ML20134E661

From kanterella
Revision as of 15:37, 2 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of Significant Licensee Meeting 85-82 on 850827 W/Util in King of Prussia,Pa,To Discuss Failures to Declare Equipment Inoperable Following Surveillance Testing & Uncontrolled Openings in Vital Area Barrier
ML20134E661
Person / Time
Site: Pilgrim
Issue date: 08/14/1985
From: Lester Tripp
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8508200365
Download: ML20134E661 (2)


Text

-

71, MG 141985 U.S. NUCLEAR REGULATORY COMMISSION No. 85-82 REGION I NOTICE OF SIGNIFICANT LICENSEE MEETING Licensee: Boston Etaison Company facility: Pilgrim Nuclear Power Station Docket No.: 50-293 Time and Date: 10:00 a.m., August 27, 1985 (Main Conference Room)

Location: NRC Region I Office, King of Prussia, Pennsylvania

Purpose:

Enforcement Conference to Olscuss Failures to Declare Equip-ment Inoperable following Surveillance Testing and Uncontrolled Openings in Vital Area Barrier NRC Attendees: T. E. Murley, Regional Administrator T. T. Martin, Director, Division of Radiation Safety and Safeguards (DRSS)

R. W. Starostecki, Director, Olvision of Reactor Projects (DRP)

E. C. Wenzinger, Chief, Projects Branch No. 3, ORP J. H. Joyner, Chief, Nuclear Materials Safety and Safeguards Branch OR$S L.E.Trlpp, Chief,ReactorProjectsSection3A,DRP R. R. Keimig, Chief, Safeguards Section, DRSS G. C. Smith, Safeguards Inspector, DRSS M. M. McBride, Resident Inspector Licensee Attendees: W. D. llarrington, Senior Vice President, Nuclear A. L. Oxsen, Vice President, Nuclear Operations E. Ziemlanski, Manager, Nucleer Operations Support Note: Attendance by NRC persunnel at this meeting should be made known by 4:00 p.m., August 26, 1985 via telephone call to L. Tripp, Region I, at FTS 8 488 1221, vr4ganal filsned pg Prepared by I S /a / k d L. frfpp, C1 MeDRP f )

ef, RP5 3Af Olstribution:

WIT 11am J 7 trcks Executive Ofrector for Operations Victor Stello, Jr., Deputy Executive Of rector for Regional Operations and Generic Requirements Richard C. DeYoung, Director, Office of Inspection and Enforcement Jane Axelrad, Ofrector, Enforcement Staff, it J. Liebermand, Director and Chief Counsel, Regional Operations and Enforcement Olvision,OLLO P. Leech, Licensing Project Manager G. Lainas A D.Vassallo,ssistantOlrector Chief, ORB 2, NRR Public Document Room (POR) local Public Document Room (LPOR)

.g-gel

. __ to .

, k 2

AUG 141985 bec:

Regional Administrator Deputy Regional Administrator Division Directors Branch Chiefs (

Region I Receptionist l Public Affairs Officer DRMA Files S. Fiveash, DRS i

i l

l l

l l

RI:DRP RI:DRP MW 4W/v Walton/meo Tripp 8/13/85 0FFICIAL RECORD COPY

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _