ML20128A882

From kanterella
Revision as of 05:05, 9 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Comments on Proposed App B TS
ML20128A882
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 05/04/1978
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Higginbotham L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20128A873 List:
References
NUDOCS 9212030487
Download: ML20128A882 (3)


Text

_ _ . - _ _ - _ _ _ _ - - - _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . .__

  • n, y, A' )2 pF
  • dog UNtit0 $1 Af tS

/  %, NUCLE AR REGULATORY COMMIS$10N O g, s (

( HIGloNIll

'5 E *DOO5tvtLTROAD 0, + - ! CL t N (LLYN, IL LIN0l$ 60137

% ,6 - /

          • May 4, 1978 MEMORANDUM FOR: L. B. liigginbotham, Annistant Director, Division of Fuci Facilitics and Materials Safety Inspection, IE FROM: A. B. Davis, Chief, Fuel Facility and Materials Safety Branch

SUBJECT:

PROPOSED APPENDIX B TECHNICAL SPECIFICATION. i REVIEW - MONTICELLO We have reviewed the Proposed Environmental Technical Specifications Appendix B to Facility Operating License DPR-22 and have attached our comments. Please transmit these comments to Singh Bajawa, Project

- Manager,Env[roi$mentalProjectsBranch2,DSE.

hl '

A. B. Davis, Chief Fuel Facility and Fbterials Safety Branch

Attachment:

Comments

(

l

^

.P.

?!A"foEUS8She

  • _.-. .. ...-...a _

i

. i t

1.  : Draft Appendix B Proposed Technical Specffications Page 1 - Add the following definitions: i

?

Monthly: Once during each calendar month at intervals of 30 days plus or minus 6 days. j Quarterly Once during each successive three month.

period of the calendar year, counting from January 1, at intervals of 13 weeks plus or minus 14 days.  !

Semimonthly: Twice during each calendar month at intervals of 15 days plus or minus 4 days.

~

Page 6, Section 3.1.1, Specification - Adt the following to the =i first paragraphs Th; following parameters are to be measured monthly:

(Use the list.on the first page of the Program Description Document)

Basis - Delete 'tita following from the first paragraphs i

Parameters such . . . Sulfates.

Page 7, Section 3.1.2 Specification - Add to the parar,raphs t

f Creel studies shall be conducted to determine estimates of ' angler pressure _ and harvest. These ,

studies shall be-conducted in accordance with the J appropriate schedule of the Program Description-

. Document.

Page 11 Section S.3.2 --Define " periodic audits":. . . in a finite time.but no less frequent than annually.

Page 12, Section 5.4.2,-paragraph.2,. sentence 2 -LI disagree with '

. . . without prior NRC review" . . .

Page 13, Section 5.5.1' " . . . by Aug 1 of each year." is not'a  :

timely report. With the program as small as this is l by April 1 of each year should present'no problem.

Section 5.5.2. sentence.2 ". . . in a timely manner."

should be a statement that is specific in time or consistent with NPDES reporting requirement. ,

a-r,-.-= e ~ , , ,-e , - - ,~v-- ,-w-- , - - - y,- n y-- , wuc w v r 4-- w- w.r eg- w

,a , . ' . ; I

}

I

-f ,

II. Draft Program Description Document +

Water Quality - Specify a uniform depth for each station.- -

Temperature Surveys - Change "once every three months" to quarterly.

Electroffshing Surveys - paragraph 3 - Are the paired shocking runs ,

for the entire shoreline of each Sector? If not, a definite i length run should be specified1for consistency. i Seining Studies - change bimonthly to semimonthly. r

- paragraph 3 - Are all captured fish voucher.

specimens? If not, what is the_ criteria?

Reporting - August 1 is not timely. See comment re Page 13, Section 5.5.1.

1 1

0

,1

...---.....mm,.,,-.., . - . . .- .. .

. , - -..,..,..,--#_.--,-. .,,v. . -

r-_.... .-- .. . i