ML20125D787 | 14 May 1969 | Forwards Amend 4 to License DPR-11,amending License in Entirety | |
ML20125D771 | 17 December 1968 | Informs of Change 17 to License DPR-11,cutting & Rerouting Main Steam Line & Feedwater Line,Isolating Feedwater Heater, Replacing Another Feedwater Heater W/Deaerating Heater & Installing New Feedwater Line | |
ML20125D760 | 2 October 1968 | Informs of Change 17 to License DPR-11,authorizing Installation of fossil-fueled Boilers to Supply Steam to Turbine & Removal of off-gas Holdup Tanks from Plant & Storage on Present Site | |
ML20125D736 | 12 August 1968 | Informs of Change 16 to License DPR-11,authorizing Removal of Fuel from Reactor & Placement in Fuel Storage Pool & Postponement of Next Class a Containment Leak Rate Test Until Just Prior to Fuel Reloading | |
ML20125D706 | 9 August 1967 | Informs of Change 15 to License DPR-11,permitting Storage of New Core II Boiler & Superheater Fuel Elements in New Fuel Storage Vault | |
ML20125D671 | 26 May 1967 | Informs of Change 13 to License DPR-11,authorizing Deletion of Separate Requirements on Max Boiler Power Fraction & Min Recirculation Flow for Given Total Reactor Power & Incorporating Min Allowable Burnout Ratio Requirement | |
ML20125D595 | 27 September 1966 | Informs of Change 12 to License DPR-11,permitting Reactor Cooling Rates in Excess of 200 F/Hr During Power Escalation Program Up to Full Power & Use of Reactor Noise Analysis Technique in Lieu of Rod Oscillator Technique | |
ML20125D582 | 11 May 1966 | Informs of Change 9 to License DPR-11,allowing Increase in Ramp Reactivity Addition Rates Under Certain Operating Conditions,Changing Shutdown Margin Verification Procedures & Permitting Other Minor Mods to Reactor Facility | Shutdown Margin |
ML20125D571 | 10 May 1966 | Informs of Change 11 to License DPR-11,permitting Reactor Cooling Rates in Excess of 200 F/Hr During Initial Reactor Tests When Reactor Superheater Drained | |
ML20125D563 | 29 April 1966 | Informs of Change 8 to License DPR-11,allowing Reactor Startup W/Min Startup Channel Neutron Count Rate of 1/3 Counts Per Second Under Certain Conditions | |
ML20125D559 | 28 April 1966 | Informs of Change 10 to License DPR-11,changing Min Sensitivity of Intermediate Range Channels from 10(-9) Amps/ 75 Kw to 5 X 10(-11) amps/200 Kw,Due to Problems Achieving Required Sensitivity During Low Power Operation | |
ML20125D551 | 20 December 1965 | Informs of Change 7 to License DPR-11,permitting Continued Operation of Reactor at Power Levels Up to 1 Mwt W/Containment Leak Rate Not to Exceed 0.2% Per Day at Test Pressure of 78 Psig | |
ML20125D534 | 2 December 1965 | Forwards Amend 3,Change 6,authorizing Operation at steady- State Power Levels Up to Max of 190 Mwt.Safety Evaluation Encl | |
ML20125D418 | 27 May 1965 | Informs of Change 5 to License DPR-11,increasing Max Reactivity Addition Rate During R&D Testing Program | |
ML20125D404 | 4 March 1965 | Forwards Amend 2,Change 4,authorizing Receipt,Possession & Use of 32,000 Ci Antimony to Be Used in Four antimony- Beryllium Neutron Sources.Fr Notice & Hazards Analysis Encl | |
ML20125D364 | 4 March 1965 | Informs of Change 3 to License DPR-11,allowing Rescheduling of Integrated Leakage Rate Testing of Reactor Bldg | |
ML20125D241 | 24 July 1964 | Forwards Amend 1,Change 2 to License DPR-11,authorizing Receipt,Possession & Use of 224 G Pu Encapsulated as Two 1-Ci & Two 6-Ci Pu/Be Neutron Sources | |
ML20125D208 | 12 March 1964 | Informs of Change 1 to License DPR-11,changing Range of Stack Gas Monitor from 5 to 4 Decades & Footnoting Third Sentence of Section 4.2.1.2,Page 4-4,to Indicate That Value May Be Exceeded During Pump Startup W/Reactor at 1 Mwt |