|
---|
Category:SAFETY EVALUATION REPORT--LICENSING & RELATED ISSUES
MONTHYEARML20212F5641999-09-23023 September 1999 SER Concluding That All of ampacity-related Concerns Have Been Resolved & Licensee Provided Adequate Technical Basis to Assure That All of Thermo-Lag Fire Barrier Encl Cables Operating within Acceptable Ampacity Limits ML20196K4981999-07-0101 July 1999 Safety Evaluation Authorizing PRR-E12-01,PRR-E21-01, PRR-P75-01,PRR-P81-01,VRR-B21-01,VRR-B21-02,VRR-E38-01 & VRR-E51-01.Concludes That Alternatives Proposed by EOI Acceptable ML20195C4841998-11-0606 November 1998 SER Accepting QA Program Change to Consolidate Four Existing QA Programs for Arkansas Nuclear One,Grand Gulf Nuclear Station,River Bend Station & Waterford 3 Steam Electric Station Into Single QA Program ML20217Q6701998-05-0606 May 1998 SER Approving Proposed Postponement of Beginning Augmented Exam Requirements of 10CFR50.55a(g)(6)(ii)(A)(2) at Grand Gulf for Circumferential Shell Welds for Two Operating Cycles ML20217P8281998-04-0707 April 1998 Safety Evaluation Accepting Relief Authorization for Alternative to Requirements of ASME Section Xi,Subarticle IWA-5250 Bolting Exam for Plants,Per 10CFR50.55a(a)(3)(i) ML20217P0381998-04-0606 April 1998 Safety Evaluation Supporting Amend 135 to License NPF-29 ML20216J4211998-03-18018 March 1998 SER Approving Alternative to Insp of Reactor Pressure Vessel Circumferential Welds for Grand Gulf Nuclear Station ML20199H3711997-11-19019 November 1997 SER Accepting Approving Request Relief from Requirements of Section XI, Rule for Inservice Insp of NPP Components, of ASME for Current or New 10-year Inservice Insp Interval IAW 50.55(a)(3)(i) of 10CFR50 ML20199F3431997-11-18018 November 1997 SER Accepting Rev 15 of Operational Quality Assurance Manual for Grand Gulf Nuclear Station,Unit 1 ML20216E9921997-09-0404 September 1997 Safety Evaluation Accepting 970623 Request for Relief Re Authorization for Use of ASME Code Case N-416-1 & N-532,ISI Program for Listed Plants ML20134C5671997-01-30030 January 1997 SER Denying Request for Exemption from 10CFR50.55a Entergy Operating,Inc Et Al,Grand Gulf Nuclear Station,Unit 1 ML20149M4221996-12-12012 December 1996 Safety Evaluation Supporting Update Insvc Insp Programs to 1992 & Portions of 1993 ASME Boiler & Pressure Vessel Code, Sect XI for Licenses DPR-51,NPF-6,NPF-38,NPF-29 & NPF-47. Technical Ltr Rept Encl ML20138B5681996-12-11011 December 1996 Safety Evaluation Re Emergency Plan Change 28.001-95 to Entergy Operations,Inc,Grand Gulf Nuclear Station ML20134K5321996-11-18018 November 1996 Safety Evaluation Supporting Request for Relief Re 10CFR50.55a Inservice Testing of Main Steam Safety/Relief Valves for License NPF-29 ML20129D0441996-10-22022 October 1996 Safety Evaluation Supporting Request for Relief I-00014 ML20129B8751996-10-18018 October 1996 Safety Evaluation Accepting First 10-year Interval ISI Program Plan Addl Request for Relief ML20128H2491996-10-0707 October 1996 Safety Evaluation Authorizing Licensee Proposed Alternative to Use ASME Code Case N-508-1 for Rotation of Serviced Snubbers & Pressure Relief Valves for Sole Purpose of Testing in Lieu of ASME Requirements ML20107F5611996-04-17017 April 1996 Safety Evaluation Providing Guidance on Submitting plant- Specific Info W/Respect to IST Program Alternatives Request ML20128N1381993-02-17017 February 1993 Safety Evaluation Accepting Proposal to Raise Design Ground Water Level from 109 Ft Above Msl to 114.5 Ft Above Msl ML20058B4411990-10-25025 October 1990 Safety Evaluation Granting 900709 Request for Relief from Requirements for Leakage Testing of RCS in ASME Code,Section XI ML20062A1941990-10-16016 October 1990 Safety Evaluation Granting Relief Request from Inservice Insp Requirements ML20059N4971990-10-0101 October 1990 Safety Evaluation Accepting Util Response to Generic Ltr 88-01,w/listed Exceptions ML20058N3941990-08-0606 August 1990 Generic SER Re Mark III Containment Hydrogen Control, Concluding That HGN-112-NP, Generic Hydrogen Control Info for BWR-6 Mark III Containments Provides Acceptable Basis for Technical Resolution of Degraded Core Hydrogen Issue ML20055G5271990-07-18018 July 1990 Safety Evaluation Re Facility Procedures Generation Package. Util Needs to Revise Package to Address Programmatic Improvements Identified ML20055F9081990-07-16016 July 1990 Safety Evaluation Accepting Criticality Analysis for Cycle 5 Fuel in Spent Fuel Storage Racks ML20055G0341990-07-16016 July 1990 Safety Evaluation Re Boraflex Gaps in Spent Fuel Racks. Storage Racks Can Safely Accomodate Max Reactivity of Unit 1 Cycle 1 Through Cycle 4 Fuel.Storage Rack Surveillance Program Acceptable for long-term Storage of Spent Fuel ML20246D8021989-08-21021 August 1989 Safety Evaluation Granting 880524 Requests for Relief from Certain Requirements of ASME Code,Section XI ML20246B6311989-08-17017 August 1989 Safety Evaluation Supporting Amend 25 to License NPF-62 ML20247G7041989-07-21021 July 1989 SER Accepting Licensee Commitment to Install ex-core Neutron Flux Monitoring Instrumentation Meeting Requirements of Reg Guide 1.97,Rev 2,prior to Restart Following Fourth Refueling Outage ML20245A8251989-04-17017 April 1989 SER Re Proposed Changes to Administrative Controls Section of Tech Specs Concerning Min Shift Crew Composition,Unit Staff Qualifications,Training,Plant Safety Review Committee & Safety Review Committee Composition.Changes Unacceptable ML20244D5291989-04-14014 April 1989 Safety Evaluation Supporting Util Actions in Response to Generic Ltr 83-28,Position 4.5.2, Testing of Reactor Trip Sys. Justification for Not Testing Reactor Mode Switch or Backup Scram Valves Provided ML20248J9001989-04-0505 April 1989 Safety Evaluation Accepting Licensee Statements Confirming That Vendor Interface Program Exists W/Nsss Vendor for Components Required for Performance of Reactor Trip Function ML20151P0291988-08-0505 August 1988 Safety Evaluation Supporting Generic Ltr 83-28,Position 4.5.1 Re on-line Testing of Reactor Trip Sys ML20234D9021987-12-30030 December 1987 Safety Evaluation Supporting 870612,0814,1026 & 1119 Relief Requests from First 10-yr Interval Inservice Insp Program Requirements of Section XI of ASME Code ML20149E7091987-12-30030 December 1987 Safety Evaluation Supporting Amend 41 to License NPF-29 ML20234C7671987-12-23023 December 1987 Safety Evaluation Granting 870612,0814,1026 & 1119 Requests for Relief from Certain Section XI ASME Code Requirements Re First 10-yr Interval Inservice Insp Program ML20236B1021987-10-15015 October 1987 Safety Evaluation of 870630 Submittal Supplemented on 870821 & 0911 Re Deferral of Certain Insps of Tdi Div II Emergency Diesel Generators.Deferral of Certain Design Review & Quality Revalidation Baseline Insps Approved ML20235V1701987-10-0707 October 1987 Safety Evaluation Re 861022 Rev 2 to Process Control Program (PCP) for Processing & Packaging of Wet Radwastes.Pcp Acceptable ML20234A9471987-09-0404 September 1987 Safety Evaluation Re Util 870702 Submittal Re Containment Isolation for Various Instrument Lines.Util Proposed Alternate Basis to Meet GDC 55 to 10CFR50 App a Acceptable ML20237H1711987-08-21021 August 1987 Safety Evaluation Supporting Util 851014,870403 & 870622 Submittals Providing Info Re ATWS-related Design Features, Alternate Rod Injection,Standby Liquid Control Sys & Recirculation Pump Trip ML20236M3841987-07-31031 July 1987 Safety Evaluation on Generic Ltr 83-28,Items 3.1.1,3.1.2, 3.2.1 & 3.2.2 Re post-maint Testing.Licensee Programmatic Controls & Procedures for post-maint Testing of Components in Reactor Trip & safety-related Sys Acceptable ML20215J1351987-05-0404 May 1987 Safety Evaluation Re Spill of Sulphuric Acid at Plant on 860322.Licensee Monitoring & Recovery Sys Adequate to Contain & Eliminate Existing Acid Plume.No Addl Measures Recommended ML20210C3391987-04-30030 April 1987 Safety Evaluation Accepting Licensee 870129 Proposed Solution to Concern Re Control of Activities within Exclusion Areas ML20204J1451987-03-23023 March 1987 SER Supporting Licensee Responses to Humphrey Concerns on Safety of Mark III Containment Design ML20207R1051987-03-0505 March 1987 Safety Evaluation Supporting Util 861125 Rept on Conformance to Reg Guide 1.133,Rev 1, Loose-Part Detection Program for ...Sys of Light Water Cooled Reactors. License Condition 2.C(14) Adequately Addressed ML20212M3861987-03-0404 March 1987 Safety Evaluation Accepting Util 861223 Response to IE Bulletin 79-26, Boron Loss from BWR Control Blades, Per License Condition 2.C.(12) ML20212G3421987-01-12012 January 1987 Safety Evaluation Accepting Util 850228 & 860214 Submittals on Conformance to Reg Guide 1.97,Rev 2 ML20207N2761987-01-12012 January 1987 SER Supporting License Condition 2.C.(17) Which Replaces Check Valve Disc in Train B Feedwater Line Into Which Cold Water from Condensate Storage Tank Injected by RCIC ML20211P3901986-12-12012 December 1986 SER Supporting Util 860825 Request for Rev to Relief Request I-00007 Seeking Relief from Surface Exam for Welds within Flued Heads & Guard Pipes ML20214W8161986-12-0808 December 1986 Safety Evaluation Granting Util 861015 Request for Release from Commitment to Compare Performance of on-line Instrumentation Vs Grab Sampling Techniques 1999-09-23
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217F9921999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20212F5641999-09-23023 September 1999 SER Concluding That All of ampacity-related Concerns Have Been Resolved & Licensee Provided Adequate Technical Basis to Assure That All of Thermo-Lag Fire Barrier Encl Cables Operating within Acceptable Ampacity Limits ML20211Q3171999-09-0909 September 1999 Safety Evaluation Accepting BWROG Rept, Prediction of Onset of Fission Gas Release from Fuel in Generic BWR, Dtd July 1996 ML20216E4881999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Grand Gulf Nuclear Station.With ML20211A6921999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20209J1961999-07-12012 July 1999 Special Rept 99-001:on 990528,smoke Detectors Failed to Alarm During Performance of Routine Channel Functional Testing.Applicable TRM Interim Compensatory Measure of Establishing Roving Hourly Fire Patrol Was Implemented ML20196K4981999-07-0101 July 1999 Safety Evaluation Authorizing PRR-E12-01,PRR-E21-01, PRR-P75-01,PRR-P81-01,VRR-B21-01,VRR-B21-02,VRR-E38-01 & VRR-E51-01.Concludes That Alternatives Proposed by EOI Acceptable ML20209G0691999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20196A1161999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Grand Gulf Nuclear Station.With ML20206Q4831999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Grand Gulf Nuclear Station Unit 1.With ML20206J1201999-04-30030 April 1999 Redacted ME-98-001-00, Pressure Locking & Thermal Binding Test Program on Two Gate Valves with Limitorque Actuators ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20205P8771999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results ML20207K5141999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20206T7991999-01-31031 January 1999 Iodine Revolatizitation in Grand Gulf Loca ML20207A8301998-12-31031 December 1998 1998 Annual Operating Rept for Ggns,Unit 1 ML20206R9501998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Grand Gulf Nuclear Station,Unit 1.With ML20206D7721998-12-31031 December 1998 South Mississippi Electric Power Association 1998 Annual Rept ML20198E2481998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Grand Gulf Nuclear Station,Unit 1.With ML20195F4121998-11-13013 November 1998 Rev 16 to GGNS-TOP-1A, Operational QA Manual (Oqam) ML20195C4841998-11-0606 November 1998 SER Accepting QA Program Change to Consolidate Four Existing QA Programs for Arkansas Nuclear One,Grand Gulf Nuclear Station,River Bend Station & Waterford 3 Steam Electric Station Into Single QA Program ML20195C2791998-11-0505 November 1998 BWR Feedwater Nozzle Inservice Insp Summary Rept for GGNS, NUREG-0619-00006 ML20195F4801998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Grand Gulf Nuclear Station,Unit 1.With ML20155C1351998-10-26026 October 1998 Rev B to Entergy QA Program Manual ML20154K2391998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Grand Gulf Nuclear Station Unit 1.With ML20155F1961998-09-0101 September 1998 Engineering Rept for Evaluation of BWR CR Drive Mounting Flange Cap Screw ML20153B2161998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Grand Gulf Nuclear Station,Unit 1.With ML20237B6661998-07-31031 July 1998 Monthly Operating Rept for Jul 1998 for Grand Gulf Nuclear Station,Unit 1 ML20236R0231998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Grand Gulf Nuclear Station,Unit 1 ML20155J0811998-05-31031 May 1998 10CFR50.59 SE for Period Jan 1997 - May 1998 ML20249B1251998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Grand Gulf Nuclear Station,Unit 1 ML20248B6261998-05-11011 May 1998 Rev 6 to Grand Gulf Nuclear Station COLR Safety-Related ML20217Q6701998-05-0606 May 1998 SER Approving Proposed Postponement of Beginning Augmented Exam Requirements of 10CFR50.55a(g)(6)(ii)(A)(2) at Grand Gulf for Circumferential Shell Welds for Two Operating Cycles ML20206J1271998-04-30030 April 1998 Pressure Locking Thrust Evaluation Methodology for Flexible Wedge Gate Valves ML20247F3591998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Grand Gulf Nuclear Plant,Unit 1 ML20217M8951998-04-30030 April 1998 QA Program Manual ML20217P8281998-04-0707 April 1998 Safety Evaluation Accepting Relief Authorization for Alternative to Requirements of ASME Section Xi,Subarticle IWA-5250 Bolting Exam for Plants,Per 10CFR50.55a(a)(3)(i) ML20217P0381998-04-0606 April 1998 Safety Evaluation Supporting Amend 135 to License NPF-29 ML20217A0291998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Grand Gulf Nuclear Sation,Unit 1 ML20216J4211998-03-18018 March 1998 SER Approving Alternative to Insp of Reactor Pressure Vessel Circumferential Welds for Grand Gulf Nuclear Station ML20216J2021998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Grand Gulf Nuclear Station,Unit 1 ML20203A2891998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Grand Gulf Nuclear Station ML20247B4111997-12-31031 December 1997 1997 Annual Financial Rept for South Mississippi Electric Power Association ML20203H9741997-12-31031 December 1997 1997 Annual Operating Rept, for Ggns,Unit 1 ML20198P1121997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Grand Gulf Nuclear Station,Unit 1 ML20203B5581997-12-0404 December 1997 Special Rept 97-003:on 971111,valid Failure of Div 2 EDG Occurred,Due to Jacket Water Leak.Failure Reported,Per Plant Technical Requirements Manual Section 7.7.2.2 ML20203K4031997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Grand Gulf Nuclear Station,Unit 1 ML20199H3711997-11-19019 November 1997 SER Accepting Approving Request Relief from Requirements of Section XI, Rule for Inservice Insp of NPP Components, of ASME for Current or New 10-year Inservice Insp Interval IAW 50.55(a)(3)(i) of 10CFR50 ML20199F3431997-11-18018 November 1997 SER Accepting Rev 15 of Operational Quality Assurance Manual for Grand Gulf Nuclear Station,Unit 1 1999-09-09
[Table view] |
Text
'
b.
ENCLOSURE SAFETY EVALUATION REPORT FOR GENERIC LETTER 83-28, ITEM 1.2 - POST-TRIP REVIEW (DATA AND INFORMATION CAPABILITY)
GRAND GULF NUCLEAR STATION UNITS 1 AND 2 I. I,NTRODUCTION On February 25, 1983, both of the scram circuit breakers at Unit 1 of the Salem Nuclear Power Plant failed to open upon an automatic reactor trip signal from the reactor protection system. This incident occurred during the plant start-up and the reactor was tripped manually by the operator about 30 seconds after the initiation of the automatic trip signal. The failure of the circuit breakers has been determined to be related to the sticking of the under voltage trip attachment. Prior to this incident, on February 22, 1983, at Unit 1 of the Salem Nuclear Power Plant, an automatic trip signal was generated based on steam generator low-low level during plant start-up. In this case, the reactor was tripped manually by the operator almost coincidentally with the automatic trip. Following these incidents, on February 28, 1983, the NRC Executive Director for Operations (EDO), directed the staff to investigate and report on the generic implications of these occurrences at Unit 1 of the Salem Nuclear Power Plant. The results of the staff's inquiry into the generic implications of the Salem unit incidents are reported in NUREG-1000, " Generic Implications of the ATWS Events at the Salem Nuclear Power Plant." As a result of this investigation, the Commission (NRC) requested (by Generic Letter 83-28 dated July 8, 1983) all licensees of operating reactors, applicants for an operating license, and holders of
/
8510300120 851022 PDR ADOCK 05000416 P PDR
s construction permits to respond to certain generic concerns. These concerns are categorized into four areas: (1) Post-Trip Review, (2) Equipment Classification and Vendor Interface, (3) Post-Maintenance Testing, and (4) Reactor Trip System Reliability Improvements.
The first action item, Post-Trip Review, consists of Action Item 1.1,
" Program Description and Procedure" and Action Item 1.2, " Data and Information Capability." This safety evaluation report (SER) addresses Action Item 1.2 only.
II. REVIEW GUIDELINES The following review guidelines were developed after initial evaluation of the various utility responses to Item 1.2 of Generic Letter 83-28 and incorporate the best features of these submittals. As such, these review guidelines in effect represent a " good practices" approach to post-trip review- We have reviewed the licensee's response to Item 1.2 against these guidelines:
A. The equipment that provides the digital sequence of events (SOE) record and the analog time history records of an unscheduled shutdown should provide a reliable source of the necessary information to be used in the post-trip review. Each plant variable which is necessary to determine the cause and progression of the events following a plant trip should be monitored by at least one recorder (such as a sequence-of-events recorder or a plant process computer) for digital parameters; and strip
s.
,
,f charts, a plant process computer or analog recorder for analog (time history) variables. Performance characteristics guidelines for SOE and time history recorders are as follows:
Each sequence of events recorder should be capable of detecting and recording the sequence of events with a sufficient time discrimination capability to ensure that the time responses associated with each monitored safety-related system can be ascertained, and that a determination can be made as to whether the time response is within acceptable limits based on FSAR Chapter 15 Accident Analyses. The recomended guidelines for the SOE time discrimination is approximately 100 milliseconds. If cur nt 50E recorders do not have this time discrimination capability the licensee should show that the current time discrimination capability is sufficient for an adequate raconstruction of the course of the reactor trip and post-trip events. As a minimum this should include the ability to adequately reconstruct the transient and accident scenarios presented in Chapter 15 of the plant FSAR.
Each analog time history data recorder should have a sample interval small enough s'o that the incident can be accurately reconstructed following a reactor trip. As a minimum, the licensee should be able to reconstruct the course of the transient and accident sequences evaluated in the accident analysis of
s Chapter 15 of the plant FSAR. The recommended guideline for the sample interval 1s 10 seconds. If the time history equipment does not meet this guideline, the licensee should show that the time.
history capability is sufficient to accurately reconstruct the transient and accident sequences presented in Chapter 15 of the FSAR. To support the post-trip analysis of the cause of the trip l and the proper functioning of involved safety related equipment, each analog time history data recorder should be capable of s
updating and retaining information from approximately five minutes prior to the trip until at least ten minutes after the trip.
All equipment used to record sequence of events and time history information should be powered from a reliable and non-interruptible power source. The power source used need not be safety related.
B. The sequence of events and time history recording equipment should monitor sufficient digital and analog parameters, respectively, to assure that the course of the reactor trip and post-trip events can be reconstructed. The parameters ~ monitored should provide sufficient information to determine the root cause of the unscheduled shutdown, the progression of the reactor trip, and the response of the plant parameters and protection and safety systems to the unscheduled shutdowns. Specifically, all input parameters associated with reactor trips, safety injections and other safety-related systems as well as output parameters sufficient to record the proper functioning of these 3
systems should be recorded for use in the post-trip review. The parameters deemed necessary, as a minimum, to perform a post-trip review that would determine if the plant remained within its safety limit design envelope are presented in Table 1. They were selected on the a
basis of staff engineering judgment following a complete evaluation of utility submittals. If the licensee's SOE recorders and time history recorders do not monitor all of the parameters suggested in these tables the licensee should show that the existing set of monitored parameters are sufficient to establish that the plant remained within the design envelope for the accident ccnditions analyzed in Chapter 15 of the plant FSAR.
C. The information gathered by the sequence of events and time history recorders should be stored in a manner that will allow for data retrieval and analysis. The data may be retained in either hardcopy, (e.g.,computerprintout,stripchartrecord),orinanaccessible memory (e.g., magnetic disc or tape). This information should be presented in a readable and meaningful format, taking into consideration good human factors practices such as those outlined in NUREG-0700.
D. Retention of data from all unscheduled shutdowns provides a valuable reference source for the determination of the acceptability of the plant vital parameter and equipment response to subsequent unscheduled shutdowns. Information gathered during the post-trip review is to be
l
. l i
retained for the life of the plant for post-trip review comparisons of subsequent events.
III. EVALUATION AND CONCLUSION By letter dated November 2,1984, Mississippi Power and Light Company provided information regarding its post-trip review program data and information capabilities for Grand Gulf Nuclear Station Units 1 and 2. We have evaluated the licensee's submittal against the review guidelines described in Section II. Licensee deviations from the Guidelines of Section II were reviewed with<the licensee by telephone on May 23, 1985. A brief description of the licensee's responses and the staff's evaluation of the response against each of the review guidelines is provided below:
A The licensee has described the perfonnance characteristics of the equipment used to record the sequence of events and time history data needed for post-trip review. Based on our review, we find that the sequence of events and time history recorder characteristics conform to the guidelines described in Section II A, and are acceptable.
l
- 8. The licensee has established and identified the parameters to be monitored and recorded for post-trip review. Based on our review and as supplemented by our telephone review, we find that the parameters
- selected by the licensee include all of those identified in Table 1 and conform to the guidelines described in Section II B and are, therefore, acceptable.
l
D' C. The licensee has described the means for storage and retrieval of the information gathered by the sequence of events and time history-recorders, and for the presentation of this information for post-trip review and analysis. Based on our review and as supplemented by our
~
-telephone review, we find that this information will be presented in a ~
readable and meaningful format, and that the storage, retrieval and presentation conform to the guidelines of Section II C.
D.. The licensee has confirmed that the data and information used during post-trip reviews will be retained in an accessible manner for the life of the plant. Based on our telephone review, we find that the licensee's program for data retention conforms to the guidelines of Section II D, and is acceptable.
Based on our review, we conclude that the licensee's post-trip review data and information capabilities for-Grand Gulf Nuclear Station Units 1 and 2 are acceptable.
L
TABLE 1 BWR PARAMETER LIST SOE Time History Recorder Recorder Pa rameter/ Signal x Reactor Trip x Safety Injection x Containment Isolation x Turbine Trip x Control Rod Position x (1) x Neutron Flux, Power x(1) Main Steam Radiation (2) Containment (Dry Well) Radiation x (1) x Drywell Pressure (Containment Pressure)
(2) Suppression Pool Temperature x (1) x Primary System Pressure x(1) x Primary System Level x MSIV Position x (1) Turbine Stop Valve / Control Valve Position x Turbine Bypass Valve Position x Feedwater Flow x Steam Flow (3) Recirculation;-Flow. Pump Status x(1) Scram Discharge Level x (1) Condenser Vacuum
9-SOE Time History Recorder Recorder Parameter /Sianal x AC and DC Systen Status (Bus Voltage)
(3)(4) Safety Injection; Flow, Pump / Valve Status x Diesel Generator Status (on/0ff, Start /Stop)
(1) Trip parameters (2). Parameter may be recorded by either an SOE or time history recorder. l (3) Acceptable recorder options are: (a) system flow recorded on an SOE recorder, (b) system flow recorded on a time history recorder, or (c) equipment status recorded on an SOE recorder.
(4) Includes recording of parameters for all applicable systems from the following: HPCI, LPCI, LPCS, IC, RCIC.
l T
4
.