|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20011F5041990-02-16016 February 1990 Notification of 900223 Meeting W/Ge in Rockville,Md to Discuss Decommissioning at Vallecitos ML20210T6011986-02-12012 February 1986 Submits Daily Staff Notes.Region Iii,Nrr & Cleveland Electric Illuminating Co Will Meet on 860211 Onsite to Discuss Reviews Re 860131 Earthquake Near Site & Readiness of Plant for Fuel Loading ML20024D2031983-07-29029 July 1983 Advises That Time for Commission to Review ALAB-720 Expired. Commission Declined Review.Decision Became Final Agency Action on 830725 ML20050C6041982-04-0505 April 1982 Requests Copies of Licensee/Applicant Requests for Extension or Exemption Re Implementation of 10CFR73.21. Only Haddam Neck & Millstone Have Submitted Fees & Fee Forms ML20039C4051981-12-23023 December 1981 Informs That IE Info Notice 81-39, EPA Crosscheck Program - Low Level Radioiodine in Water Intercomparison Study, Has Been Sent to Listed Licensees ML20038A6221981-11-0606 November 1981 Releases Public Version of Radiological Emergency Plan ML20010F2951981-08-28028 August 1981 Advises That IE Info Notice 81-26, Compilation of Health Physics Related Info Items, Was Distributed to Listed Licensees ML20009G8941981-07-31031 July 1981 Advises That Encl IE Info Notice 81-22, Section 235 & 236 Amends to Atomic Energy Act of 1954, Was Sent to Listed Licensees on 810731 ML20009B2181981-07-0909 July 1981 Forwards NRC Exhibits Which Were Received Into Evidence During Getr 810527-0610 Show Cause Proceedings.W/O Encl ML20005A3931981-06-29029 June 1981 Forwards Photocopy of NRC Exhibit 7,reduced in Size.Original Exhibit Will Be Sent to Chairman Grossman.W/O Encl ML20005A2821981-06-26026 June 1981 Forwards Proposed Corrections to 810527-0610 Hearing Transcript ML19347F7151981-05-22022 May 1981 Informs That Parties Stipulated That Four Listed Matters Are Not in Issue in Show Cause Proceeding.Issues Concern Hillside Deposits Stability,Landslide Repts,Slope Displacement & Ground Surface Displacements ML19347E8801981-05-12012 May 1981 Submits List of NRC Exhibits Per 810507 Stipulation.Prefiled 810501 Written Proposed Testimony Will Be Offered Into Evidence & Bound Into Record as Though Read,Rather than Treated as Exhibits ML20008F9261981-05-11011 May 1981 Forwards Signed Stipulation Re Prehearing Conference & Hearing Matters.Prehearing Conference Telephone Call Changed from 810512 to 0513 ML20003H3711981-05-0101 May 1981 Forwards NRC Witness Testimonies Re Safety Evaluation of Geology of Getr Per ASLB 810203 Memorandum & Order.Portions of SER Will Be Presented as Exhibits.Certificate of Svc Encl ML20003G3551981-04-27027 April 1981 Informs That NRC Will Not Submit Response to Licensee 810422 Motion to Compel Discovery ML20126H2591981-04-0606 April 1981 Forwards Addl Copies of NRC 810403 Response to Intervenor Dellums Request for Production of Documents.W/O Encl ML19341C0011981-02-11011 February 1981 Requests That J Greeves Continue to Represent Technical Review Re Landslide & Soil Structure for Getr Hearing on Seismic Design Criteria ML19341C0291981-02-11011 February 1981 Requests That J Burdoin Continue Participation in ASLB Hearing Re Facility Seismic Design ML20002E4931981-01-27027 January 1981 Requests Processing Licensee Forwarding Review Fee for Security Plan ML19353A4461980-12-22022 December 1980 Forwards Evaluation of Soil Properties & Subgrade Rupture Mechanism Analysis for App B to Encl to .Under Combined Vibration & Subgrade Rupture Offset,Potential Fault Plane Beneath Reactor Will Be Deflected from Base ML19343A6381980-11-12012 November 1980 Summarizes ACRS 801106-08 Review of GE Request for Facility Restart.Licensee Must Show Facility Can Sustain Ground Level Accelerations of 0.75 Gravity W/O Surface Offset & 0.6 Gravity W/Surface Displacement ML20151B3451980-10-0606 October 1980 Forwards Overview of Geosciences Branch Workload,W/Priority Indicated.Requests Assistance W/Scheduling ACRS & Hearings ML19330A6531980-07-23023 July 1980 Notification of 800730 Meeting W/Ge in Bethesda,Md for Licensee Presentation of Addl Getr Structural Evaluations ML19318A7551980-06-11011 June 1980 Discusses Topics for Upcoming ACRS Subcommittee on Getr 800616-17 Meeting ML19296B1421980-01-25025 January 1980 Discusses 800124 Northern CA Earthquake,Measuring 5.5 on Richter Scale.No Serious Damage Occurred at Getr.Slight Motion Was Felt at Rancho Seco.Minor Architectural Damage Experience at Lll ML19257D0131980-01-10010 January 1980 Notification of 800130 Meeting W/Vendor in Bethesda,Md Re Presentation of Licensee Probability Analysis.Meeting Originally Scheduled for 800129 ML20148B8491980-01-10010 January 1980 Notification of 800129 Meeting W/Ge & Consultants in Bethesda,Md to Discuss Presentation of Licensee Probability Analysis ML19260D2921980-01-10010 January 1980 Notification of 800131 Meeting W/Ge in Bethesda,Md to Discuss Licensee Probability Analysis.Meeting Rescheduled from 800130 ML19263F4421980-01-0909 January 1980 Recommends That R Jackson 791212 Memo & NRC Rept, Reconnaissance Repts,Imperial Valley Earthquake,791015, Be Sent to Show Cause Proceeding Svc List ML19254D8041979-10-18018 October 1979 Notifies Commission of Decision to Discontinue Review of Getr as Currently Designed & Analyzed by Ge.Seismology & Geology Evaluation Encl ML19256E4111979-10-17017 October 1979 Discusses Seismology/Geology Review of Facility.Forwards Safety Evaluation Input.Surface Offset of 2.5 Meters Could Occur Beneath Facility.Review Re Facility Will Be Discontinued.W/O Encl ML19208A4521979-07-16016 July 1979 Forwards Board Notification 79-28 Re Fire Retardant Cable Coatings ML19208A5091979-06-26026 June 1979 Board Notification 79-28:fire Retardant Cable Coating. Unproperly Qualified Fire Retardant Cable Coating May Present Safety Problem ML19242A4911979-06-26026 June 1979 Discusses 790618 Getr Site Visit to Review Layouts of Completed & Proposed Mods for Facility Seismic Upgrade. Submits Resulting List of Questions Posed to GE ML19246C3741979-05-30030 May 1979 Forwards Questions from Us Geological Survey Re Seismological Aspects of Site.Requests Review of Technical & Policy Issues ML19261C4791979-03-14014 March 1979 Notification of 790320 Meeting W/Ge in Bethesda,Md to Discuss Licensee Presentation Re Recent Geologic Investigations for Test Reactor Site ML19261C5881979-02-23023 February 1979 Informs of Status of Geology Review:Licensee Final Documentation of Geology Investigations Expected by 790228. NRC Review Will Take Several Months ML19281A1091979-01-26026 January 1979 Requests That Addl Info Be Obtained to Complete Review of 790116 Application for Tech Spec Changes Deleting Certain Surveillance Testing Requirements During Extended Shutdown Period ML19261B2711979-01-22022 January 1979 Forwards 781212 Joint Ltr from Three Individuals Expressing Views Re Getr.Ltr Is Written Limited Appearance Statement Per 10CFR2.715 ML19263B6571979-01-10010 January 1979 Since Last Staff Status Rept,No Addl Discovery Requests Have Been Sent or Received ML20147C5581978-12-13013 December 1978 Forwards Status Rept of Dse Review of Geology as It Relates to Potential for Surface Faulting of Getr Site.Data Is Incomplete & Does Not Allow Final Conclusions.Encl Request for Addl Info ML20147H7361978-12-0505 December 1978 Corrects Error in NRC Staff Answer to Intervenors Request for Referral & Licensees Motion for Imposition of Sanctions, Dtd 781129.On p2 Denied Should Read Granted. Staff Supports Licensees Request to Impose Sanctions ML20147C4721978-11-27027 November 1978 Notice of 781205 Visit to Facil in Order to Inspect Trenches Completed in the Getr Site Fault Investigation ML19256A2301978-10-27027 October 1978 Rept on 781017 Site Visit to Make Preliminary Observations of Gen Elec-proposed Site Investigation.Believes That Until Main Scarp & Assoc Rupture Surface Are Located for Mapped Landslide Complex,The Stability Analysis Is Questionable ML20052A7461978-06-23023 June 1978 Ack Receipt of Congressman Dellum Re Allegations of Unsafe Conditions at GE Test Reactor.Forwards Insp Rept 50-070/78-02 on 780426-27 ML20052A7561978-06-19019 June 1978 Forwards Congressman Dellums Re Allegations of Unsafe Conditions at GE Test Reactor ML20147C8621978-02-0303 February 1978 Forwards 780201 USGS Review of Potential Faulting at Subj Site.Feels Staff Should Not Take Firm Position Until After Its Review.W/Encl ANO:7809250067 ML20147C8701978-01-0909 January 1978 Identifies Sys Which Are Req to Assure Adequate Core Cooling, & Specifies Operability Conditions That Must Be Met by Each Sys ML20147C9411977-12-14014 December 1977 Summary of 771202 Meeting Re Geological & Seismological Matters Relating to Seismic re-evaluation of Getr. Requests That Facility Provide Info Re Surface Faulting in Support of 771024 Show Cause Order.W/List of Attendees 1990-02-16
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20011F5041990-02-16016 February 1990 Notification of 900223 Meeting W/Ge in Rockville,Md to Discuss Decommissioning at Vallecitos ML20210T6011986-02-12012 February 1986 Submits Daily Staff Notes.Region Iii,Nrr & Cleveland Electric Illuminating Co Will Meet on 860211 Onsite to Discuss Reviews Re 860131 Earthquake Near Site & Readiness of Plant for Fuel Loading ML20024D2031983-07-29029 July 1983 Advises That Time for Commission to Review ALAB-720 Expired. Commission Declined Review.Decision Became Final Agency Action on 830725 ML20050C6041982-04-0505 April 1982 Requests Copies of Licensee/Applicant Requests for Extension or Exemption Re Implementation of 10CFR73.21. Only Haddam Neck & Millstone Have Submitted Fees & Fee Forms ML20039C4051981-12-23023 December 1981 Informs That IE Info Notice 81-39, EPA Crosscheck Program - Low Level Radioiodine in Water Intercomparison Study, Has Been Sent to Listed Licensees ML20038A6221981-11-0606 November 1981 Releases Public Version of Radiological Emergency Plan ML20010F2951981-08-28028 August 1981 Advises That IE Info Notice 81-26, Compilation of Health Physics Related Info Items, Was Distributed to Listed Licensees ML20009G8941981-07-31031 July 1981 Advises That Encl IE Info Notice 81-22, Section 235 & 236 Amends to Atomic Energy Act of 1954, Was Sent to Listed Licensees on 810731 ML20009B2181981-07-0909 July 1981 Forwards NRC Exhibits Which Were Received Into Evidence During Getr 810527-0610 Show Cause Proceedings.W/O Encl ML20005A3931981-06-29029 June 1981 Forwards Photocopy of NRC Exhibit 7,reduced in Size.Original Exhibit Will Be Sent to Chairman Grossman.W/O Encl ML20005A2821981-06-26026 June 1981 Forwards Proposed Corrections to 810527-0610 Hearing Transcript ML19347F7151981-05-22022 May 1981 Informs That Parties Stipulated That Four Listed Matters Are Not in Issue in Show Cause Proceeding.Issues Concern Hillside Deposits Stability,Landslide Repts,Slope Displacement & Ground Surface Displacements ML19347E8801981-05-12012 May 1981 Submits List of NRC Exhibits Per 810507 Stipulation.Prefiled 810501 Written Proposed Testimony Will Be Offered Into Evidence & Bound Into Record as Though Read,Rather than Treated as Exhibits ML20008F9261981-05-11011 May 1981 Forwards Signed Stipulation Re Prehearing Conference & Hearing Matters.Prehearing Conference Telephone Call Changed from 810512 to 0513 ML20003H3711981-05-0101 May 1981 Forwards NRC Witness Testimonies Re Safety Evaluation of Geology of Getr Per ASLB 810203 Memorandum & Order.Portions of SER Will Be Presented as Exhibits.Certificate of Svc Encl ML20003G3551981-04-27027 April 1981 Informs That NRC Will Not Submit Response to Licensee 810422 Motion to Compel Discovery ML20126H2591981-04-0606 April 1981 Forwards Addl Copies of NRC 810403 Response to Intervenor Dellums Request for Production of Documents.W/O Encl ML19341C0011981-02-11011 February 1981 Requests That J Greeves Continue to Represent Technical Review Re Landslide & Soil Structure for Getr Hearing on Seismic Design Criteria ML19341C0291981-02-11011 February 1981 Requests That J Burdoin Continue Participation in ASLB Hearing Re Facility Seismic Design ML20002E4931981-01-27027 January 1981 Requests Processing Licensee Forwarding Review Fee for Security Plan ML19353A4461980-12-22022 December 1980 Forwards Evaluation of Soil Properties & Subgrade Rupture Mechanism Analysis for App B to Encl to .Under Combined Vibration & Subgrade Rupture Offset,Potential Fault Plane Beneath Reactor Will Be Deflected from Base ML19343A6381980-11-12012 November 1980 Summarizes ACRS 801106-08 Review of GE Request for Facility Restart.Licensee Must Show Facility Can Sustain Ground Level Accelerations of 0.75 Gravity W/O Surface Offset & 0.6 Gravity W/Surface Displacement ML20151B3451980-10-0606 October 1980 Forwards Overview of Geosciences Branch Workload,W/Priority Indicated.Requests Assistance W/Scheduling ACRS & Hearings ML19330A6531980-07-23023 July 1980 Notification of 800730 Meeting W/Ge in Bethesda,Md for Licensee Presentation of Addl Getr Structural Evaluations ML19318A7551980-06-11011 June 1980 Discusses Topics for Upcoming ACRS Subcommittee on Getr 800616-17 Meeting ML19296B1421980-01-25025 January 1980 Discusses 800124 Northern CA Earthquake,Measuring 5.5 on Richter Scale.No Serious Damage Occurred at Getr.Slight Motion Was Felt at Rancho Seco.Minor Architectural Damage Experience at Lll ML19257D0131980-01-10010 January 1980 Notification of 800130 Meeting W/Vendor in Bethesda,Md Re Presentation of Licensee Probability Analysis.Meeting Originally Scheduled for 800129 ML20148B8491980-01-10010 January 1980 Notification of 800129 Meeting W/Ge & Consultants in Bethesda,Md to Discuss Presentation of Licensee Probability Analysis ML19260D2921980-01-10010 January 1980 Notification of 800131 Meeting W/Ge in Bethesda,Md to Discuss Licensee Probability Analysis.Meeting Rescheduled from 800130 ML19263F4421980-01-0909 January 1980 Recommends That R Jackson 791212 Memo & NRC Rept, Reconnaissance Repts,Imperial Valley Earthquake,791015, Be Sent to Show Cause Proceeding Svc List ML19254D8041979-10-18018 October 1979 Notifies Commission of Decision to Discontinue Review of Getr as Currently Designed & Analyzed by Ge.Seismology & Geology Evaluation Encl ML19256E4111979-10-17017 October 1979 Discusses Seismology/Geology Review of Facility.Forwards Safety Evaluation Input.Surface Offset of 2.5 Meters Could Occur Beneath Facility.Review Re Facility Will Be Discontinued.W/O Encl ML19208A4521979-07-16016 July 1979 Forwards Board Notification 79-28 Re Fire Retardant Cable Coatings ML19208A5091979-06-26026 June 1979 Board Notification 79-28:fire Retardant Cable Coating. Unproperly Qualified Fire Retardant Cable Coating May Present Safety Problem ML19242A4911979-06-26026 June 1979 Discusses 790618 Getr Site Visit to Review Layouts of Completed & Proposed Mods for Facility Seismic Upgrade. Submits Resulting List of Questions Posed to GE ML19246C3741979-05-30030 May 1979 Forwards Questions from Us Geological Survey Re Seismological Aspects of Site.Requests Review of Technical & Policy Issues ML19261C4791979-03-14014 March 1979 Notification of 790320 Meeting W/Ge in Bethesda,Md to Discuss Licensee Presentation Re Recent Geologic Investigations for Test Reactor Site ML19261C5881979-02-23023 February 1979 Informs of Status of Geology Review:Licensee Final Documentation of Geology Investigations Expected by 790228. NRC Review Will Take Several Months ML19281A1091979-01-26026 January 1979 Requests That Addl Info Be Obtained to Complete Review of 790116 Application for Tech Spec Changes Deleting Certain Surveillance Testing Requirements During Extended Shutdown Period ML19261B2711979-01-22022 January 1979 Forwards 781212 Joint Ltr from Three Individuals Expressing Views Re Getr.Ltr Is Written Limited Appearance Statement Per 10CFR2.715 ML19263B6571979-01-10010 January 1979 Since Last Staff Status Rept,No Addl Discovery Requests Have Been Sent or Received ML20147C5581978-12-13013 December 1978 Forwards Status Rept of Dse Review of Geology as It Relates to Potential for Surface Faulting of Getr Site.Data Is Incomplete & Does Not Allow Final Conclusions.Encl Request for Addl Info ML20147H7361978-12-0505 December 1978 Corrects Error in NRC Staff Answer to Intervenors Request for Referral & Licensees Motion for Imposition of Sanctions, Dtd 781129.On p2 Denied Should Read Granted. Staff Supports Licensees Request to Impose Sanctions ML20147C4721978-11-27027 November 1978 Notice of 781205 Visit to Facil in Order to Inspect Trenches Completed in the Getr Site Fault Investigation ML19256A2301978-10-27027 October 1978 Rept on 781017 Site Visit to Make Preliminary Observations of Gen Elec-proposed Site Investigation.Believes That Until Main Scarp & Assoc Rupture Surface Are Located for Mapped Landslide Complex,The Stability Analysis Is Questionable ML20052A7461978-06-23023 June 1978 Ack Receipt of Congressman Dellum Re Allegations of Unsafe Conditions at GE Test Reactor.Forwards Insp Rept 50-070/78-02 on 780426-27 ML20052A7561978-06-19019 June 1978 Forwards Congressman Dellums Re Allegations of Unsafe Conditions at GE Test Reactor ML20147C8621978-02-0303 February 1978 Forwards 780201 USGS Review of Potential Faulting at Subj Site.Feels Staff Should Not Take Firm Position Until After Its Review.W/Encl ANO:7809250067 ML20147C8701978-01-0909 January 1978 Identifies Sys Which Are Req to Assure Adequate Core Cooling, & Specifies Operability Conditions That Must Be Met by Each Sys ML20147C9411977-12-14014 December 1977 Summary of 771202 Meeting Re Geological & Seismological Matters Relating to Seismic re-evaluation of Getr. Requests That Facility Provide Info Re Surface Faulting in Support of 771024 Show Cause Order.W/List of Attendees 1990-02-16
[Table view] |
Text
i nuc og of h UNITED STATES j
)3( ( ,g NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 205SS l
- s. ;
4 + January 10, 1980 l
Docket No. 50-70 MEMORANDUM FOR: Robert W. Reid, Chief Operating Reactors Branch #4 Division of Operating Reactors FROM: Chris Nelson, Project Manager Operating Reactors Branch #4 Division of Operating Reactors
SUBJECT:
FORTHCOMING MEETING WITH GENERAL ELECTRIC i Date & Time: January 29, 1980 9:00 a.m.
Location: Phillips Building Bethesda, Maryland Room P-110
Purpose:
Presentation of licensees Probability Analysis regarding GETR
Participants:
NRC C. Nelson, R. Jackson, J. Greeves, J. Martore, W. Yesely, and D. Swanson LICENSEE R. Darmitzel and D. Gilliland CONSULTANTS J. Devine, R. Morris, L. Whi te, and W. Hall 6
Chris Nelson, Project Manager Operating Reactors Branch #4 Division of Operating Reactors cc: See next page i 8 0 01240 M f
z=r 7
~~
.. General Electric Company .
cc w/ enclosure (s):
Californie D'epartment of Health '
ATTN: Chief Environmental Radiatio" Dr. Harry Foreman, Member -
Control Unit Atomic Safety and Licensir.; Board Radiologic Health Section Box 395, Mayo 714 P Street, Room 498 University of Minnesota Sacramento, California 95184 Minneapolis, Minnesota 55455 Honorable Ronald V. Dellurs Ms. Barbara Shockley ATTN: Ms. Nancy Snow 1890 Bockman Road General Delivery, Civic Center San Lorenzo, California 94530 Station Oakland, California 94604 Advisc / Committee on Reactcr c af: guards Friends of the Earth U. S. Nuclear Regulatory Commission ATTN: W. Andree Baldwin, Esquire Washincton, D. C. 20555 Legal Director 124 Spear Street Mr. R. W. Darmitzel, Manager San Francisco, California 94105 Irradiation Processing Product Section Vallecitos Nuclear Center Jed Somit, Esquire General Electric Company 100 Sush Street P. O. Box 460 Pleasanton, California 94566 Suite 304 San Francisco, California 94104
- Herbert Grossman, Esq. , Chairman Atomic Safety and Licensing Board U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Mr.Gustaved.Linenbercer, Member Atomic Safety and Licensing Board U. S. Nuclear Regulatory Commission Washington, D. C. 20555 i
George Edgar, Esquire l Morgan, Lewis & Bockius +
1800 M Street, NW Washington, D. C. 20035 f
1 l
I
- - - __ _ x. __ __
MEETING l'0TI:E :ISTRIEU ION J
C;35:
Docket File W. Gammill NRC PDR L. Snao J. Miller ORB #4 Rdg H. Gaut, State Prograns NRR Rdg F. T. Kuo (seistic reviews only) ,
H. Denton AIOC E. G. Case I
D. Eisenhut R. Vollmer W. Russell B. Grimes T. J. Carter A. Schwencer D. Ziemann T. Ippolito R. Reid V. Noonan P. Check G. Lainas G. Knighton Project fianager DELD DI&E(3)
OSD S. Showe, I&E (PWR)
R. Ingram Receptionist, Bethesda R. Fraley, ACRS (16) '
Program Support Branch TERA 7 J. R. Buchanan Meeting Notice File NRC Participants C. Nelson R. Jackson J. Greeves J. Martore W. Vesely D. Swanson