startup W/Reactor at 1 Mwt 1989-06-08
[Table view] |