Notice of Deviation from Insp on 850325-29
ML20127K858
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/11/1985
From: Miller L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML20127K837 List:
References
50-530-85-09, 50-530-85-9, NUDOCS 8506270622
Download: ML20127K858 (1)


Text

. .- ,

~

c

.- APPENDIX B NOTICE OF DEVIATION i

Arizona Nuclear Power Project ' Docket No. 50-530

' Post Office Box 52034 Construction Permit No. 143 Phoenix, Arizona, 85072-2034 Based on the results of an NRC inspection conducted on site during the period March 25-29, 1985, and in accordance with NRC Enforcement Policy, 10 CFR Part 2, Appendix C, it appears that certain of your activities were not conducted in conformance with your approved design as indicated below:

1. The Palo Verde FSAR in Table 3.2-1, " Quality Classification of Struc-tures, Systems and Components",-lists the quality assurance classifica-tion for new fuel racks as being Quality Class Q.and Seismic Category I.

Additionally, page 3.2-37, note No. 4, of the FSAR states that Quality Assurance Class, (Q), requires compliance with 10 CFR 50, Appendix B.

Contrary to.the above, under its contract with Bechtel Corporation, the licensee's prime contractor, Combustion Engineering procured new fuel racks from a subvendor, Joseph Oat Corporation, under Combustion Engin-eering Specification No. 00000-WQC-5.1, " Vendor Quality Control Program

' Specification for PSG Quality Class 2A". Items designated by Combustion

' Engineering as Class 2A do not have a Quality Assurance Program applied which provides for compliance with 10 CFR 50 Appendix B.

2. Contrary to the current approved design of drawing 13-E-ZAC-043 Revision 17 and Design Change Package 3CC-ZJ-038, a vertical member of cable tray hanger No. H106 in the Unit 3 lower cable spreading room is not located

.within one inch of the structural steel center line and was not identi-fied nor analyzed as required by the Design Change Package.

You are hereby requested to submit to this office within thirty days of the

'date of this notice, a written statement or explanation regarding the above deviations, describing corrective steps taken, the results achieved (or corrective steps that are planned), and the date when corrective action will be completed.

JUN 111985 Date L.UF. Miller, r , Chief Reactor Proj Section No. 2 8506270622 850611 PDR ADDCK 05000529 G PDR

.