ML20117A371

From kanterella
Revision as of 22:26, 15 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Mods to Amend 23 to ABWR Ssar.Mods Includes Partial Resolution of COL License Info,Codes & Stds Update,Piping Audit Responses,Expansion of Inservice testing,60-yr Vessel Surveillance Plan & Update of Dose Assessment
ML20117A371
Person / Time
Site: 05200001
Issue date: 11/20/1992
From: Recasha Mitchell
GENERAL ELECTRIC CO.
To: Pierson R
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML20117A373 List:
References
MFN-193-92, SLK-9298, NUDOCS 9211300015
Download: ML20117A371 (2)


Text

y -

ck '

GE Nuclear Energy L .% . .._ ._ . . . _ . _ _ . _ _ _ , _ ___ ___ _ ___ __ _

l t u ce o a.; s - as b

November 20,1992 MFN No.193 92 Docket No. STN 52-001 SLK-9298 ,

A Document Control Desk U.S. Nudear Regulatory Commission Washiogton, D.C. 20555 Attention: Robert C. Pierson, Director Standardization and Non-Power Reactor Project Directorate i i

p

Subject:

Submittal of Amendment 23 to GE's AHWR SSAR

Reference:

Submittal of Amendment 23, Proprietary Information, to GE's ABWR SSAR, MFN 194-92, dated November 20,1992 Enclosed are thirty four copies of selected sections of Chapter 1, Introduction ancLGeneraL_ _.

Description of Phmt, Chapter 2, S!te Characteristics, Chapter 3, Design of Structures, Component:,

Equipinent, and Systems, Chrpter 4, Reac*or, Chapter 5, Reactor Coolant System and Connected Systerns, Chapter 6, Engineered Safety Features, Chapter 7, Instrumentation and Control Systems, I Chapter 8, Electric Power, C', apter 9, Attriliary Systems, Chapter 10, Steam and Power Conversion System, Chapter 11, Radioactice Il'aste Management, Chapter 12, Radiation Protection, Chapter 13, Conduct of Operations, Chapter 14, Initial Test Program, Chapter 15, Accident Analysis, Chapter 17, Quality Assurance, Chapter 18, Human Factors Engineering, Chapter 19, Response so Sevire Accident Policy Statement, Chapter 20, Guestion and Response Guide, of tVe Standard Safety Analysis Report (fSAR) for the Advanced Boiling Water Reactor (ABWR).

The modifications to the chapters above included the following:

1. Partial t esolution of COL license information
2. Codes and standr .s update
3. Piping audit responses
4. Expansion of in-service testing
5. 60 year vessel surveillance plan
6. Upc...te of fire protection and fire hazards analysis
7. Update of dose assessment
8. Update ofinitial test program
9. Re-evaluation of ATWS performance
10. Major revision to human factors engineering
11. Major revision of fault trees.

.50000G V

\

lDR211300015 921120 p, ADOCK 05200001 PDR L

r.

\

Document Control Desk Docket No. STN 52-001 U.S. Nuclear Regulatory Commission h1FN 193-92 November 20,1992 Page 2 In future amendments, a tabulation of open and confirmatory items will be provided as part of the transmittal. This list will indicate the SSAR page(s) that correspond to the resolution of the items.

Changes to the various sections of the SSAR are identified on the attached Page Change i Instruction. The 11 x 17 inch drawings are also being mailed at this time.

Sincerely,

h. C htki.M1. "

R. C. Mitchell. Acting Manage Regulatory and Analysis Services cc: R. C. Berglund (GE)

T. E. Murley (NRC)

J. M. Crutchfield (NRC)

D, J. McGoff (DOE)

F. J. Miraglia, Jr. (NRC)

C. Postusny, Jr. (NRC) _ . - . _ _ . _ - . _ _ .

K. E. Stahlkopf (EPRI)

F. A. Ross - (DOE)

N. D. Fletcher (DOE) c i

e

h. .

I l

. + - . ..,_,,.~,-.--,-..._..,_._;.._.-~_.c.;_--,-_-._,._,

._,---_-_a__,~.......;.-_..-,-,__,...._.........