Notice of Deviation from Insp on 921215-930119.Deviation: 14 People in Listed Job Codes Did Not Have Bachelor of Science Degree in Engineering
ML20034H835
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/26/1993
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML20034H821 List:
References
50-528-92-43, 50-529-92-43, 50-530-92-43, NUDOCS 9303220132
Download: ML20034H835 (1)


Text

7.-

i NOTICE OF DEVIATION Arizona Public Service Co.

Docket Nos. 50-528, 50-529, and 50-530 Palo Verde Units 1, 2, and 3 License Nos. NPF-41, NPF-51, and NPF-74 i

During an NRC inspection conducted on December 15, 1992 through January 19, 1993, one deviation of your Updated Final Safety Analysis Report (UFSAR) was identi fied.

In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C, the deviation is listed below:

Section 13.1.1.3 of the UFSAR states:

"The education and experience qualification requirements for management and technical' support organization engineering staff are established in PVNGS [Palo Verde Nuclear Generating Station] position descriptions.

PVNGS position descriptions are developed using the guidance of ANSI 3.1-1978."-

PVNGS position descriptions for job codes 43004, 43004, 40516, 40517, 40754, 40767, and 40777 all require a Bachelor of Science degree in engineering.

Contrary to the above,14 people in the above job codes did not have a Bachelor of Science degree in engineering.

Please provide to the U.S. Nuclear Regulatory Commission, ATTN: Document i

Control Desk, Washington, D.C.

20555, with a copy to the Regional Administrator, Region V, and a copy to the NRC Resident Inspector at Palo Verde, in writing within 30 days of the date of this Notice, the reason (s)'for i

the deviation, the corrective steps which have been taken and the results achieved, the corrective steps which will be taken to avoid further deviations, and the date when your corrective action will be completed. Where good cause is shown, considerations will be given to extending the response time.

Dated at Walnut Creek, California this n.usday of February 1993.

I h

I I

9303220132 930226 PDR AIKFCK 05000528 O

PDR