ML20125D78714 May 1969Forwards Amend 4 to License DPR-11,amending License in Entirety
ML20125D77117 December 1968Informs of Change 17 to License DPR-11,cutting & Rerouting Main Steam Line & Feedwater Line,Isolating Feedwater Heater, Replacing Another Feedwater Heater W/Deaerating Heater & Installing New Feedwater Line
ML20125D7602 October 1968Informs of Change 17 to License DPR-11,authorizing Installation of fossil-fueled Boilers to Supply Steam to Turbine & Removal of off-gas Holdup Tanks from Plant & Storage on Present Site
ML20125D73612 August 1968Informs of Change 16 to License DPR-11,authorizing Removal of Fuel from Reactor & Placement in Fuel Storage Pool & Postponement of Next Class a Containment Leak Rate Test Until Just Prior to Fuel Reloading
ML20125D7069 August 1967Informs of Change 15 to License DPR-11,permitting Storage of New Core II Boiler & Superheater Fuel Elements in New Fuel Storage Vault
ML20125D67126 May 1967Informs of Change 13 to License DPR-11,authorizing Deletion of Separate Requirements on Max Boiler Power Fraction & Min Recirculation Flow for Given Total Reactor Power & Incorporating Min Allowable Burnout Ratio Requirement
ML20125D59527 September 1966Informs of Change 12 to License DPR-11,permitting Reactor Cooling Rates in Excess of 200 F/Hr During Power Escalation Program Up to Full Power & Use of Reactor Noise Analysis Technique in Lieu of Rod Oscillator Technique
ML20125D58211 May 1966Informs of Change 9 to License DPR-11,allowing Increase in Ramp Reactivity Addition Rates Under Certain Operating Conditions,Changing Shutdown Margin Verification Procedures & Permitting Other Minor Mods to Reactor FacilityShutdown Margin
ML20125D57110 May 1966Informs of Change 11 to License DPR-11,permitting Reactor Cooling Rates in Excess of 200 F/Hr During Initial Reactor Tests When Reactor Superheater Drained
ML20125D56329 April 1966Informs of Change 8 to License DPR-11,allowing Reactor Startup W/Min Startup Channel Neutron Count Rate of 1/3 Counts Per Second Under Certain Conditions
ML20125D55928 April 1966Informs of Change 10 to License DPR-11,changing Min Sensitivity of Intermediate Range Channels from 10(-9) Amps/ 75 Kw to 5 X 10(-11) amps/200 Kw,Due to Problems Achieving Required Sensitivity During Low Power Operation
ML20125D55120 December 1965Informs of Change 7 to License DPR-11,permitting Continued Operation of Reactor at Power Levels Up to 1 Mwt W/Containment Leak Rate Not to Exceed 0.2% Per Day at Test Pressure of 78 Psig
ML20125D5342 December 1965Forwards Amend 3,Change 6,authorizing Operation at steady- State Power Levels Up to Max of 190 Mwt.Safety Evaluation Encl
ML20125D41827 May 1965Informs of Change 5 to License DPR-11,increasing Max Reactivity Addition Rate During R&D Testing Program
ML20125D4044 March 1965Forwards Amend 2,Change 4,authorizing Receipt,Possession & Use of 32,000 Ci Antimony to Be Used in Four antimony- Beryllium Neutron Sources.Fr Notice & Hazards Analysis Encl
ML20125D3644 March 1965Informs of Change 3 to License DPR-11,allowing Rescheduling of Integrated Leakage Rate Testing of Reactor Bldg
ML20125D24124 July 1964Forwards Amend 1,Change 2 to License DPR-11,authorizing Receipt,Possession & Use of 224 G Pu Encapsulated as Two 1-Ci & Two 6-Ci Pu/Be Neutron Sources
ML20125D20812 March 1964Informs of Change 1 to License DPR-11,changing Range of Stack Gas Monitor from 5 to 4 Decades & Footnoting Third Sentence of Section 4.2.1.2,Page 4-4,to Indicate That Value May Be Exceeded During Pump Startup W/Reactor at 1 Mwt