MONTHYEARML20202H8821997-12-0303 December 1997 Final Response to FOIA Request for Documents.Records in App a Being Made Available in PDR & Encl IA-97-428, Final Response to FOIA Request for Documents.Records in App a Being Made Available in PDR & Encl1997-12-0303 December 1997 Final Response to FOIA Request for Documents.Records in App a Being Made Available in PDR & Encl ML20202H8981997-10-27027 October 1997 FOIA Request for Listed Pages from Section 19 of General Electric ABWR Ssar ML20210J3591997-08-11011 August 1997 Transmits Revised Fda for Us ABWR Std Design,Per App 0 of 10CFR52.FDA Allows ABWR Std Design to Be Ref in Application for Const Permit or Operating License,Per 10CFR50 or in Application for Combined License,Per 10CFR52 ML20149J7101997-07-23023 July 1997 Requests That R Simard Be Removed from Service Lists & R Bell Be Added to Svc Lists,Due to Recent NEI Reorganization ML20148A5701997-05-0202 May 1997 Forwards Affirmation Ltr Complying W/Filing Requirements of 10CFR52.45(d) & 50.30(b) Re Application for Review of ABWR Design Control Document,Rev 4 for Design Certification ML20196F8771997-03-28028 March 1997 Forwards Licensee ABWR Design Control Document,Rev 4 to Incorporate Changes Needed to Reflect Commission SRM Decisions & Subsequent Discussion W/Staff & to Support Ssar ML20137G3161997-03-28028 March 1997 Forwards Rev 4 to Ge'S ABWR Design Control Document to Incorporate Changes That Are Needed to Reflect Commission SRM Decisions & Subsequent Discussions W/Staff ML20147C1041997-01-23023 January 1997 Responds to Requesting Opportunity to Review Design Certification Rule for ABWR Before Sent to Ofc of Fr for Publication.Request Denied ML20133A9791996-12-18018 December 1996 Approves Rules Certifying Asea Brown Boveri-Combustion Engineering Sys 80+ & General Electric Nuclear Energy Advanced Boiling Water Reactor ML20133A9811996-12-18018 December 1996 Informs That NRC Has Approved Rules Certifying Two Evolutionary Reactor Designs:Asea Brown Boveri-Combustion Engineering Sys 80+ & GE Nuclear Energy ABWR ML20133A9871996-12-18018 December 1996 Informs of NRC Approval of Rules Certifying Two Evolutionary Reactor Designs,Asea Brown Boveri-CE Sys 80+ & GE Nuclear Energy ABWR ML20133A9901996-12-18018 December 1996 Informs That NRC Has Approved Asea Brown Boveri CE Sys 80+ & GE Nuclear Energy ABWR as Evolutionary Reactor Designs ML20133B0191996-12-18018 December 1996 Informs of Approval of Rules Certifying Two Evolutionary Reactor Designs,Asea Brown Boveri-Combustion Engineering Sys 80+ & GE Nuclear Energys Advanced BWR ML20128P4981996-09-23023 September 1996 Forwards Proposed Rule Language for 3 Design Certifications Discussed at 960827 NRC Briefing ML20128N6001996-09-16016 September 1996 Provides Addl Info in Response to Several Questions Raised by Commission During 960827 Briefing on Design Certification Rulemaking ML20117H3311996-08-30030 August 1996 Forwards GE ABWR Dcd,Rev 3 (Filed in Category A),Abwr Cdm, Rev 8 (Filed in Category a) & ABWR Ssar,Amend 37,Rev 9 (Filed in Category K) to Incorporate Changes Ref in 960701 & s from Jf Quirk ML20115C0861996-07-0101 July 1996 Forwards GE Providing Background for Need for Proposed Changes to ABWR Design Control Document (Dcd), Markups Incorporating Comments Resulting from Interactions W/Nrc & DCD Markups for Addl Proposed Change ML20115G2201996-06-10010 June 1996 Provides Comments from Two NRR Organizations on Cdm & Ssar Change Pages.Markups of DCD & Ssar Encl ML20108D4481996-04-26026 April 1996 Responds to Staff Ltr Re ABWR DCD Change Package Which Recommends That GE Submit All Changes Identified by Foake Program.Ltr Contrary to Previous Understandings ML20107H3241996-04-16016 April 1996 Forwards marked-up Proposed Changes to ABWR Design Description Resulting from Info Developed in Course of ABWR Engineering Program ML20108D3111996-04-0303 April 1996 Forwards Marked Up Proposed Changes to ABWR Design Description Resulting from Info Developed in Course of ABWR First-Of-A-Kind Engineering Program ML20101G9021996-03-22022 March 1996 Forwards Amend 36 to Rev 8 to 23A6100, ABWR Ssar & Rev 7 to 25A5447, Certified Design Matl ML20101P1231996-03-15015 March 1996 Expresses Appreciation for Opportunity on 960308 to Brief Commission on Views on Design Certification Rules, Particularly W/Respect to Issue of Applicable Regulations ML20092G0171995-09-15015 September 1995 Forwards Missing Pp 103-117 from Attachment B of from SR Specker on Behalf of GE Nuclear Energy Re Response to Proposed RM for Std Design Certification of Us Advanced BWR Design LD-95-041, Forwards Response to Ocre 950812 Comment on Design Features of GE Abwr.Disagrees W/Any Suggestion That NRC Extend Favorable Consideration of Comment to Sys 80+ Std Plant Design1995-09-0505 September 1995 Forwards Response to Ocre 950812 Comment on Design Features of GE Abwr.Disagrees W/Any Suggestion That NRC Extend Favorable Consideration of Comment to Sys 80+ Std Plant Design ML20092B6431995-09-0101 September 1995 Forwards Analysis of Ocre 950812 Supplemental Comments on Design of Abwr,Notice of Final Rule & Statement of Considerations,In Order to Ensure That NRC Has Complete Technical Info on Subj ML20086G7981995-07-12012 July 1995 Informs of Changes to Svc List,Per Request of Jn Fox ML20084Q0621995-05-31031 May 1995 Forwards Revised Effective Page Listing for ABWR Design Control Document ML20078F4271995-01-26026 January 1995 Provides Info for Closure of ABWR FSER Confirmatory Item F1.2.2-2 Previously Addressed in 941222 Closure Ltr ML20077R9141995-01-17017 January 1995 Forwards Rev 2 to ABWR Design Control Document. Rev of Design Control Document Accompanied by List of Currently Effective Pages.List Provided as Attachment 2 ML20081K9361994-12-22022 December 1994 Documents Closure of ABWR FSER Confirmatory Items ML20080D3341994-12-22022 December 1994 Forwards Rev 1 to Advanced BWR Design Control Document ML20077A7471994-11-23023 November 1994 Forwards Revised Fda for Us ABWR Std Design,Per App O of 10CFR52 & Notice of Issuance of Fda ML20081K9031994-11-18018 November 1994 Forwards Rev 0 to Technical Support Document (Tsd) for ABWR & Updated ABWR Ssar App 19P Markup.Updated Version of App 19P Incorporated as Attachment a to Tsd,As Agreed During 941006 Meeting W/Nrc ML20073M7221994-11-0404 November 1994 Forwards Proposed Rev to Section 3.8 of DCD Introduction for ABWR Re GE Meeting on 941102 ML20078E6391994-11-0101 November 1994 Forwards Description of Proposed Process for Controlling Changes to Severe Accident Evaluations & Explains Bases for Proposed Process ML20149G9751994-10-31031 October 1994 Requests That Encl Ltrs Be Distributed to Controlled Copy of Licensee QA Program ML20149G7081994-10-28028 October 1994 Forwards Rev 0 to ABWR Design Control Document (Dcd). DCD Comprised of Introduction,Certified Design Matl & Approved Safety Analysis Matl.Responses to NRC Comments Requested by Also Encl ML20081K8881994-10-13013 October 1994 Maintains That Proposition That GE Be Designated in Notice of Proposed Rulemaking as Source from Which Public Could Request Copies of Design Control Document (DCD) Inappropriate.Public Should Obtain Access to DCD from NRC ML20076F8451994-10-0505 October 1994 Responds to Re Root Cause & Corrective Measures on Unidentified Changes That Occurred in Design Control Document ML20081K8721994-09-20020 September 1994 Requests That ABWR Final Design Approval (Fda) Be Amended to Provide for Term of 15 Years from Date of Issuance & That,As Provided in SRM on COM-SECY-95-025,FDA Be Updated as Needed to Conform to Any Changes Resulting from Certification RM ML20149F7681994-09-0707 September 1994 Forwards Rev 0 to Advanced BWR Design Control Document ML20072T2691994-08-30030 August 1994 Advises That Industry Intends to Comment in Opposition to Applicable Regulations Approach & Proposed Text of Applicable Regulations in Design Certification Rulemaking Proceeding for Both ABWR & Sys 80+ ML20072Q2811994-08-30030 August 1994 Submits mark-up of Previous Version of Design Control Document Introduction Together W/Typed Rev ML20072C9821994-08-12012 August 1994 Responds to Re NRC Fee Regulations for Design Certification & Request Confirmation of Understanding of 10CFR170 ML20072E3381994-08-0909 August 1994 Requests Addition of Author Name to Svc List for Advanced BWR ML20072A8451994-08-0303 August 1994 Forwards Chapter 21 17x22 Inch Drawings to Replace Temporary 11x17 Drawings Provided in ML20071Q9091994-08-0202 August 1994 Forwards Ten Copies of Draft ABWR Design Control Document ML20070H9651994-07-20020 July 1994 Forwards Rev 7 to 23A6100, ABWR Ssar, Amend 35 & Rev 6 to 25A5447, ABWR Certified Design Matl 1997-08-11
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20202H8981997-10-27027 October 1997 FOIA Request for Listed Pages from Section 19 of General Electric ABWR Ssar ML20149J7101997-07-23023 July 1997 Requests That R Simard Be Removed from Service Lists & R Bell Be Added to Svc Lists,Due to Recent NEI Reorganization ML20148A5701997-05-0202 May 1997 Forwards Affirmation Ltr Complying W/Filing Requirements of 10CFR52.45(d) & 50.30(b) Re Application for Review of ABWR Design Control Document,Rev 4 for Design Certification ML20196F8771997-03-28028 March 1997 Forwards Licensee ABWR Design Control Document,Rev 4 to Incorporate Changes Needed to Reflect Commission SRM Decisions & Subsequent Discussion W/Staff & to Support Ssar ML20137G3161997-03-28028 March 1997 Forwards Rev 4 to Ge'S ABWR Design Control Document to Incorporate Changes That Are Needed to Reflect Commission SRM Decisions & Subsequent Discussions W/Staff ML20128P4981996-09-23023 September 1996 Forwards Proposed Rule Language for 3 Design Certifications Discussed at 960827 NRC Briefing ML20128N6001996-09-16016 September 1996 Provides Addl Info in Response to Several Questions Raised by Commission During 960827 Briefing on Design Certification Rulemaking ML20117H3311996-08-30030 August 1996 Forwards GE ABWR Dcd,Rev 3 (Filed in Category A),Abwr Cdm, Rev 8 (Filed in Category a) & ABWR Ssar,Amend 37,Rev 9 (Filed in Category K) to Incorporate Changes Ref in 960701 & s from Jf Quirk ML20115C0861996-07-0101 July 1996 Forwards GE Providing Background for Need for Proposed Changes to ABWR Design Control Document (Dcd), Markups Incorporating Comments Resulting from Interactions W/Nrc & DCD Markups for Addl Proposed Change ML20115G2201996-06-10010 June 1996 Provides Comments from Two NRR Organizations on Cdm & Ssar Change Pages.Markups of DCD & Ssar Encl ML20108D4481996-04-26026 April 1996 Responds to Staff Ltr Re ABWR DCD Change Package Which Recommends That GE Submit All Changes Identified by Foake Program.Ltr Contrary to Previous Understandings ML20107H3241996-04-16016 April 1996 Forwards marked-up Proposed Changes to ABWR Design Description Resulting from Info Developed in Course of ABWR Engineering Program ML20108D3111996-04-0303 April 1996 Forwards Marked Up Proposed Changes to ABWR Design Description Resulting from Info Developed in Course of ABWR First-Of-A-Kind Engineering Program ML20101G9021996-03-22022 March 1996 Forwards Amend 36 to Rev 8 to 23A6100, ABWR Ssar & Rev 7 to 25A5447, Certified Design Matl ML20101P1231996-03-15015 March 1996 Expresses Appreciation for Opportunity on 960308 to Brief Commission on Views on Design Certification Rules, Particularly W/Respect to Issue of Applicable Regulations ML20092G0171995-09-15015 September 1995 Forwards Missing Pp 103-117 from Attachment B of from SR Specker on Behalf of GE Nuclear Energy Re Response to Proposed RM for Std Design Certification of Us Advanced BWR Design LD-95-041, Forwards Response to Ocre 950812 Comment on Design Features of GE Abwr.Disagrees W/Any Suggestion That NRC Extend Favorable Consideration of Comment to Sys 80+ Std Plant Design1995-09-0505 September 1995 Forwards Response to Ocre 950812 Comment on Design Features of GE Abwr.Disagrees W/Any Suggestion That NRC Extend Favorable Consideration of Comment to Sys 80+ Std Plant Design ML20092B6431995-09-0101 September 1995 Forwards Analysis of Ocre 950812 Supplemental Comments on Design of Abwr,Notice of Final Rule & Statement of Considerations,In Order to Ensure That NRC Has Complete Technical Info on Subj ML20086G7981995-07-12012 July 1995 Informs of Changes to Svc List,Per Request of Jn Fox ML20084Q0621995-05-31031 May 1995 Forwards Revised Effective Page Listing for ABWR Design Control Document ML20078F4271995-01-26026 January 1995 Provides Info for Closure of ABWR FSER Confirmatory Item F1.2.2-2 Previously Addressed in 941222 Closure Ltr ML20077R9141995-01-17017 January 1995 Forwards Rev 2 to ABWR Design Control Document. Rev of Design Control Document Accompanied by List of Currently Effective Pages.List Provided as Attachment 2 ML20080D3341994-12-22022 December 1994 Forwards Rev 1 to Advanced BWR Design Control Document ML20081K9361994-12-22022 December 1994 Documents Closure of ABWR FSER Confirmatory Items ML20081K9031994-11-18018 November 1994 Forwards Rev 0 to Technical Support Document (Tsd) for ABWR & Updated ABWR Ssar App 19P Markup.Updated Version of App 19P Incorporated as Attachment a to Tsd,As Agreed During 941006 Meeting W/Nrc ML20073M7221994-11-0404 November 1994 Forwards Proposed Rev to Section 3.8 of DCD Introduction for ABWR Re GE Meeting on 941102 ML20078E6391994-11-0101 November 1994 Forwards Description of Proposed Process for Controlling Changes to Severe Accident Evaluations & Explains Bases for Proposed Process ML20149G9751994-10-31031 October 1994 Requests That Encl Ltrs Be Distributed to Controlled Copy of Licensee QA Program ML20149G7081994-10-28028 October 1994 Forwards Rev 0 to ABWR Design Control Document (Dcd). DCD Comprised of Introduction,Certified Design Matl & Approved Safety Analysis Matl.Responses to NRC Comments Requested by Also Encl ML20081K8881994-10-13013 October 1994 Maintains That Proposition That GE Be Designated in Notice of Proposed Rulemaking as Source from Which Public Could Request Copies of Design Control Document (DCD) Inappropriate.Public Should Obtain Access to DCD from NRC ML20076F8451994-10-0505 October 1994 Responds to Re Root Cause & Corrective Measures on Unidentified Changes That Occurred in Design Control Document ML20081K8721994-09-20020 September 1994 Requests That ABWR Final Design Approval (Fda) Be Amended to Provide for Term of 15 Years from Date of Issuance & That,As Provided in SRM on COM-SECY-95-025,FDA Be Updated as Needed to Conform to Any Changes Resulting from Certification RM ML20149F7681994-09-0707 September 1994 Forwards Rev 0 to Advanced BWR Design Control Document ML20072Q2811994-08-30030 August 1994 Submits mark-up of Previous Version of Design Control Document Introduction Together W/Typed Rev ML20072T2691994-08-30030 August 1994 Advises That Industry Intends to Comment in Opposition to Applicable Regulations Approach & Proposed Text of Applicable Regulations in Design Certification Rulemaking Proceeding for Both ABWR & Sys 80+ ML20072C9821994-08-12012 August 1994 Responds to Re NRC Fee Regulations for Design Certification & Request Confirmation of Understanding of 10CFR170 ML20072E3381994-08-0909 August 1994 Requests Addition of Author Name to Svc List for Advanced BWR ML20072A8451994-08-0303 August 1994 Forwards Chapter 21 17x22 Inch Drawings to Replace Temporary 11x17 Drawings Provided in ML20071Q9091994-08-0202 August 1994 Forwards Ten Copies of Draft ABWR Design Control Document ML20070H9651994-07-20020 July 1994 Forwards Rev 7 to 23A6100, ABWR Ssar, Amend 35 & Rev 6 to 25A5447, ABWR Certified Design Matl ML20070D9381994-07-12012 July 1994 Forwards D-RAP Design Description & ITAAC for Inclusion in Section 3.6 of Cdm & Cdm & Ssar Markups Addressing Minor Corrections ML20069Q3001994-06-23023 June 1994 Forwards Rev 6 for Ssar Amend 35 & Rev 5 for Certified Design Matl ML20070E1981994-06-0808 June 1994 Forwards Ssar Markup Indicating Applicable Edtion to UBC, AISI SG-673 & NEMA FB1 to ABWR Ssar.Changes Will Be Included in Amend 35 Mod Package.Notifies That Applicable Edition of Bechtel Rept BC-TOP-3-A Is Rev 3 ML20070E1891994-06-0808 June 1994 Forwards Ssar Markup of Section 1A.2.34 Which Responds to TMI Item III.D.1(1).Mod Makes Section Consistent W/Ts 5.5.2.2.Change Will Be Included in Amend 35 Mod Package Scheduled for Distribution Later This Month ML20070D9331994-05-26026 May 1994 Forwards Results of Analyses to Assess Impact of Drywell Spray Actuation Following LOCA to Ensure Bounding Scenario ML20069H2101994-05-25025 May 1994 Forwards 25A5447,Rev 4, ABWR Certified Design Matl & Nonproprietary & Proprietary Version of 23A6100,Rev 5, ABWR Ssar. Proprietary Version of Ssar Withheld ML20069G9301994-05-25025 May 1994 Submits non-proprietary Ssar Amend 35 & Certified Design Material Rev 4 to Listed NRR Recipients ML20069B1831994-05-25025 May 1994 Resubmits Affidavit for GE Abwr,Proprietary Info Section 18H, Supporting Analysis for Emergency Control Operation Info ML20069A7371994-05-20020 May 1994 Forwards Proprietary Ssar Sections 11A.2 & 11A.4 to Specified NRR Recipients Listed on Attachment 1.Encl Withheld ML20029D4211994-04-29029 April 1994 Forwards Revised Ssar Markups Responding to Commitments Made at 940415 Meeting in Rockville,Md,Including Addl Info Reflecting Locking Mechanisms of Subassemblies & European Experience & Finalized TS for CRD Removal - Refueling 1997-07-23
[Table view] |
Text
<- ,
cq- m '
ll 4 ,
),; ,
GENuclearEnergy l ' Genera lElectnc Company 175 Curtner Avenue. San Jose. CA 951?S i September 7,1994 ' MFN No.106-94 .
Docket No.52-001 .
Docket Control Desk' ;
U.S. Nuclear Regulatory Commission >
Washington, D.C. 20555 ;
Attention: R. W. Borchardt, Director i Standardization Project Directorate l t
SUBJECT:
SUBMITTAL OF ABWR DESIGN CONTROL DOCUMENT (DCD)
REFERENCES:
- 1. Letter, Dennis M. Crutchfield toJoseph Quirk, dated August 3,1994. ;
- 2. Letter, Thomas H. Boyce toJoseph Quirk, " Comments on Sections of the :
Draft Design Control Document (DCD), " dated August 23,1994. l
- 3. Letter, Jack Fox to Tom Boyce," Requested Sections of the Draft ABWR DCD," dated August 2,1994. i
- 4. Letter, Joseph Quirk to Tom Boyce, " Revision to Draft DCD Introduction for the ABWR," dated August 30,1994.
1 In accordance with direction of NRR project staff, GE is providing nine (9) copies of the subject DCD to the NRR recipients listed on Attachment 1. Further, one (1) copy is enclosed for the Document Control Desk. This is being done to accelerate the distribution process and ensure timely staff receipt of the DCD.
This submittal responds to the Reference 1 request for a complete DCD submittal to be provided to the staffin early September 1994. Included in this submittal are our
- responses (Attachment 2) to Refere sce 2 comments on Reference 3. It should be t
noted that these responses incorporate the related discussions at the August 23,1994 meedng in Rockville, Maryland. Also included in this submittal e changes to our Reference 4 DCD Introduction which reflect the August 31,1.i4 meeting.
Sincerely, g hA k; Y Ji h F. Quirk jg M 86 4 roject Manager ABWR Certification g
a ,.~ ~_~ ~,'
M/C 782-(408) 92%219 cc: with enclosure w/o enclosure w/o enclosure A.J. Beard (GE) T.H. Boyce (NRC) F.J. Miraglia (NRC)
N.D. Fletcher (DOE) D.M. Crutchfield (NRC) N.T. Patel (GE)
S.P. Frantz J.N. Fox (GE) - W.H. Rasin (NEI)
(Newman, Bauknight ...) S.M. Franks (DOE) F.A. Ross (DOE)
M.A. Rowden S.A. Hucik (GE) W.T. Russell (NRC)
.(Fried, Frank ...) D.J. McGoff(DOE) K.E. Stahlkoph (EPRI) 9409190302 94o907 PDR ADOCK 052oo001 A' .PDR.
- 4 A'ITACHMENT 1 t
DIRECT SHIPMENT OF DCD REVISION O (DRAFT) ,
TO NRC RECIPIENTS OUANTITY RECIPIENT 1 PUBLIC DOCUMENT ROOM 'i 2 RICHARD W.BORCHARDT ,
1 GOUTAM BAGCHI ,
- 1. CONRAD E.McCRACKEN 1 TIMOTHY G. COLLINS 1 EDWARD J. BUTCHER 1 BRUCE A.BOGER ,
I RICHARD J. BARRETT ,
F i
b l
i l
l l
, ATTACHMENT 2 1
ABWR DCD SUBMITTAL OF AUGUST 2,1994 GE RESPONSES TO NRC COMMENTS DATED AUGUST 23,1994 I. Comments on DCD Tier 2* Items from NRC Proiects and OGC '
- l. The method of delineation of Tier 2* infonnation is as agreed to at the August 23,1994 meeting at the NRC.
- 2. GE agrees. Same as response I.1 above.
II. Comments on DCD Tier 2* Items for Structural Codes and Standards
- 1. Note 1 in Table 3.84 of the DCD is deleted.
- 2. Table 2 of DCD/ Introduction (Formerly Tier 2 Table 3.8-11) is revised by replacing ASME with ASME III, Division 2, in the first row, and by replacing ASME with ASME III, Division 1,in the second row.
III. Comments on DCD Tier 2* Items Pertainine to Motor-Onerated Valves The markings for identification of the commitments in the last two paragraphs at the bottom of Page 3.9-78 are removed.
IV. Comments on DCD Tier 2* Items Pertainine to Eauioment Dynamic Oualification
- 1. Page 3.10-2, Second Paragraph Delineation is made accordingly.
Page 3.7-21, First Paragraph As agreed to in the GE/NRC meeting of August 23,1994, delineation of Subsecdon 3.9.2.2.1.1 per next comment is also idendfied under Tests and Analyses of Table 6 of DCD/ Introduction.
Page 3.9-14, Second Paragraph Delineation is made accordingly in Subsection 3.9.2.2.1.1, which is listed in ;
Table 6 of DCD/ Introduction under " rest Input Modon." +
- 2. The five identified areas of Table 6 of DCD/Introducdon (former Tier 2 Table 3.10-1) are identified with the suggested subsecdons for Tier 2* designadons, f except for adding Subsection 3.7.3.1 as noted above in Item 1. It should be noted ,
- that Appendix SK now is a collection of the paragraphs from the GE proprietary !
report NEDE-24326-1-P that correspond to the Tier 2*-designated- paragraphs of !
the former submitted Appendix SK. This is done because of the Project ,
direction to retain the proprietary references (see Tier 2, Subsections 3.9.8 and l 3.11.7).
t
.A-
d
. 2
, ABWR DCD SUBMITTAL OF AUGUST 2,1994
. i GE RESPONSES TO NRC COMMENTS DATED AUGUST 23,1994 V. Comments on DCD Tier 2* Items Pertainine to Pinine Desien Accentance Criteria GENERAL: GE had scrutinized thoroughly Secdon 3.12 of Advance SER of December 1993 before Tier 2* delineation for piping DAC in the .
submittal. Necessity of the delineations and their implications and ramificadons were considered. Some commented delineations were already made. After GE/NRC meedng of August 23,1994, GE has reviewed NUREG-1503 (FSER). GE appreciates the staf1's specific .
comments, which are accepted except for few. As discussed and
~
agreed at the meedng, the commented COL items are not delineated. t Other excepdons are very minor issues that can be resolved quickly upon the stafl's reconsideration following the review of the accompanying submittal incorporating the comments.
- 1. The comment is incorporated.
- 2. The comment is incorporated.
- 3. Since the COL action items require NRC staff review and approval, they are not required to be delineated. [
- 4. Same as response V.S. above. ;
- 5. a. SSAR Subsection 3.9.1.3 applies to other components also. SSAR Subsection 3.9.1.3.1 on snubbers and restraints is merely descripdve. One of the guideline for delineadon is that descripdve information need not be .
designated. FSER Section 3.12.3.1 does not specifically identify key !
concerns for snubbers and restrains that necessitate delineation; it merely references FSER Sections 3.12.6 and 3.12.7, which are adequately covered by the incorporated delineations. Key concerns should be those that are unique to ABWR certification. Also, key concerns should be unique to piping -
system versus other components.
- b. SSAR Subsecdons 3.7.3.6,3.7.3.7.1,3.7.3.7.2 and 3.7.3.8.1.6 are delineated I accordingly.
- c. The comment is incorporated. i
- d. The comment is incorporated, except for delineating SSAR Section 3.7.2.1.2 which is very general.
- c. The comment is incorporated.
- f. The comment is incorporated.
l
, 3-ABWR DCD SUBMITTAL OF AUGUST 2,1994 -
GE RESPONSES TO NRC COMMENTS DATED AUGUST 23,1994
- g. GE has delineated the last paragraph in SSAR Subsection 3.2.5.3 for I walkdown of main steam leakage path. ,.
- 6. The comment is incorporated.
- 7. Modeling of pipe supports was already include. See Table 7 of ,
DCL)/ Introduction (former Tier 2 Table 3.9-11). There is no SSAR Subsection 3.7.3.3.6 mentioned in the comment. Subsection 3.7.3.3.1.6 of the DCD is delineated and excludes the reference to Subsection 3.7.5.3 which is a COL item (see response V.3 above).
- 8. The comment is incorporated. See response V.5.e above for Subsection 3.7.3.8.1.9.
- 9. a. Table 3.9-1 is applicable to other components. Sixty-year life is factored in ,
Table 3.9-1; there is no discussion of factor 1.5 in Sub.cecdon 3.9.1. It is '
delineated in Subsection 3.9.3.1 on Page 3.9-28. ELigue evaluation for ASME Class 2 or 3 piping by COL applicant is under same delineation. See Table 7 of DCD/ Introduction, " Design Transients" and " Fatigue Evaluation of ASME Code Class 2 and 3 Piping". Relative to COL item Subsection 3.9.7.2, see '.
response V.3 above.
- b. The restriction on use of ASME Code Case N-411-1 damping for ISM analysis is delineated in Subsection 3.7.3.8.1.10 and for energy absorbing _
supports in Subsection 3.7.3.8.1.7. See response V.5.c above. ;
- c. Subsection 3.7.3.7.2 for high frequency modes is delineated per response :
V.5.b above.
- d. Relative to COL item Subsection 3.9.7.2, see responses V.3 and V.9.a above.
- c. The comment is incorporated.
- f. Subsection 3.9.2.1.3 is descriptive for test program of feedwater line thermal l stratification. Subsection 3.9.3.1, which makes the commitment of the test, is J delineated for Thermal Stratification. ,
l
- g. The comment is incorporated. !
I
- h. The comment is incorporated. )
l
- i. The comment is incorporated. See responses V.5.b and V.9.c above for high- .
frequency modes.
j The comment is incorporated. l i
j
$ j
. '4
- ABWR DCD SUBMITTAL OF AUGUST 2,1994 ;
GE RESPONSES TO NRC COMMENTS 0 DATED AUGUST 23,1994 l
1 k'. The comment is incorporated. t i
- 1. Third paragraph,last line of SSAR Subsecdon 3.9.3.1 (Page 3.9-27) is !
delineated.
m . Fourth paragraph, first line of SSAR Subsection 3.9.3.1 (Page 3.9-27) is delineated. i e
- 10. a. The comment is incorporated. l
- b. The comment is incorporated. t t
- c. Subsection 3.9.3.4 is already delineated for safety factors of anchor bolts. l This delineation is expanded to include base plate flexibilities. ;
- d. The comment is incorporated. ;
l
- c. The comment is incorporated. 'l
- f. The comment is incorporated. ;
- g. The comment is incorporated. f r
- h. The comment is incorporated. {
- i. The comment is incorporated. l
- j. The comment is incorporated. ;
i
- k. The comment is incorporated. j
- l. The comment is incorporated. !
- 11. a. The comment is incorporated. l
- b. The comment is incorporated. l
- c. Same as response V.3 above. !
i
- d. Same as response V.3 above.
- 12. Same as response V.3 above. Note that the LBB analysis is optional. Note also ~
that FSER NUREG-1503, Section 3.12.8 states "... the use of the LBB approach has :
not been pre-approved by the staffin the ABWR design certification phase." !
Therefore, the analysis method in the SSAR is not delineated.
i i
. 5 i ABWR DCD SUBMITTAL OF AUGUST 2,1994 GE RESPONSES TO NRC COMMFJVTS DATED AUGUST 23, 1994 VI . Comments on DCD Tier 2* hems Pertainine to Human Factors (1) The comment is incorporated.
The boiler-plate paragraph in Section 18E.1 delineates entire Appendix 18E, except for Section 18E.1, Introduction, which is merely editorially descriptive in nature and not technical. GE feels that,in order to include only the necessary material as Tier 2* material, some material, such as a historical or editorial description, should be excluded.
(2) It should be noted that the comparison table will not be a part of the DCD. It was prosided to staff to facilitate its review.
(3) As explained in response Vi(1) above, the boiler-plate paragraph added in Section 18E.1 delineates entire Appendix 18E, except for Section 18E.1, Introduction, which is merely editorially descriptive in nature and not technical. GE feels that,in order to include only the necessary material as Tier 2* material, some material, such as a historical or editorial description, should be excluded.
As agreed to in the GE/NRC meeting of August 23,1994, all 44 pages are delineated except for a portion of Section 18E.1 as mentioned above.
GE agrees that Figure 18E-1, which is optional, is excluded from the boiler-plate paragraph added in Section 18E.1.
(4) Table 18E-1 refers to Industrial Codes and Standards. For example, Items (III)(1)(a)(v) and (vi) of the table are IEEE-1023 and MII,H-46855B, respectively.
Table 1.8-21 of the DCD and SSAR lists the applicable revision (i.e., effective date or edition year) of the documents as mentioned in SSAR Section 1.8.2. In order that the documents referenced by Table 18E-1 are not delisted in the future from Table 1.8-21, such documents are identined by a marking "(5)" related to Footnote (5) at the end of Table 1.8-21 that states, "See Section 18E.1." See Pages 1.8-43,1.8-46 and 1.8-47 for the example documents and Footnote (5). A clearer statement of Footnote (5) now made is as follows: "See Section 18E.1 for required use of this document."
VII. Comments on DCD Tier 2* Items and Chanter 19 Pertainine to Reactor Systems l
- 1. a. The comment is incorporated. Third paragraph of Section4.2 is delineated ,
partially to include only Tab AY (NEDE-31152P). Subsection 4.3.2.1 and )
Figure 4.3-1 are also delineated. l i
- b. Figures 4.2-1 and 4.2-2 are delineated explicitly. l l
l 1
I
. 6 u ,
ABWR DCD SUBMITTAL OF AUGUST 2,1994 GE RESPONSES TO NRC COMMENTS DATED AUGUST 23,1994
- c. Paragraphs 4.2.3.1.2(1) and (2) are delineated.
- d. References 4.2-1 and 4.2-2 are delineated explicitly. i
- c. The typographical error in Table 8 of DCD/ Introduction (former Tier 2 Table 4.2-1) is corrected.
- f. Per Project direction, proprietary SSAR Appendix 4B is not a part of the DCD but is delineated by a footnote.
- g. The paragraph (j) identified in the comment is now included in Section 4.2, third paragraph, and delineated.
- h. The last sentence of Section 4C.1 is delineated.
- 2. The issue of contents of DCD Chapter 19, and incorporation of shutdown risk evaluation was discussed at the August 23,1994 meeting at the NRC.
Appendix 19L, ABWR Shutdown Risk Evaluation, and Appendix 19Q, ABWR Risk Assessment, are modified and included per the agreement at the meeting.
Vill. Comments on DCD Chaoter 19 from Containment Systems
- 1. GE has included SSAR Chapter 19 material, as agreed to in the GE/NRC meeting of August 23,1994.
The purpose of the cross-reference was two-fold: (1) To identify the SSAR Chapter 19 material that was not included in Chapter 19 and elsewhere of the proposed draft DCD package and (2) To breakdown the omitted SSAR Chapter 19 material into two portions so as to identify a portion that is supportive of the material in the proposed package or is deterministic per Guidances 5b, c, and d of NRC letter of August 3,1994.
- 2. Same as response VIII.1 above.
- 3. The comment does not seem to be consistent with guidance of NRC letter of August 3,1994. The DCD should be independent of FSER. However, as Table 2 of the crosvreferences in Attachment 3b of the August 2,1994 submittal showed, material supporting containment features for severe accident (SSAR Table 19.8-7 ) was proposed to be retained in DCD Chapter 19 or other chapters.
. 7 ABWR DCD SUBMITTAL OF AUGUST 2,1994 .
L GE RESPONSES TO KRC COMMENTS DATED AUGUST 23,19%
IX. Comments on DCD Chaoter 19: Corrections for ABWR DCD The comments made to 1/26/94 version and to 8/2/94 are considered and incorporated as appropriate. ;
X. Comments on DCD from Instrumentation & Controls All comments were accepted in the GE/NRC meeting of August 23,1994 and are !
incorporated. GE appreciates the staff's specific comments which facilitated the ,
resolution.
t Tables 9,10 and 11 of DCD/ Introduction identify the delineated material per the comments. ,
1 I
s b
i t
9 t
,