ML20125D758

From kanterella
Revision as of 21:25, 12 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1979
ML20125D758
Person / Time
Site: Pilgrim
Issue date: 01/07/1980
From: Gaffney C
BOSTON EDISON CO.
To:
Shared Package
ML20125D757 List:
References
NUDOCS 8001150504
Download: ML20125D758 (6)


Text

-

t i

9 g

. OPERATING DATA REPORT ,

DOC 1'ET NO. 50-293 DATE 1/07/80 CO. \

lPl.ETEQ isYoC.M.Gaffnev u- /.:. - / 900 TELEPllONE .

OPER AT!NG C.TATUS PILGRIM I Notes

1. Unit Name:

December, 1979

2. Reportin: Period:
3. Licensed Thermal Power (SIWt): 1998.
4. Nameplate Ra:ing (Gro's SIWE):

678.

S. Design Electrical Ratin;(Net SIWE):

655. .

6. Staximum Dependable Cap city (Gross.\1We):

690.

7. Staxituum DependhHe Capacity (Net 51We):

670.

8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7)Since Last Report. Give Reasons:

NONE

9. Power Level To Wh ch Restricted.lf Any (Net alwe):

NONE

10. Reasons For Restrictions.lf Any: -

N/A This 51ontil Yr..to Date . Cumulative c-

11. Ilours in Raporting Period. 744.0 8760.0 61896.0
12. Number Of Hours !<.caetor Was Critical 744.0 7933.2 44980.9 0.0 0.0 0.0
13. Reactor Resene Shutdown !!ours ~
14. Hmtrs Generator On.Line 744 .0 7829.9 43552.5
15. thiit Re:erve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Ene gy Generated (51WH) 1404960.0 14649312.0 73091112.0
17. Gross Electrical Ener;y Generated (51Wil) 483780.0 __. 5034360.0 24164834.0
18. Net Electrical Energy Generated (SIWH) 464639.0 4844559.0 23206123.0
19. Unit Service Factor 100.0 89.4 70.4
20. Unit Availability Factor 100.0 89.4 70,4 2!. Unit Capacity Facter (thing .\lDC Net) 93.2 82.5 56.0
22. Unit Capacity Factcr (thing DER Net) 95.3 84.4 57.2
23. Unit Forced Outage Rate 0.0 10.2 10.6
24. Shuhlowns Schedi.!cd Over Nest 6 Slonths (Type. Date, and Duration of Eachn REFUEL OUTAGE COMBENCING JANUARY 5.1900 TO APRIL 7. 1980.
25. If Shut Down At End Of Report Period.E. tim..ted Date o(Startup: UNIT OPERATING
h. Units in Tett Status t!'aior to Commercial Operationn . Forecast Achined INillAL CRITICA LITY INITIAL. CLECTRICITY ._

C05 tall:RCIAL OPERATION _

90023238 (4/77 )

soon so o

AVERAGE DAILY UNIT POhER LEVEL -

DOCKET NO. 293 UNIT PILGRIM I

'DATE 1/07/80 COMPLETED BY C.M.Gaffney TELEPl!ONE 617-746-7900 MONTil DECEMBER, 1979 .

DAY AVERACE D .I Y P VER LEVEL DAY AVERAGE D AILY POWER LEVEL (MWe Net)

I 350.

7 646.

558.

_~ is 530.

3 656.

19 514.

4 664. i

,0 653,

~

665. - I 5

33 636. l 664. -

6 ,, 635.  !

7 663.

' 23 630.

l 8 663.

24 629.

9 662.

25 626.

10 665.

26 624.

  • 11 663.

27 618.

g3-659.

33

~

621.

656* '

13 '

, 643. ,

648. ~

l 14 634. l 651, 30 --

l 630.,

15 31 16 604.

l l

l INSTRUCT 10.*is On t!ir fermst.hst the averait da:l> unit power !ese!in \!We Net for e::.s.

the nearest wnele me..uasi, . o 4a) in the 1

,,,,m i t

90023239 i i

REFUELING D7 FORMATION The following refueling information is included in the Monthly Report as requested in a letter to Mr. G. C. Andognini dated January 18, 1978:

For your convenience, the information supplied has been enumerated so that each number corresponds to equivalent notation utilized in the request.

1. The name of this facility is Pilgrim Nuclear Power Station, Docket No.

50-293.

2. Scheduled date for next Refueling Shutdown: January 1980
3. Scheduled date for restart following refueling: April 1980 4.
5. Due to their similarity, requests 4, 5 & 6 are responded to collectively.
6. The fuel, which is presently expected to be loaded during the next scheduled refueling outage, is of the new P8x8R design, consisting of approximately 64 P8DRB282 assemblies and 120 P8DRB265 assemblies. The licensing submittal and proposed Technical Specification changes are expected to be submitted on or about December 21, 1979.
7. (a) There are 580 fuel assemblies in the core.

(b) There are 580 fuel assemblies in the spent fuel pool.

8. (a) The station is presently licensed to store 2320 spent fuel assemblies.

The actual spent fuel storage capacity is 1770 fuel assemblies at present.

(b) The planned spent fuel storage capacity is 2320 fuel assemblies

9. With present spent fuel in storage, the spent fuel pool now has the capacity to accommodate an additional 1190 fuel assemblies.

2 90023240

BOSTON EDISON COMPANY PILGRIM NUCLEAR POWER STATION Summarv of Operations for December, 1979 On December 1, the power was reduced to 50% for about 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to backwash the main condenser and to check for air in-leakage to the condenser. During this period, power was reduced to 15% for a short time due to ' vacuum problems.

Power was increased to 80% on 12/2/79 at 0800 and reached 100% power at 0800 on 12/3/79. Maintained 100% power until 12/11/79 when we started "coas t down" . Power decreased about 1% per day.

On 12/16/79, power was reduced and a control rod adjustment was made and power was returned to 98%. A recire. pump was tripped on 12/18/79 due to cable tray work, which caused a power reduction to about 60%. During this time, some miscellaneous repairs were made to 'B' R.F.P.

Power was increased to 100% on 12/20/79, but failed to stay at 100% due to end of life "coas t-down" . Power continued to reduce to 93% on 12/28/79.

Removed the 1st point heaters f rom service and the power level was 96% on 12/31/79.

The plant availability for the month was 100%. The Plant capacity factor for the month was 93.2%. The 1979 availability was 89.3%. The 1979 capacity factor was 82.55%.

The capacity factor for December was 93.2% due to the fact that power had to be reduced for condenser work.

90023241 l

DOCKET NO.

50-293 UNil'SilulDOWNS AND POWER REDUCI10NS PILCRIM I UNIT N AME I) ATE 1/07/80 COMPLETED ay C.M.Gaffney REPORT MON 111 DECEMBER, 1979 617-746-7900 TELEPl!ONE

-  : c

, .$ E gg 3 $ $i 1 icensee @, $4 Cause & Curiective No. D.sie Q @ jg5 Evens u '9 Q gu Action to t--

$E 5 55c Repost # AG Paesent Recunence e g u O

19 79/11/01 S 0.0 B 4 Condenser backwash and leak check.

20 79/11/18 F 0.0 11 4 'B' recire. M. G. set tripped due to fault in cable.

I 2 3 4 12: l'os ced Reason: Method: Exhibit G -Insieuctions a S: Siheduled A-Equipment Failure (Explain) 1-Manual for Pseparation of Data g 11-Maintenance ci Tess 2-Manual Scrain. Enisy Sheets for Iiceusee C-Refueling 3- Automatic Ses am. Event Repose ll.ERII ile INilRI.G-O D-Regulaieny Resisiction 4 Other (Explain) 01611 li Operator Training & license Examination U F-Adminisisative 5 N G Operational En ros (lixplain) INiubit I - Same Sonice A 19/17) 11 Other (Explain t IM

i D o > .1 1 1

D -_

E T L 3

A I 0 . .

9 /

7 C 0 9 O 5 1 S 0 S -

A 9 r 7 e l b

m e

c

  • e D

r Ne h Oe t I r n Tn d o Cn e M Ay v r e a .

Er p D Vp e I r TT p Cn Ee e Rr t b Rr Oo o Cp t n t r r o

p e -

R t

l E l d N C ue O N bl I A E el T N C rat A E N T T A & s S N l l

n E ti I

R A T u E M l rr -

l l

I t e l sb 0 D A b P E T

M wu en R A ns A L E E L R n C o U Y i .

1 1 T nt a E i a E g .

M F ri I A S et R S U d s G A ne .

L R C uv I O P I g.

N O

I T t C u N r t

U s F

L t A n M e B

1 T 3 N

E r3 N e -

. O b3 P

eooN VN"u M b2 O u-nS C SS I

3 D 2 T

S

' h Iii  ; i! l- 9'