Forwards Comments on Proposed App B TS
ML20128A882
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 05/04/1978
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Higginbotham L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20128A873 List:
References
NUDOCS 9212030487
Download: ML20128A882 (3)


Text

_ _. - _ _ - _ _ _ _ - - - _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

n, A'

y,

)2 pF

  • dog UNtit0 $1 Af tS

/

NUCLE AR REGULATORY COMMIS$10N

'5

g, s (

(

HIGloNIll O

E

  • DOO5tvtLTROAD CL t N (LLYN, IL LIN0l$ 60137

%,6 - /

0,

+

May 4, 1978 MEMORANDUM FOR:

L. B. liigginbotham, Annistant Director, Division of Fuci Facilitics and Materials Safety Inspection, IE FROM:

A. B. Davis, Chief, Fuel Facility and Materials Safety Branch

SUBJECT:

PROPOSED APPENDIX B TECHNICAL SPECIFICATION.

i REVIEW - MONTICELLO We have reviewed the Proposed Environmental Technical Specifications Appendix B to Facility Operating License DPR-22 and have attached our comments.

Please transmit these comments to Singh Bajawa, Project Manager,Env[roi$mentalProjectsBranch2,DSE.

hl A. B. Davis, Chief Fuel Facility and Fbterials Safety Branch

Attachment:

Comments

(

l

^

?!A"foEUS8She

.P.

...-...a

i i

t Draft Appendix B Proposed Technical Specffications 1.

Add the following definitions:

i Page 1

?

Monthly:

Once during each calendar month at intervals of 30 days plus or minus 6 days.

j Quarterly Once during each successive three month.

period of the calendar year, counting from January 1, at intervals of 13 weeks plus or minus 14 days.

Semimonthly: Twice during each calendar month at intervals of 15 days plus or minus 4 days.

Page 6, Section 3.1.1, Specification - Adt the following to the

= i

~

first paragraphs Th; following parameters are to be measured monthly:

(Use the list.on the first page of the Program Description Document)

Basis - Delete 'tita following from the first paragraphs i

Parameters such... Sulfates.

Page 7, Section 3.1.2 Specification - Add to the parar,raphs t

f Creel studies shall be conducted to determine estimates of ' angler pressure _ and harvest. These studies shall be-conducted in accordance with the J

appropriate schedule of the Program Description-

. Document.

Page 11 Section S.3.2 --Define " periodic audits":... in a finite time.but no less frequent than annually.

Page 12, Section 5.4.2,-paragraph.2,. sentence 2 -LI disagree with without prior NRC review"...

Page 13, Section 5.5.1'

"... by Aug 1 of each year." is not'a timely report. With the program as small as this is l

by April 1 of each year should present'no problem.

Section 5.5.2. sentence.2

"... in a timely manner."

should be a statement that is specific in time or consistent with NPDES reporting requirement.

c-a ve c wa a-r,-.-=

e ~,,

,-e

,~v--

,-w--

y,-

n y--

wuc w

v r

4--

w-w.r eg-w

I a

}

I

-f II.

Draft Program Description Document

+

Water Quality - Specify a uniform depth for each station.-

Temperature Surveys - Change "once every three months" to quarterly.

Electroffshing Surveys - paragraph 3 - Are the paired shocking runs for the entire shoreline of each Sector? If not, a definite i

length run should be specified1for consistency.

i Seining Studies - change bimonthly to semimonthly.

r

- paragraph 3 - Are all captured fish voucher.

specimens? If not, what is the_ criteria?

Reporting - August 1 is not timely.

See comment re Page 13, Section 5.5.1.